You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
DEVELOPMENT OF A DYNAMIC OPERATIONAL RISK MODEL TO SUPPORT RISK MANAGEMENT OF NUCLEAR POWER PLANTS
SBC: Accident Prevention Group Topic: N/ACURRENT ACTIVITY WITHIN THE NRC AND THE NUCLEAR INDUSTRY SEEKS TO EXPLOIT THE BENEFITS OF PRA IN RISK-BASED APPROACHES TO RELIEVE REGULATORY BURDEN ON THE ECONOMICALLY THREATENED NUCLEAR POWER PLANTS. THE ACCIDENT PREVENTION GROUP HAS BEEN DEVELOPING THE CONCEPT OF AN INTEGRATED RISK MANAGEMENT PROGRAM (IRMP) TOWARD SUCH GOALS. A KEY ELEMENT OF AN IRMP IS AN "OPERATIONAL RISK MODEL" OF THE NPP THA ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
CHARACTERIZATION OF CONCRETE CONDITION USING ACOUSTIC TOMOGRAPHIC IMAGING
SBC: Atkinson-noland Assoc. Inc. Topic: N/ARESIDUAL LIFETIME EVALUATION OF EXISTING NUCLEAR FACILITIES REQUIRES DETAILED INFORMATION REGARDING CONDITION OF CONTAINMENT AND SUPPORT STRUCTURES. CURRENT NONDESTRUCTIVE METHODS FOR SUBSURFACE EVALUATION OF REINFORCED CONCRETE USE COMPLEX EQUIPMENT AND RELY HEAVILY ON INTERPRETATION BY THE OPERATOR. A RESEARCH EFFORT IS PROPOSED TO EXAMINE THE USE OF COMPUTERIZED TOMOGRAPHIC IMAGING FOR LOCATING ...
SBIR Phase II 1994 Nuclear Regulatory Commission -
DEVELOPMENT OF A METHODOLOGY FOR ANALYZING PRECURSORS TO EARTHQUAKE-INITIATED AND FIRE-INITIATED ACCIDENT SEQUENCES
SBC: Future Resources Associate Inc Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
SMART WATER-REACTIVE GROUTS FOR UNDERGROUND ENTOMBMENT FACILITIES
SBC: Guyer Santin, Inc. Topic: N/ATHIS PROPOSAL IS TO ADDRESS THE FEASIBILITY OF WATER-REACTIVE GROUTS AS A "SMART" MATERIAL CAPABLE OF BEING PLACED DURING CONSTRUCTION BUT NOT ACTIVATED UNTIL A THREAT EVENT OCCURS WHICH DEGRADES THE ORIGINAL WATERTIGHT INTEGRITY. WHEN SUCH DEGRADATION OCCURS, IT WILL EXPOSE THE WATER-REACTIVE GROUT TO GROUNDWATER. THIS WILL TRIGGER THE HARDENING PROCESS WHICH WILL AUTOMATICALLY AFFECT A EAL AT TH ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
CONTROL ROOM INLEAKAGE TEST
SBC: Lagus Applied Technology Inc. Topic: N/AA SIMPLIFIED RECONNAISSANCE-TYPE TEST IS PROPOSED THAT UTILIZES THE TECHNIQUES OF TRACER GAS VENTILATION TESTING TO QUANTIFY THE UNFILTERED AIR INLEAKAGE INTO AN OPERATING NUCLEAR POWER PLANT CONTROL ROOM. THE TEST WILL BE DEVELOPED TO ENCOMPASS THE FIVE BASIC TYPES OF CONTROL ROOM EMERGENCY VENTILATION SYSTEMS. A THOROUGH ERROR ANALYSIS WILL ALSO BE UNDERTAKEN. A DETAILED TESTING PROTOCOL SUITABL ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
TASK NETWORK MODELING OF HUMAN OPERATIONS IN NUCLEAR POWER PLANT CONTROL ROOMS
SBC: Micro Analysis & Design Inc Topic: N/ATHE PURPOSE OF THIS EFFORT IS TO STUDY THE FEASIBILITY OF AND, HOPEFULLY, VALIDATE THE USE OF TASK NETWORK MODELING TOSTUDY HUMAN FACTORS IN THE CONTROL ROOM. TASK NETWORK MODELING EXTENDS A HUMAN ENGINEERING TASK ANALYSIS INTO A COMPUTER MODEL. WE PROPOSE THAT PERTURBING THE INDIVIDUAL TASKS IN A TASK NETWORK MODEL IN A MANNER PREDICTED FROM CONTROL ROOM DESIGN CHANGES, TASK AUTOMATION, OR THE CO ...
SBIR Phase II 1994 Nuclear Regulatory Commission -
SPECIAL MONITOR DETECTOR DEVELOPMENT FOR RESPIRATOR CONTAMINATION
SBC: Shonka Research Associates Topic: N/AIMPLEMENTATION OF AN INTEGRATED DETECTION SYSTEM FOR CONTAMINATION MONITORING OF RESPIRATORS HAS BEEN PROBLEMATIC. BECAUSE OF THE COMPLEX SURFACES, HAND MONITORING USING PORTABLE SURVEY INSTRUMENTATION HAS BEEN THE PREFERRED METHOD. HAND MONITORING IS COSTLY IN TIME AND OFTEN FAILS TO RELIABLY ACHIEVE A GIVEN DETECTION LIMIT BECAUSE OF VARIABLES SUCH AS SURVEY SPEED ANDDISTANCE FROM THE PROBE. THE ...
SBIR Phase II 1994 Nuclear Regulatory Commission -
MEASUREMENT BASED DEPENDABILITY ANALYSIS FOR DIGITAL SYSTEMS
SBC: SOHAR, INC. Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission