You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Optoelectronic Packaging for Through-Substrate Communications

    SBC: Abj Integration Technologies,            Topic: N/A

    ABJ Integration Technologies, Inc. proposes to model a vertically optically interconnected stack of silicon integrated circuits to form a three dimensional system. This 3D system will utilize through-substrate optoelectronic communication to which the package and silicon are optically transparent. System optimization for user specifications will include materials and components such as emitters ...

    SBIR Phase I 1997 Department of DefenseArmy
  2. Optimizing Staff Scheduling by Monte Carlo Simulation

    SBC: Acme Express, Inc.            Topic: N/A

    Scheduling is a manual chore consuming valuable senior staff time and resulting in conflict and ineComputerized solutions which optimize scheduling are possible. Such a program, Doctors On Call Schedoptimizes medium-scale scheduling has been developed and has proved successful in more than two hundThe innovative slotting methodology and the combination of an accounting framework with Monte-Carloin ...

    SBIR Phase II 1997 Department of Health and Human Services
  3. Continuous Analyzer for Monitoring HC1/C12 During Site Cleanup Activity

    SBC: ADA TECHNOLOGIES, INC.            Topic: N/A

    40174 November 8, 1996 ADA Technologies, Inc. The Department of Energy (DOE) owns and operates a number of facilities that are contaminated with chlorine containing hazardous materials. The cleanup of these sites is a DOE and national priority, and a variety of technologies are being used to reduce the volumes of the wastes. However, as a result of th ...

    SBIR Phase II 1997 Department of Energy
  4. Energy Saving Intelligent Controls for Commerical/Industrial Refrigeration

    SBC: ADA TECHNOLOGIES, INC.            Topic: N/A

    75 Energy Saving Intelligent Controls for Commercial/Industrial Refrigeration--ADA Technologies, Inc., 304 Inverness Way South, Suite 365, Englewood, CO 80112-5828; (303) 792-5615 Mr. Patrick D. French, Principal Investigator Dr. Daryl L. Roberts, Business Official DOE Grant No. DE-FG03-97ER82309 Amount: $74,967 Approximately 4% of all the power generated in the US goes to refrigeration in ...

    SBIR Phase I 1997 Department of Energy
  5. Plasma-Assisted Catalyst for Diesel Exhaust Treatment

    SBC: ADA TECHNOLOGIES, INC.            Topic: N/A

    56 Plasma-Assisted Catalyst for Diesel Exhaust Treatment--ADA Technologies, Inc., 304 Inverness Way South, Suite 365, Englewood, CO 80112-5828; (303) 792-5615 Ms. Sheila Haythornwaite, Principal Investigator Dr. Daryl L. Roberts, Business Official DOE Grant No. DE-FG03-97ER82311 Amount: $74,991 Diesel engines are an integral and essential component of the transportation industry; they also co ...

    SBIR Phase I 1997 Department of Energy
  6. A Novel Photosorbent for Removal of Mercury

    SBC: ADA TECHNOLOGIES, INC.            Topic: N/A

    6 A Novel Photosorbent for Removal of Mercury from Aqueous Waste Streams--ADA Technologies, Inc., 304 Inverness Way South, Suite 365, Englewood, CO 80112-5828; (303) 792-5615 Ms. Robin M. Stewart, Principal Investigator Dr. Daryl L. Roberts, Business Official DOE Grant No. DE-FG03-97ER82310 Amount: $74,883 The widespread use of mercury in Department of Energy weapon-making facilities has cre ...

    SBIR Phase I 1997 Department of Energy
  7. INNOVATIVE RESOURCE FOR LIFE SCIENCE EDUCATION

    SBC: ADA TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Health and Human Services
  8. SBIR Phase I: Improved Accuracy for Student/Scientist Networks

    SBC: ADA TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase II 1997 National Science Foundation
  9. SBIR Phase I: Innovative Artificial Life Lab for Life Science Instruction

    SBC: ADA TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Science Foundation
  10. Non-Destructive Real-Time In-Situ Analysis of Vacuum Grown and Processed Infrared Material and Sensor Arrays

    SBC: ADAM INSTRUMENT CO., INC.            Topic: N/A

    The objective of the proposed project is to develop innovative new analytical instrumentation and methodology capable of performing fully automated, non-destructive analysis of semiconductor sensor elements and arrays locate on three inch diameter wafers. The instrumentation would be capable of analyzing II-VI compounds and alloys, particularly HgCdTe. The methodology would employ state-of-the-a ...

    SBIR Phase I 1997 Department of DefenseArmy
US Flag An Official Website of the United States Government