You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. FEASIBILITY STUDY FOR INTEGRATED ANTENNA-AMPLIFIER NETWORK

    SBC: Green Mountain Radio Research Company            Topic: N/A

    OPERATION OF A JAMMER TRANSMITTER FROM A SMALL PLATFORM (RPV OR JEEP) NECESSITATES THE USE OF ELECTRICALLY SHORT ANTENNAS SUCH AS SHORT WHIPS AND SMALL LOOPS. THE CONVENTIONAL APPROACH USES A POWER AMPLIFIER DESIGNED FOR A 50-OHM LOAD AND AN ANTENNA TUNER THAT MATCHES THE ANTENNA-INPUT IMPEDANCE TO OHMS. HOWEVER, THE RAPID FREQUENCY CHANGES REQUIRED BY JAMMERS PRECLUDE THE USE OF ANTENNA TUNING. T ...

    SBIR Phase II 1991 Department of DefenseArmy
  2. FEASIBILITY STUDY OF HIGH-EFFICIENCY RF-POWER COMBINERS

    SBC: Green Mountain Radio Research Company            Topic: N/A

    MODERN HF/VHF JAMMERS EMPLOY POWER COMBINERS AND MULTIPLE POWER-AMPLIFIER (PA) MODULES TO ACHIEVE A HIGH POWER OUTPUT, CANCELLATION OF HARMONICS, AND GRADUAL DEGRADATION OF PERFORMANCE DUE TO MODULE FAILURE. POWER COMBINERS CAN BE A SIGNIFICANT SOURCE OF POWER LOSS BECAUSE OF RESISTIVE LOSSES, MISMATCH (AMPLITUDE/ PHASE) OF PA OUTPUTS, AND PA INEFFICIENCY DUE TO NONNOMINAL LOAD. CURRENTAND VOLTAGE ...

    SBIR Phase I 1991 Department of DefenseArmy
US Flag An Official Website of the United States Government