You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. RAPID HIGH RATE LEAD-IN-AIR MONITOR FOR USE AT FIRING RANGES

    SBC: ADA TECHNOLOGIES, INC.            Topic: N/A

    The development of a simple, reliable, and easily operated system to detect and measure airborne lead (Pb) to trace levels is the subject of the Phase I effort. Lead is toxic to humans at very low levels and is ingested easily by breathing air in which elemental Pb or compounds of this element are dispersed. In firing ranges there is an opportunity for shooters and range personnel to be exposed to ...

    SBIR Phase II 1994 Department of DefenseNavy
  2. System Dependability Assessment Tool

    SBC: ADVANCED SYSTEMS & TECHNOLOGIES INC            Topic: N/A

    Dependability is an increasingly critical characteristic of the Navy's mission critical computer systems. These systems must be maintained in a state of readiness to support critical mission functions, and must be able to perform these functions correctly despite the presence of faults in system hardware and software components, and in the environments in which the systems operate. Automated tools ...

    SBIR Phase II 1994 Department of DefenseNavy
  3. Integration of Formal Verification with Real Time Design

    SBC: ADVANCED SYSTEMS & TECHNOLOGIES INC            Topic: N/A

    Formal methods based on rigorous mathematical specification and verification techniques have been shown to be a feasible way of identifying design errors early in the development of complex, ultrareliable computer systems. However, the mathematical expertise required to exercise formal verification systems for non-trivial applications has restricted their use to formal methods experts. The purpose ...

    SBIR Phase I 1994 Department of DefenseNavy
  4. CHARACTERIZATION OF CONCRETE CONDITION USING ACOUSTIC TOMOGRAPHIC IMAGING

    SBC: Atkinson-noland Assoc. Inc.            Topic: N/A

    RESIDUAL LIFETIME EVALUATION OF EXISTING NUCLEAR FACILITIES REQUIRES DETAILED INFORMATION REGARDING CONDITION OF CONTAINMENT AND SUPPORT STRUCTURES. CURRENT NONDESTRUCTIVE METHODS FOR SUBSURFACE EVALUATION OF REINFORCED CONCRETE USE COMPLEX EQUIPMENT AND RELY HEAVILY ON INTERPRETATION BY THE OPERATOR. A RESEARCH EFFORT IS PROPOSED TO EXAMINE THE USE OF COMPUTERIZED TOMOGRAPHIC IMAGING FOR LOCATING ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  5. A Pulsed Solid-State Coherent Lidar for Naval Wind Sounding Applications

    SBC: COHERENT TECHNOLOGIES, INC.            Topic: N/A

    A pulsed coherent 2 lim diode-pumped solid-state lidar has excellent capability of meeting Navy requirements for remotely measuring atmospheric wind fields. The proposed 2 #m diode-pumped coherent lidar will be capable of pulse energies of -20 mJ/pulse and a PRF of >100 Hz, with a pulse duration of 200 us. Coherent Technologies, Inc. has developed the first 1.06 and 2.09 ,im flashlamp-pumped Coher ...

    SBIR Phase II 1994 Department of DefenseNavy
  6. Coherent Lidar Probe for Volumetric Airwake Measurements

    SBC: COHERENT TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseNavy
  7. Diffusional Coating Of A-625 Alloy By Reactive Plasma Surfacing For Arresting Crevice Corrosion

    SBC: ELTRON RESEARCH & DEVELOPMENT, INCORPORATED            Topic: N/A

    This investigation addresses an exploratory development effort whioh applies an innovative adaptation of plasma arc surfacing technology to facilitate the convenient introduotion of a diffusional coating layer out of the surface of A-625 alloy flanged pipe conneCtions such a strategy will be expected to arrest crevice corrosion and related phenomenon The approach will be to modify plasma arc surfa ...

    SBIR Phase II 1994 Department of DefenseNavy
  8. Multilevel Adaptive methods for Application to Steady & Time Dependent 3D Reynolds-Average Navier-Stokes Solver

    SBC: Front Range Sci Computatio            Topic: N/A

    Development of the capability to predict flow fields around naval ships,submarines in particular, both accurately and efficiently is crucial to the Navy in the design of naval ships. State-of-the-art Reynolds-averaged Navier-Stokes solvers are capable of predicting the general flow field a=out an appended submarine , but there are two major shortcomings: the long computing time required and the la ...

    SBIR Phase II 1994 Department of DefenseNavy
  9. Expanding Applications for Unmanned Aerial Vehicles

    SBC: GUIDED SYSTEMS TECHNOLOGIES, INC.            Topic: N/A

    It is proposed that the wide range of nonmilitary applications for DoD UAVs be identified and assimilated into a representative set of mission profiles and vehicle specifications, to identify the DoD UAVs that could be used to conduct such missions and to meet such specifications, and to identify opportunities to significantly leverage DoD development and acquisition resources by eliminating ident ...

    SBIR Phase I 1994 Department of DefenseNavy
  10. TASK NETWORK MODELING OF HUMAN OPERATIONS IN NUCLEAR POWER PLANT CONTROL ROOMS

    SBC: Micro Analysis & Design Inc            Topic: N/A

    THE PURPOSE OF THIS EFFORT IS TO STUDY THE FEASIBILITY OF AND, HOPEFULLY, VALIDATE THE USE OF TASK NETWORK MODELING TOSTUDY HUMAN FACTORS IN THE CONTROL ROOM. TASK NETWORK MODELING EXTENDS A HUMAN ENGINEERING TASK ANALYSIS INTO A COMPUTER MODEL. WE PROPOSE THAT PERTURBING THE INDIVIDUAL TASKS IN A TASK NETWORK MODEL IN A MANNER PREDICTED FROM CONTROL ROOM DESIGN CHANGES, TASK AUTOMATION, OR THE CO ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government