You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DESIGN GUIDELINE DEVELOPMENT

    SBC: Architectural Energy Corporati            Topic: N/A

    THE PROPOSED PROJECT WILL DEVELOP CLIMATE SIMILARITY INDEX- ING THAT WILL ALOW THE DEVELOPMENT OF ENERGY DESIGN GUIDELINES FOR RESIDENTIAL, COMMERCIAL, TRANSPORTATION AND AGRICULTURAL BUILDINGS AND SHELTERS. THE CLIMATE SIMILARITY INDEXING APPROACH IS BASED ON THE ANALYSIS OF TMY WEATHER FILES TO GENERATE CLIMATE INDICES SHOWN TO BE RELATED FOR BUILDING ENERGY PERFORMANCE. THUS, A REPRESENTATIVE L ...

    SBIR Phase I 1985 Department of Commerce
  2. PREDICTION RESOURCES

    SBC: Colorado Research Development            Topic: N/A

    THE PROPOSED RESEARCH WILL DELINEATE IN DETAIL THE INFORMATION CAPABILITY AND POTENTIAL OF THE NATIONAL WEATHERSERVICE AND WILL DEVELOP THE SPECIFIC INFORMATION REQUIREMENTS OF THE PRIVATE INDUSTRIAL SECTOR FOR WATER MANAGEMENT UTILIZING TO THE FULLEST EXTENT INFORMATION AVAILABLE FROM THE FEDERAL GOVERNMENT PREDICTION SERVICES OFTHE NATIONAL WEATHER SERVICE. THE INFORMATION WILL INCLUDE,BUT IS NO ...

    SBIR Phase I 1985 Department of Commerce
  3. PORTABLE MICROWAVE RADIOMETER FOR REAL-TIME REMOTE SENSING OF ATMOSPHERIC WATER VAPOR TO IMPROVE GLOBAL POSITIONING SYSTEM (GPS) ACCURACY

    SBC: Ophir Corporation            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of Commerce
  4. PORTABLE MICROWAVE RADIOMETER FOR REAL-TIME REMOTE SENSING OF ATMOSPHERIC WATER VAPOR TO IMPROVE GLOBAL POSITIONING SYSTEM (GPS) ACCURACY

    SBC: Ophir Corporation            Topic: N/A

    PROTOTYPE MICROWAVE RADIOMETERS CAPABLE OF MEASURING ATOMSPHERIC WATER VAPOR AND LIQUID BY OBSERVATION OF LINE-OF-SIGHT EMISSION AT 20.6 AND 31.6 GHZ RESPECTIVELY ARE NOW IN USE AT SEVERAL RESEARCH LABORATORIESS. THESE PROTOTYPE RADIOMETERS ARE BULKY, EXPENSIVE TO BUILD, AND ARE NOT AVAILABLE COMMERCIALLY. THERE IS A GROWING DEMAND FOR THESE INSTRUMENTS FOR USE IN GEODETIC, RADIO ASTRONOMY, AND ME ...

    SBIR Phase II 1986 Department of Commerce
  5. FISH MAPPER: VIDEO BASED MICRO-COMPUTER IMAGE PROCESSING SYSTEM

    SBC: Architectural Energy Corporati            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Commerce
  6. FISH MAPPER: VIDEO BASED MICRO-COMPUTER IMAGE PROCESSING SYSTEM

    SBC: Architectural Energy Corporati            Topic: N/A

    THE PROPOSED PROJECT WILL DEVELOP A VIDEO BASED COMPUTER IMAGE PROCESSING SYSTEM CONSISTING OF A 180 DEGREES LENS AND VIDEO CAMERA WHICH IS LINKED TO A VIDEO RECORDER AND MICRO-COMPUTER. THE VIDEO RECORDER ALLOWS FOR STORAGE OF THE IMAGES WHILE THE MICRO-COMPUTER ALLOWS RAPID REAL-TIME ASSESSMENT OF THE UNDERWATER IMAGE WHICH INCLUDES, BUT IS NOT LIMITED TO: (A) ANALYZING MOVEMENT PATTERNS OF FISH ...

    SBIR Phase II 1988 Department of Commerce
  7. DEVELOPMENT OF MESOSCALE MODELS FOR MINICOMPUTER

    SBC: Wels Research Corp.            Topic: N/A

    WE HAVE DEVELOPED A MESOSCALE NUMERICAL PREDICTION MODEL WHICH RUNS ON A MICROCOMPUTER, CURRENTLY AN HP-9000/520. FOR OPERATIONAL APPLICATIONS OF THIS MODEL IN REAL TIME, WE WILL REQUIRE A DATA COMMUNICATIONS LINK TO ACCESS FAA CIR- CUIT 604. THE DATA RECEIVED VIA THIS CHANNEL CONSIST OF SYNOPTIC RADIOSONDE AND SURFACE OBSERVATIONS. BEFORE THESE DATA CAN BE ASSIMILATED INTO OUR NUMERICAL PREDICTIO ...

    SBIR Phase I 1988 Department of Commerce
  8. AUTOMATED TOTAL PRECIPITATION GAGE

    SBC: Eti Instrument Systems Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Commerce
  9. AUTOMATED TOTAL PRECIPITATION GAGE

    SBC: Eti Instrument Systems Inc.            Topic: N/A

    THE GAUGE DESCRIBED IN THIS PROPOSAL PROVIDES A MEANS OF AUTOMATING THE PROCESS OF COLLECTING AND MEASURING ATMOSPHERIC HYDROMETERS (PRECIPITATION IN EITHER LIQUID OR ICE PHASE WITH THE ABILITY TO OPERATE IN THE HARSH WINTER ENVIRONMENT WITH SNOWDEPTHS EXCEEDING TWENTY FEET). AUTOMATION OF THIS PROCESS INCLUDES: PLACING THE INITIAL ANTIFREEZE CHARGE IN THE CATCH CHAMBER EMPTYING THE GAUGE WHENEVER ...

    SBIR Phase II 1992 Department of Commerce
  10. A 180 DEGREE FIELD-OF-VIEW FOVEAL AND PERIPHERAL CAMERA

    SBC: Q-DOT, INC.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Commerce
US Flag An Official Website of the United States Government