List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. TASK NETWORK MODELING OF HUMAN OPERATIONS IN NUCLEAR POWER PLANT CONTROL ROOMS

    SBC: Micro Analysis & Design Inc            Topic: N/A

    N/A

    SBIR Phase I 1991 Nuclear Regulatory Commission
  2. QUANTIFICATION OF CONSERVATISMS IN SEISMIC RISK ESTIMATES THROUGH ENGINEERING ADVANCEMENT OF SEISMIC PRA

    SBC: Risk Engineering Inc.            Topic: N/A

    SIGNIFICANT CONSERVATISM IN MODERN SEISMIC PRA DERIVES FROM SIMPLIFICATIONS IN GROUND-MOTION CHARACTERIZATION AT THE INTERFACE OF SEISMIC HAZARD AND FRAGILITY METHODOLOGIES. THIS CONSERVATISM ARISES BECAUSE A SINGLE COMPOSITE-MAGNITUDE, BROAD-BAND, GROUND-MOTION SPECTRUM IS USED TO DERIVE FRAGILITY FUNCTIONS, WHEREAS THE MAJORITY OF MOTIONS CONTRIBUTING TO SITE HAZARD HAVE (LESS-DAMAGING) NARROW-B ...

    SBIR Phase II 1991 Nuclear Regulatory Commission
  3. HIGH SENSITIVITY LANDFILL MONITOR

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1991 Nuclear Regulatory Commission
  4. High Mobility Silicon Carbide Substrates

    SBC: Advanced Technologies/Laboratories Intl            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  5. CONTACTS FOR DIAMOND SEMICONDUCTOR DEVICES

    SBC: Advanced Technologies/Laboratories Intl            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  6. MOCVD OF HTSC: PROCESS DEVELOPMENT FOR UNIFORM LARGE AREA GROWTH

    SBC: Advanced Technologies/Laboratories Intl            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  7. HIGH TEMPERATURE OXYGEN INDEX APPARATUS

    SBC: Advanced Fuel Research, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  8. CREATION OF AS-BUILT DRAWINGS IN CAD SYSTEMS

    SBC: Antech Inc.            Topic: N/A

    N/A

    SBIR Phase II 1991 Department of DefenseArmy
  9. DESIGN OF A TACTICAL MULTI-MEDIA INFORMATION COMMUNICATION SYSTEM (MMICS)

    SBC: Command Control, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  10. MEASUREMENT OF COMBAT PERFORMANCE

    SBC: Continental Systems Technology            Topic: N/A

    THE ULTIMATE GOAL OF THE PROPOSED PROJECT IS TO DETERMINE IF THERE EXISTS WITHIN THE LITERATURE A SUFFICIENT FOUNDATION FOR THE DEVELOPMENT OF PRELIMINARY COMBAT PERFORMANCE MEASURES FOR ARMY ENLISTED SOLDIERS. DETERMINATION WILL BE BASED ON AN ANALYSIS OF A.) IDENTIFIED INDIVIDUAL PERFORMANCE CHARACTERISTICS ASSOCIATED WITH COMBAT, B.) MEASURES CURRENTLY AVAILABLE TO MEASURE THE IDENTIFIED CHARAC ...

    SBIR Phase I 1991 Department of DefenseArmy

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government