Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until June, 2020.

  1. Schedule AssistantTM: A Portable Visual/Audio Prompting System for Enhancing Independence and Self-Determination in Personal Scheduling and Time Management for Individuals with Mental Retardation

    SBC: ABLELINK TECHNOLOGIES INC            Topic: N/A

    Not Available Long-range, non-cooperative identification techniques such as one-dimensional shape echoes require sources that are compact, eyesafe and produce temporally short pulses to provide fast accurate target identification in the field. To meet these requirements, CTI proposes a solid state Raman laser (SSRL) with an innovative architecture that produces 1.5 um output in short 1 ns length ...

    SBIR Phase I 1999 Department of Education
  2. N/A

    SBC: ABLELINK TECHNOLOGIES INC            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of Education
  3. N/A

    SBC: ABLELINK TECHNOLOGIES INC            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of Education
  4. N/A

    SBC: APPLIED RESOURCES CORPORATION            Topic: N/A

    Not Available TACAN proposes a novel low voltage, low cost, high performance 130 GHz continuous bandwidth EO modulator architecture that uses a balanced two section modulator, one for input RF up to 65 GHz, and the other section for 65 -130 GHz, using currently available V connectors and no metal waveguides. We further propose to fabricate two such external laser modulators to integrate into a du ...

    SBIR Phase I 1999 Department of Education
  5. INTERACTIVE VIDEO PREVOCATIONAL PREFERENCE SELECTOR FOR USE BY INDIVIDUALS WITH MENTAL RETARDATION

    SBC: Fran Maher Inc            Topic: N/A

    THE FOLLOWING PROPOSAL COVERS A PROJECT TO CONDUCT RESEARCH WRITE NARRATIVE, INSTRUCTIONAL AND SHOOTING SCRIPTS, AND IDENTIFY FILM SITES FOR DEVELOPMENT OF AN INTERACTIVE VIDEO PREVOCATIONAL SELECTION INSTRUMENT. SELECTION PATHS AND TOUCH SCREEN INPUT WILL ENABLE BOTH INDEPENDENT USE BY INDIVIDUALS WIHT MENTAL RETARDATION (CLASSIFIED "TRAINABLE")AND USE OF THE INSTRUMENT IN CONJUNCTION WITH A COUN ...

    SBIR Phase I 1990 Department of Education
  6. Development of an Ergonomic Computer Workstation Environment

    SBC: The Woodsmith            Topic: N/A

    Not Available A clear need exists in military and commercial applications to improve the remote detection and identification targets. While a variety of ongoing efforts are focusing on signal exploitation and feature extraction of the return radar signal, potential antenna design performance enhancements are beginning to receive more interest. As radar bandwidths are increased to extract even mor ...

    SBIR Phase I 1999 Department of Education
  7. DEVELOPMENT OF A MULTI-SENSORY "SOUND LAB" FOR SPECIAL EDUCATION APPLICATIONS

    SBC: OVAL WINDOW AUDIO            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Education
  8. CompSkills: A Multimedia Software Application that Provides Self-Directed Computer Training and Skill Assessment for Individuals with Mental Retardation

    SBC: ABLELINK TECHNOLOGIES INC            Topic: N/A

    Not Available High power motors and generators can be made very compact when run under cryogenic conditions. For further enhancements in power densities it is highly desirable to use High Temperature Superconductors with a greatly enhanced critical current densigy Jc at 3T at 77K, which would allow the use of liquid nitrogen as a coolant. Under these operating conditions the superconductor YBa2Cu ...

    SBIR Phase I 1999 Department of Education
  9. Advanced Tools for Accessing the Visual Arts

    SBC: APPLIED RESOURCES CORPORATION            Topic: N/A

    Not Available Minimization of power consumption in electronics is a key requirement as spacecraft shrink in size. Semiconductor industry trends are leading power levels, lower, but not quickly enough to meet the needs of advanced missions or the new generation of broad-band communications satellites. Commercial electronics, while trending to lower power levels, do not include mechanisms to mitiga ...

    SBIR Phase I 1999 Department of Education
US Flag An Official Website of the United States Government