You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. INVESTIGATION OF FUNCTIONAL PROGRAMMING IN DEFENSE APPLICATIONS

    SBC: Computer Technology Associates            Topic: N/A

    THE DOD SOFTWARE INITIATIVE CLEARLY IDENTIFIED THE CHALLENGES FOR FUTURE SYSTEMS. THEY WILL HAVE TO BE LARGER AND MORE COMPLEX, DEVELOPED AND DELIVERED MORE RAPIDLY, AND MAINTAINED OVER LONGER PERIODS. TRADITIONAL PROGRAMMING TECHNIQUES, HOWEVER, APPEAR TO HAVE REACHED THEIR LIMITS, MAKING MUCH LARGER SOFTWARE SYSTEMS VIRTUALLY IMPOSSIBLE TO BUILD AND MAINTAIN. AN ALTERNATIVE APPROACH, CALLED FUNC ...

    SBIR Phase II 1984 Department of DefenseNavy
  2. THE DESIGN OF A RAPID, INTELLIGENT PROTOTYPING LANQUAGE (RIPL)

    SBC: Computer Technology Associates            Topic: N/A

    DESIGN OF EFFECTIVE MAN-MACHINE INTERFACES (MMI) IS CRITICAL TO THE OPERATIONAL EFECTIVENESS OF INTERACTIVE COMPUTER SYSTEMS. UNFORTUNATELY, MMI DESIGN FLAWS USUALLY ARE NOT UNCOVERED UNTIL LATE IN THE IMPLEMENTATION PHASE WHEN THEIR CORRECTION IS VERY EXPENSIVE OR IMPOSSIBLE. RAPID PROTOTYPING TOOLS HAVE BEEN USE TO ALLEVIATE THESE PROBLEMS BY ALLOWING MMI DESIGNS TO BECOME VISIBLE AND MODIFIABLE ...

    SBIR Phase II 1984 Department of DefenseAir Force
  3. ECHELLE GRATING-RULING

    SBC: Hyperfine Inc.            Topic: N/A

    ECHELLE SPECTROGRAPHS DESIGNED FOR THE VACUUM ULTRAVIOLET HAVE BEEN LIMITED IN THEIR USEFULNESS DUE TO LOW EFFICIENCY AND STRAYLIGHT OF THE ECHELLE GRATING. THIS PROJECT APPLIESNEW APPROACHES IN COATING TECHNOLOGY AS A MEANS TO PROVIDE IMPROVED DEVICES. THE R&D EFFORT INCLUDES THE STUDY OF VACUUM DEPOSITION CONDITIONS AND THEIR RELATIONSHIP TO THE RULEABILITY OF ECHELLE GROOVES. SEVERAL TEST COATI ...

    SBIR Phase II 1984 National Aeronautics and Space Administration
  4. OF TEMPERATURE, HUMIDITY AND REFRACTIVE INDEX

    SBC: Ophir Corporation            Topic: N/A

    IN THIS PHASE I EFFORT WE PROPOSE TO DEMONSTRATE THE TECHNICAL FEASIBILITY OF A PASSIVE REMOTE SENSING INFRARED DEVICE THAT ACCURATELY AND IN REAL-TIME PROFILES ATMOSPHERICTEMPERATURE, HUMIDITY, AND REFRACTIVE INDEX. THIS PROPOSED EFFORT IS A LOGICAL EXTENSION OF A PREVIOUSLY SUBMITTED THEORETICAL AND NUMERICAL ALGORITHM STUDY WITH THE ARMY RESEARCH OFFICE. SINCE THEIR CHARTER IS FOR BASIC THEORET ...

    SBIR Phase II 1984 Department of DefenseAir Force
  5. AN INFRARED ABSORPTION HYGROMETER FOR USE IN PRIMARY COOLANTLOOPS OF GAS-COOLED NUCLEAR REACTORS

    SBC: Ophir Corporation            Topic: N/A

    WE HAVE RECENTLY DEVELOPED AN INFRARED ABSORPTION OPTICAL HYGROMETER FOR USE IN THE EARTH'S ATMOSPHERE. IN THIS PROPOSED PHASE I EFFORT WE WILL NUMERICALLY AND EXPERIMENTALLY SHOW THAT IT IS POSSIBLE TO ADAPT OUR EXISTING TECHNOLOGY TO MONITOR TRACE MOISTURE IN THE HIGH PRESSURE PRIMARY COOLANT LOOPS OF GAS-COOLED NUCLEAR REACTORS. POTENTIAL SENSOR ADVANTAGES INCLUDE FASTER RESPONSE, HIGHER SENSIT ...

    SBIR Phase II 1984 Department of Energy
US Flag An Official Website of the United States Government