You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. THE DEVELOPMENT OF AN AMMONIA DETECTOR FOR PROCESS CONTROL OF ADVANCED NITROGEN OXIDE REMOVAL TECHNOLOGIES FOR COAL-FIRED GAS STREAMS

    SBC: ADA TECHNOLOGIES, INC.            Topic: N/A

    NITROGEN OXIDE POLLUTION (NO(X)) EMITTED FROM COMBUSTORS FIRING FOSSIL FUELS (GAS, OIL, OR COAL) IS A MAJOR CONTRIBUTOR TO THE ACID RAIN PROBLEM. THE MOST EFFECTIVE TECHNOLOGIES FOR REDUCING NO(X) INVOLVE THE INJECTION OF AMMONIA (NH(3)) INTO THE FLUE GAS TO REACT WITH NO(X), RESULTING IN THE FORMATION OF INERT MOLECULAR NITROGEN (N(2)) AND WATER. THESE PROCESSES INCLUDE THE USE OF BOTH CATALYSTS ...

    SBIR Phase II 1989 Department of Energy
  2. DEVELOPMENT OF AN IMPROVED NOZZLE FOR FLUE GAS HUMIDIFICATION

    SBC: ADA TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of Energy
  3. AUTOMATED ACQUISITION AND DISSEMINATION OF DISTRIBUTED SYSTEM SOFTWARE DESIGN AND KNOWLEDGE

    SBC: ADVANCED SYSTEMS & TECHNOLOGIES INC            Topic: N/A

    A NEW GENERATION OF COMPUTERS WILL BE REQUIRED TO SUPPORT THE AIR FORCE IN THE 1990'S AND BEYOND. APPLICATIONS SUCH AS INTEGRATED BATTLE MANAGEMENT, REMOTE SENSING, IMAGE PROCESSING, INTELLIGENT ROBOTICS, AND SPACE VEHICLE CONTROL WILL REQUIRE RELIABLE COMPUTING POWER WHICH EXCEEDS THAT PROJECTED FOR MONOLITHIC COMPUTING ARCHITECTURES. THE COMPUTING DEMANDS OF ADVANCE APPLICATIONS WILL REQUIRE THE ...

    SBIR Phase I 1989 Department of DefenseAir Force
  4. A LOCAL AREA NETWORK RECONFIGURATION ANALYSIS TOOL

    SBC: ADVANCED SYSTEMS & TECHNOLOGIES INC            Topic: N/A

    TWO LOCAL AREA NETWORK (LAN) STANDARDS, IEEE 802.5 AND ANSI X3T9.5 FFDDI, HAVE SEEN INCREASED USE AMONG BOTH MILITARY AND INDUSTRIAL USERS ESPECIALLY FOR APPLICATIONS WHICH HAVE TIME-CRITICAL PERFORMANCE REQUIREMENTS. THESE STANDARDS ARE THE BASIS OF PROPOSED NAVY STANDARDS, DESIGNATED SAFENET-I AND SAFENET-II. IN THE EVENT OF A FAILURE, A KEY PERFORMANCE PARAMETER ESSENTIAL TO DESIGNERS OF TIME-C ...

    SBIR Phase I 1989 Department of DefenseNavy
  5. EXPERT ASSISTANT FOR INTEGRATED TIMING AND RELIABILITY DESIGN ANALYSIS

    SBC: ADVANCED SYSTEMS & TECHNOLOGIES INC            Topic: N/A

    N/A

    SBIR Phase I 1989 National Aeronautics and Space Administration
  6. MARICULTURE TECHNOLOGY FOR ECONOMIC DEVELOPMENT, PROMOTING SELF-SUFFICIENCY FOR RURAL ALASKA NATIVES

    SBC: Akhiok Tribal Enterprises            Topic: N/A

    PROBLEM: ONE OF THE MAJOR BARRIERS TO THE DEVELOPMENT OF PINK SCALLOP AQUACULTURE IS THE SHIPMENT OF THE LIVE ANIMALSTO MARKETS ON THE WEST COAST. PINK SCALLOPS ARE VERY FRAGILE. TRANSPORTING THEM TO KODIAK AND REMOTE SITE FOR SHIPMENT TO SEATTLE AND STILL MAINTAIN ENOUGH SHELF LIFE FOR WHOLESALERS AND RETAILERS TO SELL THE PRODUCT IS DIFFICULT. QUESTION: CAN THE SHELF LIFE BE EXTENDED WITH PROCED ...

    SBIR Phase I 1989 Department of Agriculture
  7. AUTOMATIC PIPE WELDING: REAL-TIME CONTROL OF WELD SIZE, SHAPE, AND PENETRATION USING THE ELECTRODYNAMIC ARC AND PUD-DLE CONTROL SYSTEM

    SBC: Applied Fusion Technologies            Topic: N/A

    AUTOMATIC PIPE WELDING, FOR BOTH NEW CONSTRUCTION AND REPAIRWELDING, CURRENTLY DEPENDS UPON OPERATOR SKILL AND OTHER CONTROLS TO ASSURE SOUND WELDED JOINTS. ADDITIONAL EXPENSESSUCH AS X-RAY INSPECTION COMBINE TO MAKE THE COSTS OF ANY NECESSARY REWORK OF WELDED PIPES PROHIBITIVE. ELECTRODYNAMIC ARC AND PUDDLE CONTROL (EDAP) IS A THROUGH-THE-ARC METHOD OF SENSING BOTH WELD PUDDLE SIZE AND PENETRATIO ...

    SBIR Phase II 1989 Department of Energy
  8. MOBILE MISSILE TEL ANALYSIS

    SBC: Applied Research Associates, Inc.            Topic: N/A

    A METHOD TO PREDICT THE PERFORMANCE OF HEAVY WHEELED OR TRACKED GROUND VEHICLES IS PROPOSED. THE STEPS FOR DEVELOPING THESE PREDICTION TECHNIQUES ARE 1) ESTIMATES OF LOADS AND TRACK OR TIRE CONFIGURATION, 2) DEFINITION OF THE SOIL PROPERTIES IN PARTICULAR THE SHEAR STRENGTH, 3) NUMERICAL SIMULATION OF THE VEHICLE-SOIL INTERACTION USING A FINITE DIFFERENCE COMPUTER CODE FROM WHICH THE SOIL DEFORMAT ...

    SBIR Phase II 1989 Department of DefenseAir Force
  9. FEASIBILITY OF INCORPORATING AUDIO SUPPORT INTO ENGLISH COMPOSITION CAI FOR ADULT LEARNERS

    SBC: Applied Research Associates, Inc.            Topic: N/A

    THE PROPOSED RESEARCH FOCUSES ON A STUDY OF THE FEASIBILITY AND EFFECTIVENESS OF AUGMENTING A COMPUTER-BASED INSTRUCT- IONAL PACKAGE IN ENGLISH COMPOSITION FOR ADULT LITERACY STUDENTS WITH AUDIO SUPPORT. THIS AUGMENTATION IS MADE POSSIBLE THROUGH THE USE OF A UNIQUE COMPUTER-INTERFACABLE AUDIOTAPE TECHNOLOGY DEVELOPED BY MEMBERS OF THE PROPOSED PROJECT TEAM UNDER ANOTHER FEDERAL CONTRACT. THIS TEC ...

    SBIR Phase II 1989 Department of Education
  10. HARDENED IMPROVED DYNAMIC RESPONSE DECOY

    SBC: APTEK, Inc.            Topic: N/A

    A FEASIBILITY STUDY OF IMPROVING DECOY PENETRATION AID (PENAID) PERFORMANCE BY SUPPLYING MEANS TO 1) ALLOW FOR DUAL CENTER OF GRAVITY (CG) LOCATION, THEREBY ENABLING INDEPENDENT FULFILLMENT OF IMPULSE BALANCING AND REENTRY STABILITY REQUIREMENTS; AND/OR 2) COUNTERACT DECOY CONING BY SENSING ITS PRESENCE, AND CORRECTING THE ANGULAR MOMENTUM OF THE DECOY TO ELIMINATE CONING.

    SBIR Phase II 1989 Department of DefenseDefense Threat Reduction Agency
US Flag An Official Website of the United States Government