You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. AN ADVANCED ROBOTIC MANIPULATOR FOR THE INTEGRAL FAST REACTOR FUEL CYCLE FACILITY

    SBC: Remotec Inc.            Topic: N/A

    DEMONSTRATION TESTING OF ADVANCED PROCESS EQUIPMENT IS EXPECTED TO CONFIRM THE FEASIBILITY OF THE INTEGRAL FAST REACTOR (IFR) FUEL CYCLE PROCESS AT THE HOT FUEL EXAMINATION FACILITY - SOUTH (HFEF-S) ON THE ARGONNE-WEST SITE IN IDAHO. TEST RESULTS WILL BE INCORPORATED INTO THE DESIGN OF A COMMERCIAL IFR FUEL CYCLE FACILITY. THIS PROJECT CONTRIBUTES TO DEVELOPMENT OF A CONCEPTUAL DESIGN FOR AN ADVAN ...

    SBIR Phase II 1990 Department of Energy
  2. AN IN-VESSEL AND EX-VESSEL SMALL VOLUME REMOTE MAINTENANCE SYSTEM FOR THE COMPACT IGNITION TOKAMAK

    SBC: Telerobotics International,            Topic: N/A

    REMOTE MAINTENANCE OF THE COMPACT IGNITION TOKAMAK (CIT) POSES FORMIDABLE CHALLENGES BECAUSE OF ITS INTERNAL DIMENSIONAL CONSTRAINTS, DIVERSITY OF MAINTENANCE OPERATIONS, AND GEOMETRICALLY INTRICATE ARRANGEMENT OF EXTERNAL SERVICE EQUIPMENT. THESE CHALLENGES MUST BE ADDRESSED TO SUPPORT FUTURE "HOT" OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) CIT. PHASE I INTRODUCES A SINGLE SOLUTI ...

    SBIR Phase II 1990 Department of Energy
  3. A NOVEL TELEPHONIC SYSTEM FOR UTILITY REAL-TIME METERING

    SBC: Utilex            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
  4. DETECTION OF ACID RAIN POLLUTANTS USING INFRARED LASERS PRODUCED BY STIMULATED ELECTRON RAMAN SCATTERING

    SBC: Comstock Inc            Topic: N/A

    THIS PROJECT WILL ESTABLISH THE POTENTIAL FOR RAPID RESPONSE, HIGH RESOLUTION DETECTION AND CHARACTERIZATION OF INFRARED (IR) ACTIVE POLLUTANT MOLECULES, SUCH AS S02, N0, AND N02. MINIATURE OPTICAL HEAT PIPES WILL BE CONSTRUCTED AND OPTIMIZED FOR THE GENERATION OF TUNABLE IR LASER LIGHT BY MEANS OF STIMULATED ELECTRON RAMAN SCATTERING (SERS). THE HEAT PIPES WILL USE ALKALI METAL VAPORS AT PRESSURE ...

    SBIR Phase II 1990 Department of Energy
  5. DEVELOPMENT OF A HIGH SENSITIVITY XENON LEAK DETECTOR

    SBC: ADA TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
  6. DEVELOPMENT OF A MULTI-GAS PROCESS FOR HOT-GAS-STREAM CLEANUP

    SBC: ADA TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
  7. DEVELOPMENT OF AN ADVANCED PROCESS FOR SIMULTANEOUS REMOVAL OF SULFUR OXIDES AND NITROGEN OXIDES FROM FLUE GAS BY ELECTROMAGNETIC METHOD

    SBC: CHA CORP.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
  8. DEVELOPMENT OF AN IMPROVED NOZZLE FOR FLUE GAS HUMIDIFICATION

    SBC: ADA TECHNOLOGIES, INC.            Topic: N/A

    FLUE GAS HUMIDIFICATION DOWNSTREAM OF THE AIR PREHEATER PLAYS AN IMPORTANT ROLE IN ALL CALCIUM-BASED DRY SORBENT PROCESSES. FOR IN-DUCT SORBENT INJECTION PROCESSES, HUMIDIFICATION IS REQUIRED TO ACHIEVE THE DESIRED REACTION RATES BETWEEN THE SORBENT PARTICLES AND THE FLUE GAS SO2; FOR FURNACE SORBENT INJECTION, SUPPLEMENTAL SO2 CAPTURE IS POSSIBLE. HUMIDIFICATION ALSO IS THE MOST ECONOMICAL MEANS ...

    SBIR Phase II 1990 Department of Energy
  9. DEVELOPMENT OF AN INNOVATIVE LIQUID HELIUM PUMP

    SBC: Barber-Nichols, LLC            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
  10. DEVELOPMENT OF A ROBUST CAD-TO-GEANT INTERFACE FOR PHYSICS DETECTOR SPECIFICATION

    SBC: QUANTUM RESEARCH SERVICES            Topic: N/A

    THE PURPOSE OF THE PROPOSED PHASE I PROJECT IS TO DEMONSTRATE THAT A USEFUL SOFTWARE INTERFACE CAN BE CONSTRUCTED THAT IS CAPABLE OF FAITHFULLY CONVERTING NORMAL COMPUTER-AIDED DESIGN (CAD) OUTPUT FILES INTO A FORMAT THAT IS DIRECTLY READABLE BY THE GEANT HIGH ENERGY PHYSICS DETECTOR SIMULATION CODE. GEANT, ORIGINALLY DEVELOPED IN THE 1970S, HAS EMERGED AS A STANDARD TOOL FOR DETECTOR SIMULATION; ...

    SBIR Phase I 1990 Department of Energy
US Flag An Official Website of the United States Government