List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. DEVELOPMENT OF TUNGSTEN BASED COMPOSITES

    SBC: 3c Systems, Inc.            Topic: N/A

    IT IS PROPOSED TO DEVELOP AND EMPLOY TWO ADVANCED TECHNOLOGICAL TOOLS IN THE CONTINUING R&D PROBLEM TO DEVELOP IMPROVED TUNGSTEN BASED COMPOSITE MATERIALS TO BE USED IN KINETIC ENERGY PENETRATORS: (1) THE HOT ISOSTATIC PRESSING (HIP) PROCESS WILL BE EMPLOYED TO FABRICATE THE MOST PROMISING TUNGSTEN-CERAMIC (CERMET) MATERIAL COMBINATIONS. (2) IN ORDER TO OBTAIN DYNAMIC MATERIAL PROPERTIES AND ULTIM ...

    SBIR Phase I 1991 Department of DefenseArmy
  2. CREATION OF AS-BUILT DRAWINGS IN CAD SYSTEMS

    SBC: Antech Inc.            Topic: N/A

    N/A

    SBIR Phase II 1991 Department of DefenseArmy
  3. INTELLIGENT MAN-MACHINE INTEGRATION FOR ADVANCED ARMY ROTORCRAFT

    SBC: CHI SYSTEMS, INCORPORATED            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  4. INTELLIGENT INTERFACE CONSTRUCTION (IICON) WORKBENCH FOR DECISION AID GENERATION

    SBC: CHI SYSTEMS, INCORPORATED            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  5. DESIGN OF A TACTICAL MULTI-MEDIA INFORMATION COMMUNICATION SYSTEM (MMICS)

    SBC: Command Control, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  6. MEASUREMENT OF COMBAT PERFORMANCE

    SBC: Continental Systems Technology            Topic: N/A

    THE ULTIMATE GOAL OF THE PROPOSED PROJECT IS TO DETERMINE IF THERE EXISTS WITHIN THE LITERATURE A SUFFICIENT FOUNDATION FOR THE DEVELOPMENT OF PRELIMINARY COMBAT PERFORMANCE MEASURES FOR ARMY ENLISTED SOLDIERS. DETERMINATION WILL BE BASED ON AN ANALYSIS OF A.) IDENTIFIED INDIVIDUAL PERFORMANCE CHARACTERISTICS ASSOCIATED WITH COMBAT, B.) MEASURES CURRENTLY AVAILABLE TO MEASURE THE IDENTIFIED CHARAC ...

    SBIR Phase I 1991 Department of DefenseArmy
  7. PHASE DISTRIBUTION MATERIALS

    SBC: Damaskos, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  8. MICROSTRUCTURAL ENGINEERED THIN FILM MATERIAL FOR EM SHIELDING

    SBC: Damaskos, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  9. DIGITAL FILTERING USING SIMULATION MODELS

    SBC: DANIEL H. WAGNER ASSOCIATES, INCORPORATED            Topic: N/A

    A VARIETY OF OBJECTS ARE TRACKED ON ARMY TEST RANGES, INCLUDING: SLOW-MOVING GROUND VEHICLES, HIGH PERFORMANCE AIRCRAFT, MISSILES, CANNON BULLETS, ORBITAL VEHICLES AND AIRBORNE DEBRIS. VIDEO AND RADAR SENSOR SYSTEMS SUPPORT TRACKING. ACCURATE, REAL TIME TRACKING IS CRITICAL IN SUPPORTING RANGE SAFETY CALCULATIONS AND PERFORMANCE EVALUATION. CURRENTLY OBJECTS ARE TRACKED USING POLYNOMIAL FILTERS (E ...

    SBIR Phase I 1991 Department of DefenseArmy
  10. VIDEO BANDWIDTH REQUIREMENTS FOR REMOTED APPLICATIONS

    SBC: Delta Information Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government