You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. P22-083 A21C-T002 Phase II STTR (Smith)

    SBC: FIRST RF CORPORATION            Topic: A21CT002

    Recent advancements in artillery, muzzle velocity, and post-launch propulsion technology have enabled precision guided munitions (PGMs) to travel faster and at longer ranges than ever before. To be most effective in flight and at range, the munitions must incorporate RF sensors to enable advanced, mission-critical functionality. The RF sensors must also be able to survive and operate through extre ...

    STTR Phase II 2023 Department of DefenseArmy
  2. BioSIPs®: Transforming Waste Paper and Biofibers into Building Materials?

    SBC: BIOSIPS, INC.            Topic: A234P014

    Redacted.

    SBIR Phase I 2023 Department of DefenseArmy
  3. The Electric Vehicle Battery Total Life Cycle (EVB-TLC) System for Improved Battery Management

    SBC: R-DEX SYSTEMS, INC.            Topic: A224016

    Redacted.

    SBIR Phase II 2023 Department of DefenseArmy
  4. Advanced Superconducting Cables for Aircraft

    SBC: E-VOLV, INC.            Topic: A224016

    Redacted.

    SBIR Phase II 2023 Department of DefenseArmy
  5. Algae- Based Sustainable Building Materials

    SBC: Flora Materials LLC            Topic: A234P014

    Redacted.

    SBIR Phase I 2023 Department of DefenseArmy
  6. Wearable Sensor for Warfighters

    SBC: TDA RESEARCH, INC.            Topic: A224025

    Redacted.

    SBIR Phase II 2023 Department of DefenseArmy
  7. Portable Hydrogen Generator for Vehicle Fleet Refueling

    SBC: TDA RESEARCH, INC.            Topic: A234012

    Redacted

    SBIR Phase II 2023 Department of DefenseArmy
  8. Soteria- Machine Learning for Breach Routing

    SBC: OUTSIDE ANALYTICS INC            Topic: A214048

    Redacted.

    SBIR Phase II 2023 Department of DefenseArmy
  9. Aware In-Ear Hearable for Real-Time Physiological Monitoring

    SBC: CUSTOM BIOMETRIC WEARABLES INC            Topic: A224025

    Redacted.

    SBIR Phase II 2023 Department of DefenseArmy
  10. Enhanced Identity Object Model (EIOM) for High Value Target Identification

    SBC: RANK ONE COMPUTING CORPORATION            Topic: A234007

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
US Flag An Official Website of the United States Government