You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Green Rooftop System for Commercial Buildings with Superior Energy Efficiency

    SBC: XIMAX Technologies Corporation Ltd            Topic: 18NCERP2

    This proposed Small Business Innovative Research (SBIR) Phase II project is to develop, prototype and commercialize a Green Rooftop Technology with superior building energy efficiency to significantly reduce energy consumption of our nation’s industrial and commercial buildings. Besides, this proposed technology can significantly extend the lifespan of current building rooftop materials to ...

    SBIR Phase II 2019 Environmental Protection Agency
  2. A Low Cost, Long Life Zinc Oxide Based Sorbent

    SBC: TDA RESEARCH, INC.            Topic: N/A

    Coal fired Gasifer Combined Cycles (GCC) have both high efficiency and very low emissions. A critical need for GCCs is a method of removing the H2S produced from the sulfur in the coal from the hot gases. There has been extensive research on hot gas clean-up systems, focused on the use of a zinc oxide based sorbent (e.g., zinc titanate). Unfortunately, current sorbents are relatively expensive, ...

    SBIR Phase II 1995 Environmental Protection Agency
  3. An Alternative Concrete Chemistry with Significantly Enhanced Durability, Sustainability, Economy, Safety and Strength

    SBC: METNA CO            Topic: 14NCER5A

    Portland cement concrete is the most widely used construction material, and is a prevalent component of construction and demolition (C&D) waste. The large carbon footprint and energy content of Portland cement concrete; the constraints on its strength, durability and capability to encapsulate toxic elements; and the low value of C&D waste concrete have created a growing demand for alternative ceme ...

    SBIR Phase I 2015 Environmental Protection Agency
  4. A NEW CHARGE BASED COAGULANT DOSE CONTROL INSTRUMENT

    SBC: Clear Corporation            Topic: N/A

    The catastrophic drinking water treatment plant failure in March 1993 in Milwaukee was a direct result of the inability to control coagulant chemical dosage during significant changed in raw water quality. This event largely dispelled the myth that only small water utilities were vulnerable to such control problems. The current state of this critical technology, coagulant dose control, is woeful ...

    SBIR Phase II 1995 Environmental Protection Agency
  5. AN IMPROVED NOXSO PROCESS

    SBC: TDA RESEARCH, INC.            Topic: N/A

    Coal is the largest source of power generation in the U.S.A. but its conbustionproduces SOx and NOx which must be removed from the flue gas. Current removaltechniques (limestone base Flue Gas Desulfurization and Selective CatalyticReduction) are effective but expensive due to the large amouth of sorbentconsumed. The leading regenerable process is the NOXSO process, which wses asodium aluminate s ...

    SBIR Phase I 1995 Environmental Protection Agency
  6. A Novel Extractant for the Selective Removal of Arsenic from Industrial Wastewaters

    SBC: TDA RESEARCH, INC.            Topic: N/A

    The combustion of fossil fuels, particularly coal, introduces large quantities of arsenic into the environment, much of which reaches natural waters. Acute arsenic poisoning results from ingestion of only 100 mg of the element, while chronic poisoning occurs with the continued ingestion of smaller amounts. Processes developed for arsenic removal from drinking water are appropriate for small volu ...

    SBIR Phase II 1995 Environmental Protection Agency
  7. APPLICATION OF PULSE COMBUSTION IN SOLID AND HAZARDOUS WASTE INCINERATION

    SBC: Sonotech Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Environmental Protection Agency
  8. CATALYSTS FOR THE OXIDATION OF NO TO NO2

    SBC: TDA RESEARCH, INC.            Topic: N/A

    Nitrogen oxides (NO and NOx, collectively referred to as NOx) are among the mostpervasive and difficult emissions to control. NOx emissions can be reducedsomewhat by combustion modification techniques, but these reduce operatingefficiency and will not reduce levels to meet requirements of currentlegislation. Post combustion control is also difficult. Currently, there areno commercial catalytic ...

    SBIR Phase I 1995 Environmental Protection Agency
  9. Chronological Sweat Sensor Patch for Real-Time Human Molecular Biomarker Monitoring

    SBC: TDA RESEARCH, INC.            Topic: DHA18003

    Sweat contains biomarkers that give an indication of human cognitive levels. In this SBIR project TDA Research is developing a modular sweat sensor patch that has the capability to not only carry out real-time monitoring of select biomarkers, but also to

    SBIR Phase II 2019 Department of DefenseDefense Health Agency
  10. CONVERSION OF HAZARDOUS CHROMIUM PLATING SLUDGE INTO ALUMINOTHERMIC CHROMIUM METAL

    SBC: Climax Research Services            Topic: N/A

    Chromium plating sludge waste from hard and decorative chromium platingoperations is classified as a hazardous waste and its disposal is a majorenvironmental concern. Climax Research Services (CRS) will develop techniquesto recycle the chromium metal values in the sludge back into the domesticmetallurgical industry as purified aluminothermic chromium metal. This proposaladdresses initially the h ...

    SBIR Phase I 1995 Environmental Protection Agency
US Flag An Official Website of the United States Government