You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Air Launch Testbed for Endoatmospheric Hypersonic Trajectories

    SBC: GENERATION ORBIT LAUNCH SERVICES, INC.            Topic: AF141081

    ABSTRACT:This SBIR proposal covers the preliminary design and initial hardware and software in-the-loop testing of the GOLauncher 1, a single stage liquid air launched rocket system, for utilization in future hypersonic flight testing efforts. Major objectives include completing prelimianry design of the system based on requirements defined during Phase I, further validation of cost and schedule e ...

    SBIR Phase II 2015 Department of DefenseAir Force
  2. Improved Satellite Ground C3

    SBC: Braxton Technologies, LLC            Topic: AF131069

    ABSTRACT:Braxtons primary goal is to integrate and test advanced space asset command, control, and communications (C3) assets so that the current low bandwidth, high cost USAF systems can use high bandwidth, high reliability, low cost, automated commercial communications assets and system resource planning methods.Braxton will leverage 20 years of tracking, telemetry and commanding (TT&C), mission ...

    SBIR Phase II 2015 Department of DefenseAir Force
  3. GPS PNT Flexible Satellite Modulation

    SBC: THE NAVSYS CORPORATION            Topic: AF141122

    ABSTRACT:The objective of this effort is to investigate designs and possible options for a Position, Navigation, and Timing (PNT) flexible satellite for GPS to enhance PNT capabilities at a low cost.A desired feature to help overcome GPS coverage issues due to terrain, spoofing, jamming and interference is to broadcast military signals at higher power than the civilian signals.Under the Phase I SB ...

    SBIR Phase II 2015 Department of DefenseAir Force
  4. Positioning, Navigating, Timing, Communications, Architecture, Mission Design

    SBC: Data Fusion Corporation            Topic: AF141252

    ABSTRACT:Data Fusion Corporation (DFC) proposes to extend their existing suite of Global Positioning System (GPS) structured interference ( both known & determinable) mitigation algorithms and software by developing a new algorithm and related software suitable for mitigating unstructured interference sources, such as from random noise generators. These new algorithms will compute blind estimation ...

    SBIR Phase II 2015 Department of DefenseAir Force
  5. Optical System for Precision Atomic Clocks and Stable Oscillators

    SBC: STABLE LASER SYSTEMS INC            Topic: AF141126

    ABSTRACT:The reliability of optical atomic clocks is very dependent lasers which have long lock times to the line-narrowing reference (Fabry-Perot cavity) and atomic reference. This work builds a laser at 657 nm and a polarization maintaining frequency comb for this purpose.BENEFIT:Optical atomic clocks will lead to improved timing stability, enabling reduced range error in navigation systems.

    SBIR Phase II 2015 Department of DefenseAir Force
  6. Integrated Opto-Electronic Components for Multiaxis Inertial Measurement Units

    SBC: VESCENT PHOTONICS LLC            Topic: AF141134

    ABSTRACT:Vescent Photonics proposes to develop a laser system complete with drive electronics to support the superluminal IMU development at Northwestern University and Digital Optics Technology by Selim Shahriar. The technology will also be applicable to other research programs such as DARPA IMPACT, DARPA CSCAN, DARPA STOIC, AFRL CSTAR, and other future atomic clock development programs. Vescent ...

    SBIR Phase II 2015 Department of DefenseAir Force
  7. Chromate-Free Fuel Tank Coating

    SBC: TDA RESEARCH, INC.            Topic: AF141168

    ABSTRACT:Current aircraft fuel tank coatings provide excellent corrosion protection but do so by incorporating chromates.Unfortunately, these hexavalent chromates are carcinogens, and their use and disposal is strictly regulated.An ideal aircraft fuel tank coating would provide effective corrosion protection without the use of chromates.In this SBIR project TDA will develop a chromate free, room t ...

    SBIR Phase II 2015 Department of DefenseAir Force
  8. Advanced Space Antenna for GPS

    SBC: FIRST RF CORPORATION            Topic: AF141243

    ABSTRACT:Since the first NAVSTAR GPS satellite was launched, GPS has become one of the most important technologies used by modern military and civilian systems. While the legacy GPS constellation continues to provide support for many military applications, there is growing demand to identify and implement systems to enhance the capability of the constellation by ensuring more robust GPS service es ...

    SBIR Phase II 2015 Department of DefenseAir Force
  9. Beyond Fault Diagnosis and Failure Prognosis Fault Tolerant Control of Aerospace Systems

    SBC: GLOBAL TECHNOLOGY CONNECTION, INC.            Topic: AF141214

    ABSTRACT:Global Technology Connection, Inc., in collaboration with its academic and industrial partners proposes to develop a hierarchical 3-tier fault tolerant architecture to improve aircraft reliability, safety, and availability. The hierarchical system will support autonomous decisions for aircraft mission modification, trajectory planning, and controller reconfiguration. The architecture in ...

    SBIR Phase II 2015 Department of DefenseAir Force
  10. Sampling Enhancements at Radio Frequencies & Upgrade architectures for Radar (SERFUR)

    SBC: COLORADO ENGINEERING INC.            Topic: AF141187

    ABSTRACT:This Phase II program objectives are to develop a tool for the assessment of practical implementation of advanced radar processing algorithms and architectures (e.g., MIMO or noise radars) and to build a novel hardware sub-system to demonstrate a low SWaP modular, configurable/upgradeable architecture for data conversion and radar processing. Combined, the two objectives will provide the ...

    SBIR Phase II 2015 Department of DefenseAir Force
US Flag An Official Website of the United States Government