You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. AEROBALLISTIC DATA ACQUISITION SYSTEM (ADACS)

    SBC: Q-DOT, INC.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  2. AN ENVIRONMENT FOR SIMULATION MODELING OF DISTRIBUTED SYSTEMS

    SBC: INNOVATIVE RESEARCH, INC.            Topic: N/A

    THE DEVELOPMENT OF SIMULATION MODELS OF A DISTRIBUTED SYSTEMS AND THEIR MAPPING INTO A PARALLEL SYSTEM, IS A HIGHLY COMPLEX TECHNICAL TASK BECAUSE OF THE GREAT INFLUENCE ITS VARIOUS ELEMENTS WILL HAVE ON ITS PERFORMANCE. THERE ARE MAJOR TECHNICAL ISSUES INVOLVED IN PERFORMING SUCH COMPLEX SIMULATION EFFORT, INCLUDING UNIQUE REQUIREMENTS SIMULATION MODELS, VARIED ARCHITECTURAL CONCEPTS OF DISTRIBUT ...

    SBIR Phase II 1991 Department of DefenseArmy
  3. A PORTABLE FM-CW DOPPLER RADAR TO PROVIDE METEOROLOGICAL DATA IN THE FIELD

    SBC: Ophir Corporation            Topic: N/A

    A PORTABLE, LOW COST FM-CW DOPPLER WEATHER RADAR IS PROPOSED TO PROVIDE "REAL-TIME" METEOROLOGICAL DATA IN THE FIELD. SUCH A SYSTEM WOULD ASSIST BATTLEFIELD DECISION MAKING BY MONITORING CONDITIONS PERTINENT TO MICROWAVE DUCTING, ARTILLERY CONTROL, AND DETERMINING LOCAL WEATHER. CURRENT DOPPLER WEATHER RADARS TEND TO BE PULSED, VERY LARGE, AND TO COST MILLIONS OF DOLLARS; THEY REQUIRE A LARGE OPER ...

    SBIR Phase I 1991 Department of DefenseArmy
  4. APPLICATIONS OF NEW CHEMICAL HEAT SOURCES

    SBC: TDA RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  5. AUTONOMOUS DISTRIBUTED RF POWER MONITOR CONCEPTS

    SBC: Spectrum Materials Inc            Topic: N/A

    THE CONCEPT FOR AN AUTONOMOUS, DISTRIBUTED RF POWER MONITOR SYSTEM IS DESCRIBED. THE SYSTEM IS CAPABLE OF MONITORING RF POWER LEVELS OVER A FREQUENCY RANGE OF 300 KHZ TO 100 GHZ. AUTOMATIC OPERATION AND HARDWARE REDUNDANCY ENABLE THE SYSTEM TO CONTINUE OPERATION EVEN IF SOME ELEMENTS FAIL OR ARE REMOVED FOR MAINTENANCE. THE SYSTEM CONCEPT IS ADAPABLE TO REMOTE AREAS AND REQUIRES NO DEDICATED POWER ...

    SBIR Phase I 1991 Department of DefenseArmy
  6. CREATION OF AS-BUILT DRAWINGS IN CAD SYSTEMS

    SBC: Antech Inc.            Topic: N/A

    N/A

    SBIR Phase II 1991 Department of DefenseArmy
  7. DESIGN OF A TACTICAL MULTI-MEDIA INFORMATION COMMUNICATION SYSTEM (MMICS)

    SBC: Command Control, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  8. DEVELOPMENT OF A HUYGENS' SURFACE EMP SIMULATOR (HSES)

    SBC: Electro Magnetic            Topic: N/A

    AN INNOVATIVE CONCEPT FOR A NEW CLASS OF EMP SIMULATORS IS PROPOSED. THE ELECTROMAGNETIC EQUIVALENCE PRINCIPLE IS APPLIED TO PROVIDE A THREAT LEVEL SIMULATION WITH A BANDWIDTH GOAL OF 1 GHZ AND ARBITRARY ANGLES OF INCIDENCE AND POLARIZATION ARE PROVIDED BY SOFTWARE. IT IS ENVIRONMENTALLY SOUND AND IS HIGHLY AUTOMATED. IT IS EXPECTED TO BE LESS EXPENSIVE TO PROCURE AND MAINTAIN THAN CONVENTIONAL ME ...

    SBIR Phase I 1991 Department of DefenseArmy
  9. ECM RESISTANT GLOBAL POSITIONING SYSTEM (GPS) RECEIVER

    SBC: THE NAVSYS CORPORATION            Topic: N/A

    GPS IS PLANNED TO BE USED BY THE U.S. ARMY IN A VARIETY OF TACTICAL SCENARIOS. FIRE CONTROL APPLICATIONS ARE CURRENTLY BEING INVESTIGATED WHERE GPS WOULD BE USED TO TRACK REGISTRATION ROUNDS AND LOCATE RADIOSONDES. SINCE GPS IS A RADIONAVIGATION SYSTEM, ITS EFFECTIVENESS IN A TACTICAL ENVIRONMENT IS LIMITED BY ITS SUSCEPTIBILITY TO ELECTRONIC COUNTERMEASURES (ECM). IT IS PARTICULARLY DIFFICULT TO ...

    SBIR Phase I 1991 Department of DefenseArmy
  10. FEASIBILITY STUDY FOR INTEGRATED ANTENNA-AMPLIFIER NETWORK

    SBC: Green Mountain Radio Research Company            Topic: N/A

    OPERATION OF A JAMMER TRANSMITTER FROM A SMALL PLATFORM (RPV OR JEEP) NECESSITATES THE USE OF ELECTRICALLY SHORT ANTENNAS SUCH AS SHORT WHIPS AND SMALL LOOPS. THE CONVENTIONAL APPROACH USES A POWER AMPLIFIER DESIGNED FOR A 50-OHM LOAD AND AN ANTENNA TUNER THAT MATCHES THE ANTENNA-INPUT IMPEDANCE TO OHMS. HOWEVER, THE RAPID FREQUENCY CHANGES REQUIRED BY JAMMERS PRECLUDE THE USE OF ANTENNA TUNING. T ...

    SBIR Phase II 1991 Department of DefenseArmy
US Flag An Official Website of the United States Government