You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A CATALYTIC THERMAL MANAGEMENT SYSTEM FOR HYDROGEN-FUELED INJECTION VEHICLES

    SBC: Accel Catalysis Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 National Aeronautics and Space Administration
  2. ADVANCED TELEROBOTICS CONCEPTS USING NEURAL NETWORKS

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1990 National Aeronautics and Space Administration
  3. INCIPIENT COMBUSTION MONITOR FOR ZERO GRAVITY ENVIRONMENTS

    SBC: ADA TECHNOLOGIES, INC.            Topic: N/A

    THE PROPOSED RESEARCH WILL INVESTIGATE THE FEASIBILITY OF USING A DYNAMIC EXPANSION CONDENSATION NUCLEI CHAMBER FOR THE DETECTION OF SUBMICROMETER PARTICLES EMITTED WHEN COMBUSTIBLE MATERIALS ARE HEATED. SUCH A DEVICE WOULD BE EMPLOYED AS THE SENSOR OF AN INCIPIENT COMBUSTION MONITOR FOR USE ON THE PROPOSED NASA SPACE STATION. COMBUSTIBLE MATERIALS EXPECTED TO BE USED IN THE CONSTRUCTION OF THE SP ...

    SBIR Phase I 1990 National Aeronautics and Space Administration
  4. EXPERT ASSISTANT FOR INTEGRATED TIMING AND RELIABILITY DESIGN ANALYSIS

    SBC: ADVANCED SYSTEMS & TECHNOLOGIES INC            Topic: N/A

    TIMING AND RELIABILITY PERFORMANCE ARE BECOMING INCREASINGLYCRITICAL CHARACTERISTICS OF EMBEDDED COMPUTER SYSTEM SOFTWARE. COMPLEX TRADEOFFS INVOLVING INTERACTIONS BETWEEN TIMING AND RELIABILITY PROPERTIES NEED TO BE MADE DURING DESIGN TO ENSURE THAT SYSTEMS WILL SATISFY STRINGENT PERFORMANCE REQUIREMENTS. THIS SBIR PROJECT WILL INVESTIGATE AN EXPERT SYSTEM BASED AUTOMATED TOOL TO ANALYZECOMPLEX S ...

    SBIR Phase II 1990 National Aeronautics and Space Administration
  5. SUPERCRITICAL CRYOGENIC SELF CONTAINED BREATHING APPARATUS

    SBC: Aerospace Design & Development, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 National Aeronautics and Space Administration
  6. AUTOMATION OF STOWAGE- PHASE I

    SBC: APTEK, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 National Aeronautics and Space Administration
  7. ELIMINATING ENVIRONMENTAL BARRIERS IN EDUCATIONAL FACILITIESTHROUGH UNIVERSAL DESIGN

    SBC: Barrier Free Resources            Topic: N/A

    THE TERM UNIVERSAL DESIGN REFERS TO THE DESIGN OF PRODUCTS AND FACILITIES SO THEY CAN BE USED TO THE GREATEST EXTENT BYALL PEOPLE. (5) TWO HALLMARK CHARACTERISTICS OF UNIVERSAL DESIGN ARE ADAPTABILITY AND SAFETY. IT IS COST EFFECTIVE DESIGNING WHICH IS FUNCTIONAL FOR THE LIFE OF THE STRUCTURE AND FOR THE FACILITY USERS. OUR INTENT IS TO DEVELOP AN EDUCATIONAL PROGRAM FOR THE PURPOSE OF TRAINING AP ...

    SBIR Phase II 1990 Department of Education
  8. GLOVE CONTROLLER WITH FORCE AND TACTILE FEEDBACK FOR DEXTEROUS ROBOTIC HANDS

    SBC: Begej Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 National Aeronautics and Space Administration
  9. PARALLEL MULTILEVEL ADAPTIVE METHODS FOR FLOWS IN TRANSITION

    SBC: Colorado Research Development            Topic: N/A

    N/A

    SBIR Phase I 1990 National Aeronautics and Space Administration
  10. INTELLIGENT HYPERTEXT SYSTEMS FOR AEROSPACE KNOWLEDGE REPRESENTATION

    SBC: Engineering Research & Consult            Topic: N/A

    THE PROPOSED RESEARCH IS DESIGNED TO UTILIZE ARTIFICIAL INTELLIGENCE TECHNOLOGY FOR ASSISTING USERS LOCATING AND UNDERSTANDING TECHNICAL INFORMATION IN MANUALS USED FOR PLANNING AND CONDUCTING WIND TUNNEL TESTS AND INCREASING THEEFFICIENCY OF PERSONNEL TRAINING IN WIND TUNNEL TESTING PROCEDURES. THE OBJECTIVE IS TO CREATE A COMPUTERIZED MANUAL IN THE FORM OF HYPERTEXT AND AN ADVISORY SYSTEM WHICHS ...

    SBIR Phase II 1990 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government