You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A TEST METHOD FOR RELIAVLY AND EASILY EVALUATING THE CONDITION OF A REACTOR COOLANT PUMP (RCP) SHAFT WHEN THER E IS ONLY LIMITED ACCESS TO THE SHAFT AT THE COUPLING WOULD ENABLE THE NUCLEAR INDUSTRY TO EVALUATE THESE SHAFT SYSTEMS ON SITE.
SBC: Rem Technologies Inc. Topic: N/AA TEST METHOD FOR RELIAVLY AND EASILY EVALUATING THE CONDITION OF A REACTOR COOLANT PUMP (RCP) SHAFT WHEN THER E IS ONLY LIMITED ACCESS TO THE SHAFT AT THE COUPLING WOULD ENABLE THE NUCLEAR INDUSTRY TO EVALUATE THESE SHAFT SYSTEMS ON SITE. THIS PROJECT PROVIDES A TESTING METHOD WHICH CAN BEAPPLIED TO IDENTIFY THE PRESENCE, SIZE, AND LOCATION OF SHAFT CRACKS IN A VERTICAL RCP SHAFT SYSTEM. CONFIRMA ...
SBIR Phase I 1986 Nuclear Regulatory Commission -
CHARACTERIZATION OF CONCRETE CONDITION USING ACOUSTIC TOMOGRAPHIC IMAGING
SBC: Atkinson-noland Assoc. Inc. Topic: N/ARESIDUAL LIFETIME EVALUATION OF EXISTING NUCLEAR FACILITIES REQUIRES DETAILED INFORMATION REGARDING CONDITION OF CONTAINMENT AND SUPPORT STRUCTURES. CURRENT NONDESTRUCTIVE METHODS FOR SUBSURFACE EVALUATION OF REINFORCED CONCRETE USE COMPLEX EQUIPMENT AND RELY HEAVILY ON INTERPRETATION BY THE OPERATOR. A RESEARCH EFFORT IS PROPOSED TO EXAMINE THE USE OF COMPUTERIZED TOMOGRAPHIC IMAGING FOR LOCATING ...
SBIR Phase II 1994 Nuclear Regulatory Commission -
CHARACTERIZATION OF CONCRETE CONDITION USING ACOUSTIC TOMOGRAPHIC IMAGING
SBC: Atkinson-noland Assoc. Inc. Topic: N/AN/A
SBIR Phase I 1993 Nuclear Regulatory Commission -
DEVELOP AN INHALATION SCREENING DOSE MONITOR FOR WORKERS AT NUCLEAR POWER PLANTS
SBC: Mikayola International Topic: N/AAN "INHALATION SCREENING DOSE COLLAR-STANCHION MONITOR" WITHEMBEDDED MINIATURE THIN-WALL GEIGER-MUELLER RADIATION DETECTORS EVALUATES THE THYROID GLAND FOR NANOCURIE ACTIVITYINVENTORY. THE PRIMARY TECHNICAL OBJECTIVE IS TO ESTABLISH THAT THE "COLLAR-STANCHION MONITOR" WILL BE CAPABLE OF DETECTING WITHIN 15 SECONDS AND WITH 2 SIGMA CONFIDENCE AN ACTIVITY INVENTORY OF 0.7 NANOCURIES OF I-131 DOSE EQ ...
SBIR Phase I 1987 Nuclear Regulatory Commission -
IZATION
SBC: Waste Management Group Inc. Topic: N/AAT PRESENT, THE INDUSTRY USES MANY DIFFERENT METHODS TO CHARACTERIZE HARDWARE IN TERMS OF TIS RADIONUCLIDE CONTENT AT THE TIME OF DISPOSAL. ALL OF THES METHODS INVOLVE SOME FORM OF COMPONENT RADIATION PROFILING TO OBTAIN CO-60 ES ESTIMATES COUPLED WITH SCALING OF 10CFR PART 61 LONG LIVED NUCLIDES FOUND IN HARDWARE. UNDERWATER RADIATION PROFILES ARE OBTAINED UNDER DIFFERENT CONDITIONS, WITH DIFFERE ...
SBIR Phase I 1986 Nuclear Regulatory Commission -
QUANTIFICATION OF CONSERVATISMS IN SEISMIC RISK ESTIMATES THROUGH ENGINEERING ADVANCEMENT OF SEISMIC PRA
SBC: Risk Engineering Inc. Topic: N/ASIGNIFICANT CONSERVATISM IN MODERN SEISMIC PRA DERIVES FROM SIMPLIFICATIONS IN GROUND-MOTION CHARACTERIZATION AT THE INTERFACE OF SEISMIC HAZARD AND FRAGILITY METHODOLOGIES. THIS CONSERVATISM ARISES BECAUSE A SINGLE COMPOSITE-MAGNITUDE, BROAD-BAND, GROUND-MOTION SPECTRUM IS USED TO DERIVE FRAGILITY FUNCTIONS, WHEREAS THE MAJORITY OF MOTIONS CONTRIBUTING TO SITE HAZARD HAVE (LESS-DAMAGING) NARROW-B ...
SBIR Phase II 1991 Nuclear Regulatory Commission -
QUANTIFICATION OF CONSERVATISMS IN SEISMIC RISK ESTIMATES THROUGH ENGINEERING ADVANCEMENT OF SEISMIC PRA
SBC: Risk Engineering Inc. Topic: N/AN/A
SBIR Phase I 1989 Nuclear Regulatory Commission -
RISK-BASED ANALYSIS OF TECHNICAL SPECIFICATIONS
SBC: Applied Biomathematics Inc Topic: N/ATHE FRANTIC COMPUTER CODE IS THE MOST ADVANCED MODEL FOR ADDRESSING TIME-DEPENDENT RISK EFFECTS ASSOCIATED WITH TECHNICAL SPECIFICATIONS. IT IS USED BY THE INDUSTRY FOR THE EVALUATION OF UPGRADES AND/OR IMPROVEMENTS IN EXISTING TECHNICAL SPECIFICATIONS AND BY THE NRC STAFF IN RESPONDING TO THE LICENSEE SUBMITTALS. THE EXISTING METHODOLOGY HAS TWO MAJOR DEFICIENCIES: IT DOES NOT PROVIDE THE BOUNDIN ...
SBIR Phase II 1988 Nuclear Regulatory Commission -
RISK-BASED ANALYSIS OF TECHNICAL SPECIFICATIONS
SBC: Applied Biomathematics Inc Topic: N/AN/A
SBIR Phase I 1987 Nuclear Regulatory Commission -
TASK NETWORK MODELING OF HUMAN OPERATIONS IN NUCLEAR POWER PLANT CONTROL ROOMS
SBC: Micro Analysis & Design Inc Topic: N/ATHE PURPOSE OF THIS EFFORT IS TO STUDY THE FEASIBILITY OF AND, HOPEFULLY, VALIDATE THE USE OF TASK NETWORK MODELING TOSTUDY HUMAN FACTORS IN THE CONTROL ROOM. TASK NETWORK MODELING EXTENDS A HUMAN ENGINEERING TASK ANALYSIS INTO A COMPUTER MODEL. WE PROPOSE THAT PERTURBING THE INDIVIDUAL TASKS IN A TASK NETWORK MODEL IN A MANNER PREDICTED FROM CONTROL ROOM DESIGN CHANGES, TASK AUTOMATION, OR THE CO ...
SBIR Phase II 1994 Nuclear Regulatory Commission