List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. Software Package for Material Model Evaluation

    SBC: APTEK, Inc.            Topic: N/A

    This Phase I and II SBIR will develop a user-friendly, run-time efficient software package dedicated to fitting and evaluating material models used in finite element codes like LS-DYNA. The software package will consist of a pre-processor, a core driver, and a post-processor. The pre-processor will allow the user to specify the material model, model parameters, and desired load history. The dri ...

    SBIR Phase II 2004 Department of Transportation
  2. Portland Cement Concrete Pavement Recycling

    SBC: Road Processing Resources Inc.            Topic: N/A

    RPR's Phase I contract proved the feasibility of concrete recycling based o a shock-producing hammer/anvil concept for fracturing and sizing aggregate and separating reinforcing steel into marketable scrap. The Phase II project will develop a portable self-propelled prototype to remove and process a 12 foot wide roadway at a rate of about a mile a day. This is called "Fast Track" highway removal ...

    SBIR Phase II 2004 Department of Transportation
  3. Microwave NDT of Cracks in Structural Metals

    SBC: Raymond & Lae Engineering,            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government