You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
TASK NETWORK MODELING OF HUMAN OPERATIONS IN NUCLEAR POWER PLANT CONTROL ROOMS
SBC: Micro Analysis & Design Inc Topic: N/AN/A
SBIR Phase I 1991 Nuclear Regulatory Commission -
QUANTIFICATION OF CONSERVATISMS IN SEISMIC RISK ESTIMATES THROUGH ENGINEERING ADVANCEMENT OF SEISMIC PRA
SBC: Risk Engineering Inc. Topic: N/ASIGNIFICANT CONSERVATISM IN MODERN SEISMIC PRA DERIVES FROM SIMPLIFICATIONS IN GROUND-MOTION CHARACTERIZATION AT THE INTERFACE OF SEISMIC HAZARD AND FRAGILITY METHODOLOGIES. THIS CONSERVATISM ARISES BECAUSE A SINGLE COMPOSITE-MAGNITUDE, BROAD-BAND, GROUND-MOTION SPECTRUM IS USED TO DERIVE FRAGILITY FUNCTIONS, WHEREAS THE MAJORITY OF MOTIONS CONTRIBUTING TO SITE HAZARD HAVE (LESS-DAMAGING) NARROW-B ...
SBIR Phase II 1991 Nuclear Regulatory Commission