You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DEVELOPMENT OF TUNGSTEN BASED COMPOSITES

    SBC: 3c Systems, Inc.            Topic: N/A

    IT IS PROPOSED TO DEVELOP AND EMPLOY TWO ADVANCED TECHNOLOGICAL TOOLS IN THE CONTINUING R&D PROBLEM TO DEVELOP IMPROVED TUNGSTEN BASED COMPOSITE MATERIALS TO BE USED IN KINETIC ENERGY PENETRATORS: (1) THE HOT ISOSTATIC PRESSING (HIP) PROCESS WILL BE EMPLOYED TO FABRICATE THE MOST PROMISING TUNGSTEN-CERAMIC (CERMET) MATERIAL COMBINATIONS. (2) IN ORDER TO OBTAIN DYNAMIC MATERIAL PROPERTIES AND ULTIM ...

    SBIR Phase I 1991 Department of DefenseArmy
  2. CREATION OF AS-BUILT DRAWINGS IN CAD SYSTEMS

    SBC: Antech Inc.            Topic: N/A

    N/A

    SBIR Phase II 1991 Department of DefenseArmy
  3. A TECHNOLOGY CLASSIFICATION AID FOR ARTIFICAL INTELLIGENCE

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: N/A

    ARTIFICIAL INTELLIGENCE RESEARCH HAS PROGRESSED TO THE POINT WHERE IT HAS PRODUCED A WIDE RANGE OF APPLICATIONS, TOOLS AND TECHNIQUES. TO ASSURE THAT THESE SYSTEMS WILL RELIABLY PERFORM WILL REQUIRE THE DEVELOPMENT OF ADVANCED TESTING PROCEDURES. THIS PROPOSAL DETAILS A PLAN FOR ORGANIZING ARTIFICIAL INTELLIGENCE KNOWLEDGE AND BUILDING SOFTWARE TOOLS WHICH USE THIS KNOWLEDGE AS A FIRST STEP TOWARD ...

    SBIR Phase I 1991 Department of DefenseArmy
  4. KNOWLEDGE BASE DEVELOPMENT FOR ROTORCRAFT PILOT-VEHICLE INTERFACE

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: N/A

    A SIGNIFICANT LEVEL OF EFFORT HAS BEEN DEDICATED TO THE DEVELOPMENT OF SOPHISTICATED DECISION AIDS FOR THE ADVANCED COCKPIT OF THE 1990'S AND BEYOND. THE GOAL OF MUCH OF THIS WORK HAS BEEN TO EQUIP THE FUTURE PILOT OF A MULTI-MISSION AIRCRAFT WITH THE LEVEL OF TACTICAL, AVIONICS, AND MISSION SUPPORT NOW ONLY POSSIBLE IN MULTI-MAN COCKPITS. USE OF ADVANCED ARTIFICIAL INTELLIGENCE SYSTEMS, MELDED IN ...

    SBIR Phase I 1991 Department of DefenseArmy
  5. A GENERALIZED VIDEO DATA COMPRESSION MODEL

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  6. INTELLIGENT MAN-MACHINE INTEGRATION FOR ADVANCED ARMY ROTORCRAFT

    SBC: CHI SYSTEMS INC            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  7. INTELLIGENT INTERFACE CONSTRUCTION (IICON) WORKBENCH FOR DECISION AID GENERATION

    SBC: CHI SYSTEMS INC            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  8. DESIGN OF A TACTICAL MULTI-MEDIA INFORMATION COMMUNICATION SYSTEM (MMICS)

    SBC: Command Control, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  9. MEASUREMENT OF COMBAT PERFORMANCE

    SBC: Continental Systems Technology            Topic: N/A

    THE ULTIMATE GOAL OF THE PROPOSED PROJECT IS TO DETERMINE IF THERE EXISTS WITHIN THE LITERATURE A SUFFICIENT FOUNDATION FOR THE DEVELOPMENT OF PRELIMINARY COMBAT PERFORMANCE MEASURES FOR ARMY ENLISTED SOLDIERS. DETERMINATION WILL BE BASED ON AN ANALYSIS OF A.) IDENTIFIED INDIVIDUAL PERFORMANCE CHARACTERISTICS ASSOCIATED WITH COMBAT, B.) MEASURES CURRENTLY AVAILABLE TO MEASURE THE IDENTIFIED CHARAC ...

    SBIR Phase I 1991 Department of DefenseArmy
  10. PHASE DISTRIBUTION MATERIALS

    SBC: Damaskos, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
US Flag An Official Website of the United States Government