You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Wire-Arc Additive Manufacturing and Wire-Arc ThermalSpray Methods to Clad Nuclear-Reactor Materials
SBC: NANOCOATINGS INC Topic: C5512aThe Department of Energy (DOE) requires the demonstration of bimetallic corrosion-resistant surfaces for structural and cooling components used in molten-salt nuclear-reactor systems. Proposed coating materials must survive thermo-mechanical loading (e.g., no flaking or spalling) during exposure to the high-temperature conditions encountered during reactor operation and maintain metallurgical stab ...
SBIR Phase I 2023 Department of Energy -
Wire-Arc Additive Manufacturing and Wire-Arc ThermalSpray Methods to Clad Nuclear-Reactor Materials
SBC: NANOCOATINGS INC Topic: C5512aThe Department of Energy (DOE) requires the demonstration of bimetallic corrosion-resistant surfaces for structural and cooling components used in molten-salt nuclear-reactor systems. Proposed coating materials must survive thermo-mechanical loading (e.g., no flaking or spalling) during exposure to the high-temperature conditions encountered during reactor operation and maintain metallurgical stab ...
SBIR Phase I 2023 Department of Energy -
Robust cost-effective characterization of petrophysical properties in sedimentary geothermal applications leveraged by drilling data and cuttings
SBC: GREENPATH SYSTEMS LLC Topic: C5513aPetrophysical properties such as porosity and permeability are arguably the most important parameters in enhancing geothermal heat production through better completion design and stimulation plan. Collecting well logs are often passive and associated with additional costs. In addition, many logging packages cannot sustain high-temperature formations often observed in geothermal conditions. In thes ...
SBIR Phase I 2023 Department of Energy -
Fast and precise electrostatic beam position control for an atomic-resolution STEM
SBC: Nion Co Topic: C5510bC55-10b-270389Recent developments in electron microscopes, especially improved optics and new detectors have led to new types of experiments in the fields of physics, quantum information, and biology. With all the recent progress, one key system of the microscope, the scanning system, has fallen behind. The proposed development will introduce a fundamentally new type of scanning system that replac ...
SBIR Phase I 2023 Department of Energy -
Extended SWIR Single Photon Avalanche Photo Detector Technology for Bioimaging
SBC: AMETHYST RESEARCH INC Topic: C5519bThere are two principal technical limitations and challenges associated with bioimaging. First, depth imaging is limited by light scattering and diffraction in biological tissue. Second, classical high flux multiphoton optical imaging causes photo-damage to cellular viability and perturbations to molecular biological processes. This renders the sample unusable for repeated in situ imaging and proh ...
SBIR Phase I 2023 Department of Energy -
A low-cost holographic sensor for urban aerosol characterization
SBC: CLOUDSCI LLC Topic: C5516aCoarse mode aerosol are an understudied but potentially important component of urban aerosols that affect climate and human health. They are highly relevant to DOE’s interest in improving understanding and resiliency related to climate change impacts on urban areas. Coarse mode aerosol can vary spatially and temporally over urban landscapes due to the large range of coarse mode aerosol emission ...
SBIR Phase I 2023 Department of Energy -
2a. Efficient Monte Carlo Simulations in the Cloud
SBC: RADIASOFT LLC Topic: C5302aC53-02a-271164Research and development advances in novel nuclear reactor design for power production depend on computer simulations to validate efficiency and safety. Most existing simulation co des require training and expertise and have restrictive licenses that make them hard to acquire and use. One promising open-source code is easy to use and can spread its calculations across many computers, ...
SBIR Phase II 2023 Department of Energy -
Wavelength Tunable Visible Picosecond Laser
SBC: Aqwest, LLC Topic: C5312aC53-12a-271184Photocathodes are critical for generation of high-brightness electron beams in accelerators that are used in science, industry, and medical disciplines. A visible wavelength-tunable picoseconds laser is required to support optimization of photocathodes leading to more compact, high-performance, and cost-effective systems. Such lasers are not available commercially. With new sources o ...
SBIR Phase II 2023 Department of Energy -
Ultra-High Energy Resolution Electron Monochromator for Atomic Resolution Studies
SBC: Nion Co Topic: C5313aC53-13a-271299A recent development in electron microscopes improved energy resolution ten times, enabling a new field of science: the study of atomic vibrations at the nanometer scale, down to single atoms. The proposed development will improve the energy resolution 3x further, extending the field to new areas including quantum information technology. A new type of electron monochromator, used tog ...
SBIR Phase II 2023 Department of Energy -
CarbonWatch: Rock Physics-Based Machine Learning Solution for End-to-End Monitoring of CO2 Storage Site
SBC: Teverra LLC Topic: C5321dC53-21d-271370CCS is a key technology for the mitigation of greenhouse gas emissions. Finding suitable geological storage sites, demonstrating effective CO2 containment, and establishing long-term monitoring of storage reservoirs are paramount to effective and safe storage of CO2. The risk of CO2 leakage can be reduced through real- time monitoring and early prediction of possible leaks. Early pre ...
SBIR Phase II 2023 Department of Energy