You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Emulsified Bilgewater Treatment

    SBC: ADA TECHNOLOGIES, INC.            Topic: N03206

    The goal of this multiphase SBIR project is to develop and commercialize a compact and robust system for removing oil from bilgewater using electrocoagulation (EC). Under Phase I, ADA Technologies tested the ability of EC to treat oily, emulsified bilgewater. Lab-scale tests verified that the EC process consistently breaks oily emulsions, producing a floc that can be separated from the water phase ...

    SBIR Phase II 2005 Department of DefenseNavy
  2. Scalable Wireless Geo-Telemetry Capability for Miniature Smart Sensors

    SBC: ADA TECHNOLOGIES, INC.            Topic: A04153

    Lack of accurate geo-positioning (GPS) information integrated within the miniature footprint of a wireless sensor handicaps rapid ad-hoc deployments. Self-mapping data analysis tools, as a result, do not dynamically display measurements real-time. In a battlefield or situation requiring rapid deployment and situational awareness, this is unacceptable. ADA Technologies proposes to address this nee ...

    SBIR Phase I 2005 Department of DefenseArmy
  3. System for Tactical Display of Miniature Smart Sensors

    SBC: ADA TECHNOLOGIES, INC.            Topic: A04153

    Lack of accurate geo-positioning (GPS) information integrated within the miniature footprint of a wireless sensor handicaps rapid ad-hoc deployments. Self-mapping data analysis tools can not dynamically display measurements real-time. In a battlefield or situation requiring rapid deployment and situational awareness, this is unacceptable. ADA Technologies proposes to address this need by developi ...

    SBIR Phase II 2005 Department of DefenseArmy
  4. Sensor for the Automation of Electrolyte Chlorination

    SBC: ADA TECHNOLOGIES, INC.            Topic: OSD04C08

    Increased littoral deployment of submarines and other naval vessels has seen an increase in biological fouling and clogging of vessel cooling systems resulting in costly cleaning procedures and curtailed operations pending completion of cleaning procedures. To address and reduce the increased threat of biofouling, the Navy has begun installing electrolytic chlorination systems in submarines and s ...

    SBIR Phase I 2005 Department of DefenseNavy
  5. Development and flight test demonstration of an innovative practical Autonomous Formation Flying System (AFFS) for manned rotorcraft.

    SBC: Aerotonomy, Incorporated            Topic: A05T011

    Aerotonomy, Incorporated and our Research Institution partner the Georgia Institute of Technology (GIT) will combine an innovative adaptive guidance system, the latest knowledge in autonomous adaptive rotorcraft control, and intuitive pilot interface techniques to arrive at a safe, practical, Autonomous Formation Flying System (AFFS) for manned rotorcraft. This Phase I project will culminate in a ...

    STTR Phase I 2005 Department of DefenseArmy
  6. Littoral Geoacoustic Surveys Using an Adaptive Network of Gliders

    SBC: Alaska Native Technologies, LLC            Topic: N04141

    Acoustic sensor systems are the backbone of both anti-submarine (ASW) and mine-countermeasure (MCM) systems. Inadequate knowledge of the acoustic environment, especially in denied areas, results from a lack of survey equipment, funding, and access to areas of tactical interest. Moreover, the acoustic environment can change substantially depending on conditions such as sound speed, water depth, an ...

    SBIR Phase I 2005 Department of DefenseNavy
  7. Enhancing Tactical Decision-Making in Navy Seal Operations

    SBC: Veloxiti, Inc.            Topic: N05069

    Our solution to creating a quick response, collaborative capability among Navy SEAL teams is centered upon a system that will provide the SEALs with direct collaboration support, automated collaboration support, intelligence surveillance reconnaissance (ISR), capture and access support, facilitation of distributed command and control (C2), and automated reporting. In an effort to maximize effecti ...

    SBIR Phase I 2005 Department of DefenseNavy
  8. Hybrid Propulsion Systems for Undersea Weapons

    SBC: Barber-Nichols, LLC            Topic: N05T024

    Leveraging existing Simulation Based Design and Multidisciplinary Optimization (SBD / MDO) analyses, optimal hybrid torpedo configuration(s) will be developed. Engineering analyses will be performed on a new chemical oxygen storage and delivery concept and turbomachinery for the hybrid propulsion system. Analysis performed will result in component performance metrics that will be used in system ...

    STTR Phase I 2005 Department of DefenseNavy
  9. Uncooled Midwave Focal Plane Array (FPA) and Camera for RPG Detection

    SBC: BFE Acquisition Sub II, LLC            Topic: A04117

    Uncooled Focal Plane Array (UFPA) technology has evolved such that high performance can be achieved in both the medium wavelength infrared (MWIR 3-5 micron) and long wavelength infrared (LWIR 8-14 micron) bands. The main reason for this performance improvement has been increased thermal isolation of the bolometric sensing element. High performance can be achieved in both the MWIR and LWIR with a s ...

    SBIR Phase I 2005 Department of DefenseArmy
  10. A Liquid-Crystal on Silicon Infrared Scene Projector

    SBC: BOULDER NONLINEAR SYSTEMS, INC.            Topic: A03064

    This proposal outlines a strategy for transitioning Liquid Crystal on Silicon (LCOS) displays into the MWIR and LWIR. Existing LCOS displays are limited to visible operation. IR capability will be achieved through the use of high-speed liquid crystal materials and the development of a large pixel, high voltage silicon backplane. The result will be a high-resolution, high speed display capable o ...

    SBIR Phase II 2005 Department of DefenseArmy
US Flag An Official Website of the United States Government