You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. MANAGEMENT AND QUALITY CONTROL OF INCONTINENCE CARE IN NURSING HOMES

    SBC: North Rim Systems            Topic: N/A

    A TREATMENT PROGRAM TO SUCCESSFULLY REVERSE URINARY INCONTINENCE IN MANY OF THE NATION'S 1 MILLION INCONTINENT NURSING HOME PATIENTS HAS RECENTLY BEEN VALIDATED IN EXPERIMENTAL STUDIES. STAFF MANAGEMENT AND TRAINING PROCEDURES HAVE ALSO BEEN EVALUATED DOCUMENTING THAT NURSINGHOMES CAN SUCCESSFULLY IMPLEMENT THE TREATMENT PROCEDURES WITH EXISTING STAFF RESOURCES. THE ENTIRE INCONTINENCE ASSESSMENT, ...

    SBIR Phase II 1992 Department of Health and Human Services
  2. FULLY AUTOMATIC CALIBRATION SYSTEM

    SBC: Dowland-bach Corp            Topic: N/A

    IT IS OUR INTENT TO PROVIDE A FULLY AUTOMATED, PORTABLE, SELFCONTAINED NBS TRACABLE CALIBRATION SYSTEM THAT WOULD ALLOW FOR THE VERIFIED CALIBRATION OF PRESSURE TRANSMITTERS, PRESSURE TRANSDUCERS, GAUGES, PRESSURE SWITCHES, AND OTHER PRESSURE INSTRUMENTS FROM VACUUM TO 10,000 PSIG. THIS INCLUDES THE NEW 'INTELLIGENT' PRESSURE TRANSMITTERS. ADDITIONALLY, THIS SYSTEM SHOULD HAVE AN ACCURACY OF +/0.0 ...

    SBIR Phase I 1988 Department of DefenseAir Force
  3. SHELTER- HIGHLY ERECTABLE DOME

    SBC: Gdm Inc            Topic: N/A

    OBJECTIVES OF THIS PROJECT ARE TO DEVELOP RESEARCH AND SCHEMATIC DESIGNS, IF REQUIRED, FOR MOBILE LIGHTWEIGHT EASILY ERECTABLE AIRCRAFT SHELTERS. ACTIVITIES OF PHASE I WILL BE CENTERED ON; (1) PROGRAM DEVELOPMENT, (2) IDENTIFICATION AND CRITIQUE OF NOW AVAILABLE UNITS AS POSSIBLE MOBILE AIRCRAFT SHELTERS; AND (3) DEVELOPMENT OF SCHEMATICS FOR THE PROPOSED MOBILE AIRCRAFT SHELTERS. PROGRAM DEVELOPM ...

    SBIR Phase I 1988 Department of DefenseAir Force
US Flag An Official Website of the United States Government