You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Automated Entity Classification in Video Using Soft Biometrics

    SBC: PROGENY SYSTEMS, LLC            Topic: N08077

    Military and intelligence operations are gathering imagery from a variety of sources including ground-based sensors, aerial platforms, and satellites at rates far exceeding our ability to analyze or even transmit and archive this data. This imagery comprises not only still images but increasingly full-motion video (FMV); high-definition (HD), wide-area imagery (WAMI), and other high-resolution for ...

    SBIR Phase II 2015 Department of DefenseNavy
  2. Distributed Satellite Resource Management for Space Superiority

    SBC: DATA FUSION & NEURAL NETWORKS, LLC            Topic: AF083220

    This effort will provide automated GPS outage and degradation characterization (e.g., environment or man-made) tools based upon GPS satellite to site Signal to Noise Ratio (SNR) data, Communication/Navigation Outage Forecasting System (C/NOFS) scintillation cloud predictions, and Signals Intelligence (SIGINT) Radio Frequency Interference (RFI) event tracks. Then detect and track relationships of t ...

    SBIR Phase II 2010 Department of Defense
  3. Improved Satellite Ground C3

    SBC: Braxton Technologies, LLC            Topic: AF131069

    ABSTRACT:Braxtons primary goal is to integrate and test advanced space asset command, control, and communications (C3) assets so that the current low bandwidth, high cost USAF systems can use high bandwidth, high reliability, low cost, automated commercial communications assets and system resource planning methods.Braxton will leverage 20 years of tracking, telemetry and commanding (TT&C), mission ...

    SBIR Phase II 2015 Department of DefenseAir Force
  4. Small Team Command, Control, Communications and Situational Awareness (C3SA)

    SBC: CEEBUS TECHNOLOGIES, LLC            Topic: SOCOM08001

    In Phase I Ceebus demonstrated the feasibility of an underwater, acoustic, direct-sequence spread-spectrum communication architecture, including actual data transfers and decoded message recovery. All of the communication algorithms were post-processed and communication was performed with a single piezo transducer. Prototype development is the next step in delivering a system that offers real-time ...

    SBIR Phase II 2010 Department of DefenseSpecial Operations Command
  5. Air Launch Testbed for Endoatmospheric Hypersonic Trajectories

    SBC: GENERATION ORBIT LAUNCH SERVICES, INC.            Topic: AF141081

    ABSTRACT:This SBIR proposal covers the preliminary design and initial hardware and software in-the-loop testing of the GOLauncher 1, a single stage liquid air launched rocket system, for utilization in future hypersonic flight testing efforts. Major objectives include completing prelimianry design of the system based on requirements defined during Phase I, further validation of cost and schedule e ...

    SBIR Phase II 2015 Department of DefenseAir Force
  6. Advanced ABIR Correlation and Fusion Algorithms for an Enhanced C2BMC

    SBC: NUMERICA CORPORATION            Topic: MDA07046

    The current U.S. Ballistic Missile Defense System (BMDS) is comprised of a range of components, the integration of which is the responsibility of the Command, Control, Battle Management, and Communications (C2BMC) system. In the current architecture, track data from Overhead Persistent Infrared (OPIR) systems and ground-based radar systems are processed separately. However, ongoing work is devel ...

    SBIR Phase II 2010 Department of DefenseMissile Defense Agency
  7. Universal Mast Controller

    SBC: 3 Phoenix, Inc.            Topic: N091066

    Program Executive Office Submarines (PEO SUB) requires initiatives that help it achieve its Virginia Class platform cost reduction objectives as well as contributing innovative technologies to the Submarine Based Strategic Deterrent (SBSD) development and legacy classes (SSGN). To this end, PEO SUB requires technology initiatives that contribute to the goal of controlling multiple sensors using a ...

    SBIR Phase II 2010 Department of DefenseNavy
  8. High Sea State Automated Deployment and Retrieval of Towed Bodies from a Small Surface Platform

    SBC: PacMar Technologies LLC            Topic: N141058

    This objective of this proposal is to demonstrate an automated towed-body Deployment-Retrieval (D-R) system on ACTUV. A control system monitors ship motions and the relative distance between the water surface and deck at the stern. Data from the sensors are processed and the optimal time to release or capture the payload is determine and executed. The D-R system is intended to prevent damage due t ...

    SBIR Phase II 2015 Department of DefenseNavy
  9. At-Sea Reliability with Predictive Modeling

    SBC: PROGENY SYSTEMS, LLC            Topic: N093214

    The Submarine Reliability Management System (SRMS) is a tool integrated into the TI14/APB13 increment of the AN/BYG-1 submarine combat system. SRMS monitors the host system for faults and degradations using datamining techniques, based on signatures defined in an extensible, Navy-managed set of XML-based Issue Definition File (IDF). This Phase II.5 effort will mature and extend SRMS to improve the ...

    SBIR Phase II 2015 Department of DefenseNavy
  10. Low-Cost Deorbiting System

    SBC: M.M.A. DESIGN LLC            Topic: AF083198

    The proposed Phase II SBIR will design, analyze, produce and test a protoflight unit for a Low Cost De-orbiting System. The proposed de-orbit module is a high reliability, modular, aero-blanket system that de-orbits a 180 kg spacecraft from an 800 km orbit to meet DOD Instruction 3100.12 for a 25 year de-orbit time. The de-orbit system uses common space flight qualified mechanical elements and m ...

    SBIR Phase II 2010 Department of DefenseAir Force
US Flag An Official Website of the United States Government