You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Field-Portable Reflective Spectrometer
SBC: Analytical Spectral Devices, Topic: N/AN/A
SBIR Phase I 1994 Department of DefenseArmy -
CHARACTERIZATION OF CONCRETE CONDITION USING ACOUSTIC TOMOGRAPHIC IMAGING
SBC: Atkinson-noland Assoc. Inc. Topic: N/ARESIDUAL LIFETIME EVALUATION OF EXISTING NUCLEAR FACILITIES REQUIRES DETAILED INFORMATION REGARDING CONDITION OF CONTAINMENT AND SUPPORT STRUCTURES. CURRENT NONDESTRUCTIVE METHODS FOR SUBSURFACE EVALUATION OF REINFORCED CONCRETE USE COMPLEX EQUIPMENT AND RELY HEAVILY ON INTERPRETATION BY THE OPERATOR. A RESEARCH EFFORT IS PROPOSED TO EXAMINE THE USE OF COMPUTERIZED TOMOGRAPHIC IMAGING FOR LOCATING ...
SBIR Phase II 1994 Nuclear Regulatory Commission -
Architectures and Components for Two-Dimensional Optical Signal Processing
SBC: Displaytech Incorporated Topic: N/AN/A
SBIR Phase I 1994 Department of DefenseArmy -
Intelligent Nonlinear Control of Remotely Piloted Model Scale Helicopters
SBC: GUIDED SYSTEMS TECHNOLOGIES, INC. Topic: N/AAn intelligent nonlinear control methodology, based on an innovative combination of feedback linearization and artificial neural networks, is to be adapted to control remotely piloted helicopters. A mapping is derived which transforms a nonlinear dynamic model of the plant into a linear, time invariant space. A single point linear controller design is then carried out in this linear space. The der ...
SBIR Phase II 1994 Department of DefenseArmy -
TASK NETWORK MODELING OF HUMAN OPERATIONS IN NUCLEAR POWER PLANT CONTROL ROOMS
SBC: Micro Analysis & Design Inc Topic: N/ATHE PURPOSE OF THIS EFFORT IS TO STUDY THE FEASIBILITY OF AND, HOPEFULLY, VALIDATE THE USE OF TASK NETWORK MODELING TOSTUDY HUMAN FACTORS IN THE CONTROL ROOM. TASK NETWORK MODELING EXTENDS A HUMAN ENGINEERING TASK ANALYSIS INTO A COMPUTER MODEL. WE PROPOSE THAT PERTURBING THE INDIVIDUAL TASKS IN A TASK NETWORK MODEL IN A MANNER PREDICTED FROM CONTROL ROOM DESIGN CHANGES, TASK AUTOMATION, OR THE CO ...
SBIR Phase II 1994 Nuclear Regulatory Commission -
Precise GPS Positioning for Post-Mission Trajectory Estimation
SBC: THE NAVSYS CORPORATION Topic: N/AN/A
SBIR Phase I 1994 Department of DefenseArmy -
Two-Dimensional Microlaser Smart Pixel Arrays for Optical Signal Processing
SBC: Photonics Research, Inc. Topic: N/AWe propose to develop compact, high-speed, highly-functional III-V semiconductor optoelectronic modules optimized for implementation into optical signal processing (OSP) systems under development at government and university laboratories. The modules will be based on vertical-cavity surface-emmitting lasers integrated discretely or monolithically with other optoelectronic or electronic circuitry. ...
SBIR Phase II 1994 Department of DefenseArmy -
SPECIAL MONITOR DETECTOR DEVELOPMENT FOR RESPIRATOR CONTAMINATION
SBC: Shonka Research Associates Topic: N/AIMPLEMENTATION OF AN INTEGRATED DETECTION SYSTEM FOR CONTAMINATION MONITORING OF RESPIRATORS HAS BEEN PROBLEMATIC. BECAUSE OF THE COMPLEX SURFACES, HAND MONITORING USING PORTABLE SURVEY INSTRUMENTATION HAS BEEN THE PREFERRED METHOD. HAND MONITORING IS COSTLY IN TIME AND OFTEN FAILS TO RELIABLY ACHIEVE A GIVEN DETECTION LIMIT BECAUSE OF VARIABLES SUCH AS SURVEY SPEED ANDDISTANCE FROM THE PROBE. THE ...
SBIR Phase II 1994 Nuclear Regulatory Commission -
Micromachined mirror for an optical/IR scanner system
SBC: Silicon Mountain Design, Inc. Topic: N/AN/A
SBIR Phase I 1994 Department of DefenseArmy -
Downsized Color Reporduction System
SBC: Tangent Engineering, Inc. Topic: N/AThe purpose of this solicitation is to provide a baseline solution to Army needs for in-theater color map reproduction to support lower echelon forces. In order to provide a responsive system, an easily transportable system capable of operating in a variety of conditions must be available without an extensive development cycle. Equipment must fit in standard shelters/vehicles used by lower echelon ...
SBIR Phase I 1994 Department of DefenseArmy