You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DEVELOPMENT OF A TOTAL PEROXY DETECTOR FOR FLAME AND COMBUSTION MEASUREMENTS

    SBC: ADA TECHNOLOGIES, INC.            Topic: N/A

    A RESEARCH AND DEVELOPMENT PROGRAM IS PROPOSED WHICH WILL DETERMINE THE TECHNICAL FEASIBILITY OF AN INSTRUMENT DESIGNED TO PROVIDE THE CAPABILITY OF MEASURING THE CONCENTRATION OF OXY AND PEROXY FREE RADICALS IN COMBUSTION STUDIES. THE DETECTOR FOR THE INSTRUMENT IS BASED ON AN AMBIENT FREE RADICAL DETECTOR WHICH USES AN AMPLIFICATION CHAIN REACTION BETWEEN THE FREE RADICALS AND CO AND NO WHICHRES ...

    SBIR Phase II 1987 Department of Energy
  2. ELECTRONIC EQUIPMENT SHELTERS

    SBC: Advanced Composite Technology            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseAir Force
  3. ELECTROTHERMAL REFORMING OF HAZARDOUS ORGANICS AND WATER- SOLUBLE WASTES

    SBC: A1-chem Fuels Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Environmental Protection Agency
  4. INTEGRATED MODELING TOOL FOR PERFORMANCE ENGINEERING OF COMPLEX COMPUTER SYSTEMS

    SBC: ADVANCED SYSTEMS & TECHNOLOGIES INC            Topic: N/A

    DURING THE DEVELOPMENT OF COMPLEX COMPUTER SYSTEMS, PERFORMANCE ENGINEERING TECHNIQUES ARE OFTEN NOT APPLIED OR ARE MISAPPLIED WHICH RESULTS IN SYSTEMS THAT DO NOT MEET THESPECIFIED PERFORMANCE CRITERIA OR MUST UNDERGO COSTLY REDESIGNS. AN INTEGRATED COMPUTER SYSTEM MODELING LANGUAGE OVERCOMES THE DEFICIENCIES OR TRADITIONAL ANALYTIC AND SIMULATION MODELING TOOLS BY EXPLOITING THE STRENGTHS FROM B ...

    SBIR Phase II 1987 National Aeronautics and Space Administration
  5. ARCHITECTURE EVALUATION TEST BED

    SBC: ADVANCED SYSTEMS & TECHNOLOGIES INC            Topic: N/A

    THE ESTIMATION OF THE COMPUTER CAPACITIES REQUIRED TO SUPPORT A MISSION ARE USUALLY THE SUBJECT OF MUCH DISCUSSION. ESTIMATES OF THE WORKLOAD AND OTHER PARAMETERS VARY GREATLY. THE REASON FOR THIS IS THAT MOST APPLICATIONS DO NOT FIT THE TRADITIONAL TIMING AND SIZING EFFORT. NONE OF THE THREE COMPONENTS (WORKLOAD, PERFORMANCE REQUIREMENTS AND ARCHITECTURE) IS USUALLY PRESENT. WE CONTEND THAT THE M ...

    SBIR Phase I 1987 Department of DefenseNavy
  6. INTEGRATED RELIABILITY AND TIMING DESIGN ANALYSIS TOOL

    SBC: ADVANCED SYSTEMS & TECHNOLOGIES INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseNavy
  7. A REAL-TIME 3-D CLOUD SIMULATION SYSTEM DEVELOPMENT

    SBC: Aeromet, Inc.            Topic: N/A

    THIS PROPOSAL DESCRIBES A FEASIBILITY STUDY FOR IMPLEMENTING A REALTIME, THREE-DIMENSIONAL CLOUD MODEL TO SUPPORT REENTRY VEHICLE TEST OPERATIONS. AN EXISTING RESEARCH CLOUD MODEL WOULD BE INTERFACED TO A MESOSCALE ATMOSPHERIC MODEL. THE COMBINED MODELING SYSTEM WOULD BE ADAPTED FOR USE AT THE KWAJALEIN MISSILE RANGE (KMR). FORECASTS OF DETAILED CLOUD FEATURES SUCH AS WATER CONTENT, RADAR REFLECTI ...

    SBIR Phase II 1987 Department of DefenseAir Force
  8. MESOSCALE ENVIRONMENTAL NOWCASTING FOR TACTICAL ARMY OPERATIONS

    SBC: Aeromet, Inc.            Topic: N/A

    A PLAN FOR THE DEVELOPMENT OF A MESOSCALE WEATHER NOWCASTING SYSTEM IS PROPOSED. THAT SYSTEM WOULD BE USED AS A TACTICAL DECISION AID FOR SUPPORT OF TACTICAL ARMY OPERATIONS. THE SYSTEM WOULD BE COMPOSED OF MODULAR SENSOR PACKAGES, A TELEMETRY SYSTEM, A FLEXIBLE SYSTEM OF SENSOR DEPLOYMENT, AND A MICROPROCESSOR BASED TACTICAL COMPUTER SYSTEM FOR THE ANALYSIS AND DISPLAY OF DATA COLLECTED. THE PROP ...

    SBIR Phase I 1987 Department of DefenseArmy
  9. THERMODYNAMIC VENT SYSTEM (TVS) OPTIMIZATION

    SBC: Aerospace Design & Development, Inc.            Topic: N/A

    THE OPERATIONS OF A THERMODYNAMIC VENT SYSTEM (TVS) WILL BE INVESTIGATED WITH THE GOAL OF OPTIMIZING THE PERFORMANCE OF THE CRYOGENIC STORAGE SYSTEM FOR LONG TERM STORAGE. A TEN YEAR STORAGE LIFE IS THE ULTIMATE GOAL TO BE ACHIEVED. THE EFFECTS OF THE VENTED GAS ON IMPROVING THE PERFORMANCE OF A MULTILAYER INSULATION SYSTEM WILL BE OPTIMIZED BY VARIATION OF PARAMETERS. THE OBJECTIVE IS TO MINIMIZE ...

    SBIR Phase I 1987 Department of DefenseAir Force
  10. HIGH-TEMPERATURE TURBINE--ADVANCED DEVELOPMENT

    SBC: Air Turbine Technology Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseNavy
US Flag An Official Website of the United States Government