You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
ULTRAFAST OPTICAL SWITCHES FOR ECCM
SBC: Gumbs Associates, Inc. Topic: N/ATHE EMPLOYMENT OF CONTINUOUS AND PULSED LASERS IN TARGET DESIGNATION AND COMBAT SITUATIONS IS INCREASING, CREATING THE NEED FOR CONTINUOUSLY AND REVERSIBLY SWITCHING DEVICES TO PROTECT COMBAT PERSONNEL AND SENSITIVE SENSING EQUIPMENT WITH TUNABLE LASER SYSTEMS NECISSITATING BROAD BAND PROTECTION. THE PROGRAM PROPOSED HEREIN WILL SEEK TO CLEARLY DEMONSTRATE THE FEASIBILITY OF USING A NOVEL TECHNOLO ...
SBIR Phase II 1990 Department of DefenseArmy -
THREE TORQUE SENSOR CONCEPTS
SBC: Madison Research Inc Topic: N/ATO REDUCE THE LOAD ON THE COMBINING TRANSMISSIONS IN TWO ENGINE TURBOSHAFT HELICOPTERS, THE TORQUE MUST BE LEVELED. IT IS PROPOSED TO UNDERTAKE: TO EVALUATE THREE CONCEPTS OF A TORQUE SENSOR FOR TURBOSHAFT ENGINES, INCLUDING THEIR SENITIVITY, LINEARITY, AND ACCURACY; SELECTION OF THE BEST CONCEPT FOR DETAILED DESIGN, INCLUDING A BLOCK DIAGRAM OF ITS ASSOCIATED ELECTRONICS. TWO CONCEPTSMAKE USE OF ...
SBIR Phase I 1990 Department of DefenseArmy -
THE VIDEO GUIDE TO EVALUATING DRUG ABUSE PREVENTION VIDEO PROGRAMS
SBC: Media Group of CT. Topic: N/AN/A
SBIR Phase I 1990 Department of Education -
SOLDIER COMPATIBLE AIR DEFENSE DISPLAY PROJECT
SBC: Photonics Systems, Inc. Topic: N/APROPOSED HEREIN BY PHOTONICS SYSTEMS, INC. OF NORTHWOOD, OHIO I A PROJECT TO DEVELOP DISPLAY SYSTEMS FOR FORWARD AREA AIR DEFENSE COMMAND AND CONTROL APPLICATIONS. PHASE I OF THIS DEVELOPMENT PROJECT WILL DEFINE THE SYSTEM REQUIREMENTS FOR DISPLAYS, DEVELOP DISPLAY SPECIFICATIONS, PERFORM TRADEOFF STUDIES, RECOMMEND SOFTWARE/INTERFACE(S) AND DEVELOP DISPLAY DESIGN PLANS. HUMAN FACTORS (PHYSICAL AN ...
SBIR Phase I 1990 Department of DefenseArmy -
SLUGLESS MULTIPLE HIGH VELOCITY PULSE SHAPED CHARGE JETS
SBC: Cambridge Hydrodyn Inc Topic: N/ATHIS PROPOSAL IS TO APPLY COMPUTATIONAL FLUID DYNAMIC (CFD) SIMULATIONS TO DESIGN SLUGLESS HIGH VELOCITY PULSE SHAPED CHARGE WARHEADS FOR ARMOR PENETRATION. WE HVE DEVELOPED A NEW AND VERY NOVEL CODE ELPIC (EXTENDED LAGRANGIAN PARTICLE IN CELL CODE) WHICH OVERCOMES THE NORMALLY ENCOUNTERED DIFFICULTIES OF BOTH EULERIAN AND LAGRANGIAN CFD CODES FOR THESE PROBLEMS. USING THIS HIGHLY RELIABLE AND EFF ...
SBIR Phase I 1990 Department of DefenseArmy -
ROBOTIC VEHICLE VIDEO IMAGE TRANSMISSION
SBC: Transitions Research Corp. Topic: N/AUNMANNED VEHICLES ARE DESIRABLE IN HOSTILE ENVIRONMENTS. GUIDANCE IS A DIFFICULT PROBLEM, PARTICULARLY IN ROUGH TERRAIN. VISION IS ESSENTIAL. AUTONOMOUS GUIDANCE IS NOT PRESENTLY VIABLE. REMOTE VIDEO GUIDANCE BY AN OPERATOR IS A PRACTICAL SOLUTION. VIDEO DATA RATES IMPLY VERY HIGH CARRIER FREQUENCIES (GIGAHERZ) WHICH IN TURN REQUIRE LINE OF SIGHT TRANSMISSION. MANEUVERING OPTIONS ARE SERIOUSLY HAM ...
SBIR Phase II 1990 Department of DefenseArmy -
RADAR SIGNAL PROCESSOR
SBC: Bl Associates Topic: N/AMANY INSTRUMENTATION RADARS (SUCH AS THE MPS-36 AND FPS-16) USED AT WSMR AND OTHER RADAR INSTALLATIONS WORLDWIDE WERE DESIGNED 20-30 YEARS AGO. THIS PROPOSAL ADDRESSES ENHANCEMENTS TO THESE OLDER RADAR SYSTEMS TO INCORPORATE MODERN SIGNAL PROCESSING TECHNIQUES USING A DIGITAL COMPUTER AND SOFTWARE TO PROVIDE IMPROVED TRACKING, TO PROVIDE COHERENT DATA FOR TMR AND OTHER USES, TO PROVIDE IMPROVED RE ...
SBIR Phase I 1990 Department of DefenseArmy -
OPTICAL INTERFEROMETERS FOR SENSING ELECTROMAGNETIC FIELDS
SBC: Srico Optical Engineering Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseArmy -
NEURAL NETWORK APPLICATIONS IN MILITARY PROCUREMENT LOGISTICS OPERATIONS INTELLIGENCE AND TRAINING
SBC: Ai Ware, Inc. Topic: N/AMANY COMPELLING EIS/ESS APPLICATIONS IN THE MILITARY AND IN INDUSTRY REMAIN INFEASIBLE DUE TO LIMITATIONS IN COMPUTER TECHNOLOGY. MANY INTERESTING PROBLEMS ARE TOO LARGE OR TOO COMPLEX FOR PRACTICAL SOLUTIONS BY TRADITIONAL APPROACHES. THE COMPLEXITY MAY ARISE FROM UNKNOWN, NON-LINEAR, OR TIME-VARYING RELATIONSHIPS BETWEEN VARIABLES. NEURAL NETWORK TECHNOLGY HAS DEMONTRATED SIGNIFICANT CAPABAILITI ...
SBIR Phase I 1990 Department of DefenseArmy -
MULTI-WAVELENGTH NEPHELOMETER DUST MEASUREMENT SYSTEM
SBC: ADVANCED FUEL RESEARCH, INC. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseArmy