You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Expansion of American Ginseng Growing Range Into South-Central Alaska
SBC: David C. Smith Topic: N/AN/A
SBIR Phase I 1999 Department of Agriculture -
High Accuracy Modular Thrust Measurement System Utilizing Magnetic Bearings
SBC: IMLACH CONSULTING ENGINEERING Topic: N/AN/A
STTR Phase I 1999 National Aeronautics and Space Administration -
FULLY AUTOMATIC CALIBRATION SYSTEM
SBC: Dowland-bach Corp Topic: N/AIT IS OUR INTENT TO PROVIDE A FULLY AUTOMATED, PORTABLE, SELFCONTAINED NBS TRACABLE CALIBRATION SYSTEM THAT WOULD ALLOW FOR THE VERIFIED CALIBRATION OF PRESSURE TRANSMITTERS, PRESSURE TRANSDUCERS, GAUGES, PRESSURE SWITCHES, AND OTHER PRESSURE INSTRUMENTS FROM VACUUM TO 10,000 PSIG. THIS INCLUDES THE NEW 'INTELLIGENT' PRESSURE TRANSMITTERS. ADDITIONALLY, THIS SYSTEM SHOULD HAVE AN ACCURACY OF +/0.0 ...
SBIR Phase I 1988 Department of DefenseAir Force -
SHELTER- HIGHLY ERECTABLE DOME
SBC: Gdm Inc Topic: N/AOBJECTIVES OF THIS PROJECT ARE TO DEVELOP RESEARCH AND SCHEMATIC DESIGNS, IF REQUIRED, FOR MOBILE LIGHTWEIGHT EASILY ERECTABLE AIRCRAFT SHELTERS. ACTIVITIES OF PHASE I WILL BE CENTERED ON; (1) PROGRAM DEVELOPMENT, (2) IDENTIFICATION AND CRITIQUE OF NOW AVAILABLE UNITS AS POSSIBLE MOBILE AIRCRAFT SHELTERS; AND (3) DEVELOPMENT OF SCHEMATICS FOR THE PROPOSED MOBILE AIRCRAFT SHELTERS. PROGRAM DEVELOPM ...
SBIR Phase I 1988 Department of DefenseAir Force