You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
DEVELOPMENT OF AN IMPROVED NOZZLE FOR FLUE GAS HUMIDIFICATION
SBC: ADA TECHNOLOGIES, INC. Topic: N/AFLUE GAS HUMIDIFICATION DOWNSTREAM OF THE AIR PREHEATER PLAYS AN IMPORTANT ROLE IN ALL CALCIUM-BASED DRY SORBENT PROCESSES. FOR IN-DUCT SORBENT INJECTION PROCESSES, HUMIDIFICATION IS REQUIRED TO ACHIEVE THE DESIRED REACTION RATES BETWEEN THE SORBENT PARTICLES AND THE FLUE GAS SO2; FOR FURNACE SORBENT INJECTION, SUPPLEMENTAL SO2 CAPTURE IS POSSIBLE. HUMIDIFICATION ALSO IS THE MOST ECONOMICAL MEANS ...
SBIR Phase II 1990 Department of Energy -
INCREASED SPEED IN DNA SEQUENCING BY UTILIZING LARIS TO LOCALIZE MULTIPLE STABLE ISOTOPE LABELED FRAGMENTS
SBC: ATOM SCIENCES, INC. Topic: N/AMAPPING AND SEQUENSING THE DNA IN THE HUMAN GENOME IS OF CRUCIAL IMPORTANCE TO FUTURE MEDICAL ADVANCES AND ECONOMIC COMPETITIVENESS. UTILIZATION OF DNA PROBES LABELED WITH DOZENS OF STABLE ISOTOPES INSTEAD OF A SINGLE RADIOISOTOPE COULD INCREASE THE RATE OF SEQUENCE DETERMINATION 100-FOLD OR MORE COMPARED TO CURRENT METHODS. THIS PROJECT INVOLVES A NEW APPROACH, LASER ATOMIZATION RESONANCE IONIZAT ...
SBIR Phase II 1990 Department of Energy -
NOVEL BASE BORONATED OLIGONUCLEOTIDES FOR BORON NEUTRON CAPTURE THERAPY
SBC: BORON BIOLOGICALS, INC. Topic: N/ABORON NEUTRON CAPTURE THERAPY (BNCT) HAS A CLEAR THEORETICALADVANTAGE OVER OTHER TECHNIQUES AS A METHOD OF DELIVERING CELL KILLING RADIATION TO TUMORS. NEW BORON COMPOUNDS ARE NEEDED THAT CAN SELECTIVELY LOCALIZE IN TUMORS AND, UPON CAPTURE OF THERMAL OR EPITHERMAL NEUTRONS, PRODUCE RADIATIONTO KILL TUMOR CELLS BUT SPARE NORMAL TISSUE AND BLOOD. BNCTEFFECTIVENESS WOULD BE GREATEST IF THE BORON TAR ...
SBIR Phase II 1990 Department of Energy -
THE EFFECT OF POLYMER ADDITIVES AND RESIDUAL ELEMENTS ON THECRYOGENIC PERFORMANCE AND RADIATION RESISTANCE OF INSULATORSFOR HIGH-FIELD MAGNETS
SBC: COMPOSITE TECHNOLOGY DEVELOPMENT, INC. Topic: N/ATHIS PROJECT WILL EVALUATE THE EFFECT OF ACCELERATORS, FLEXIBILIZERS, AND METALLIC AND NONMETALLIC RESIDUAL ELEMENTS ON THE CRYOGENIC FATIGUE LIFE OF INSULATING MATERIALS USED IN SUPERCONDUCTING MAGNETS. THESE ADDITIVES ALTER THE CHEMICAL STRUCTURE OF EPOXY-RESIN SYSTEMS AND THUSWILL AFFECT THE RESPONSE OF THE MATERIAL TO RADIATION AND LOW TEMPERATURES. AN INTEGRATED, INNOVATIVE PROPRIETARY APPROA ...
SBIR Phase II 1990 Department of Energy -
DETECTION OF ACID RAIN POLLUTANTS USING INFRARED LASERS PRODUCED BY STIMULATED ELECTRON RAMAN SCATTERING
SBC: Comstock Inc Topic: N/ATHIS PROJECT WILL ESTABLISH THE POTENTIAL FOR RAPID RESPONSE, HIGH RESOLUTION DETECTION AND CHARACTERIZATION OF INFRARED (IR) ACTIVE POLLUTANT MOLECULES, SUCH AS S02, N0, AND N02. MINIATURE OPTICAL HEAT PIPES WILL BE CONSTRUCTED AND OPTIMIZED FOR THE GENERATION OF TUNABLE IR LASER LIGHT BY MEANS OF STIMULATED ELECTRON RAMAN SCATTERING (SERS). THE HEAT PIPES WILL USE ALKALI METAL VAPORS AT PRESSURE ...
SBIR Phase II 1990 Department of Energy -
ACCURATE, LOW-COST DEVICES FOR WATER QUALITY CONTROL
SBC: Perfect View Inc. Topic: N/APRESENT TECHNIQUES FOR THE ANALYSIS OF INDUSTRIAL AND AGRICULTURAL WATER USE MODIFIED VERSIONS OF LABORATORY PROCEDURES. THEREFORE, THEY REQUIRE SKILLED LABOR, INSTRUMENTATION AND OFTEN MULTI-STEP SAMPLE PREPARATION WORKOUT. IN PRELIMINARY STUDIES, WHICH STEMMED FROM OUR WORK ON GAS ANALYSIS FOR THE DEPARTMENT OF DEFENSE, WE ESTABLISHED THAT AN ACCURATE ANALYSIS OF WATER CAN BE DONE USING A VERY S ...
SBIR Phase II 1990 Department of Agriculture -
AN ADVANCED ROBOTIC MANIPULATOR FOR THE INTEGRAL FAST REACTOR FUEL CYCLE FACILITY
SBC: Remotec Inc. Topic: N/ADEMONSTRATION TESTING OF ADVANCED PROCESS EQUIPMENT IS EXPECTED TO CONFIRM THE FEASIBILITY OF THE INTEGRAL FAST REACTOR (IFR) FUEL CYCLE PROCESS AT THE HOT FUEL EXAMINATION FACILITY - SOUTH (HFEF-S) ON THE ARGONNE-WEST SITE IN IDAHO. TEST RESULTS WILL BE INCORPORATED INTO THE DESIGN OF A COMMERCIAL IFR FUEL CYCLE FACILITY. THIS PROJECT CONTRIBUTES TO DEVELOPMENT OF A CONCEPTUAL DESIGN FOR AN ADVAN ...
SBIR Phase II 1990 Department of Energy -
FIELD INSTRUMENT FOR WIND ERODED SOIL MASS
SBC: Sensit Company Topic: N/AWITHIN THE CRYSTAL UPON THE PARTICLE'S COLLISON. THE SENSORHAS BEEN DESIGNED TO RESPOND TO THE MOMENTUM RANGE OF 2.6 X 10 -12 TO 8.9 X 10 -7 G-M/S. THIS CORRESPONDS TO PARTI-CLES HAVING A DIAMETER RANGE OF 100 TO 1500 MICROMETERS TRAVELING AT VELOCITIES OF 2.0 TO 20 M/S, THE MAIN CONSTITU-ENT OF WIND ERODED SOIL. CALIBRATION OF THE SENSOR OVER THIS MOMENTUM RANGE UTILIZING ASSORTED SIZED PARTICLES ...
SBIR Phase II 1990 Department of Agriculture -
AN IN-VESSEL AND EX-VESSEL SMALL VOLUME REMOTE MAINTENANCE SYSTEM FOR THE COMPACT IGNITION TOKAMAK
SBC: Telerobotics International, Topic: N/AREMOTE MAINTENANCE OF THE COMPACT IGNITION TOKAMAK (CIT) POSES FORMIDABLE CHALLENGES BECAUSE OF ITS INTERNAL DIMENSIONAL CONSTRAINTS, DIVERSITY OF MAINTENANCE OPERATIONS, AND GEOMETRICALLY INTRICATE ARRANGEMENT OF EXTERNAL SERVICE EQUIPMENT. THESE CHALLENGES MUST BE ADDRESSED TO SUPPORT FUTURE "HOT" OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) CIT. PHASE I INTRODUCES A SINGLE SOLUTI ...
SBIR Phase II 1990 Department of Energy