You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
IMPACT OF USING DISPERSED SENSORS FOR NAVIGATION
SBC: Abacus Programming Corp Topic: N/ATHE NAVAL AIR SYSTEMS COMMAND HAS REQUESTED AN INVESTIGATION OF THE SHARING OF THE INERTIAL INSTRUMENTS FROM WITHIN MULTIPLE DISPERSED INERTIAL SYSTEMS. THE SHARING OF REDUNDANT HARDWARE TO PROVIDE FAULT TOLERANCE IS COMMON ON FLIGHT CRITICAL AND LIFE THREATENING AVIONICS APPLICATIONS. THE DIFFERENCE IN THIS INVESTIGATION IS TO EXPLORE THE SHARING OF THE INERTIAL INSTRUMENTS FROM WITHIN MULTIPLE D ...
SBIR Phase I 1990 Department of DefenseNavy -
INERTIAL SYSTEM EXPERT SYSTEM
SBC: Abacus Programming Corp Topic: N/AABACUS PROGRAMMING CORPORATION PROPOSES TO KNOWLEDGE ENGINEER AND DEVELOP A PROTOTYPE OF AN INTERACTIVE EXPERT SYSTEM TO AID IN THE SELECTION OF INERTIAL SYSTEMS FOR NEW AND UPGRADED MISSILE/WEAPON SYSTEMS. THE EXPERT SYSTEM WILL ALLOW A NON-SPECIALIST USER TO ACT AS AN EXPERT IN INERTIAL SYSTEMS TO MATCH MISSION REQUIREMENTS WITH INERTIAL HARDWARE CAPABILITIES AND TO EVALUATE THE MISSION IMPLICAT ...
SBIR Phase I 1990 Department of DefenseNavy -
AUDITORY BRAINSTEM RESPONSE AT HIGH STIMULUS RATES
SBC: ABRATECH CORPORATION Topic: N/ATHE GOAL OF THIS RESEARCH IS TO IMPLEMENT AND TEST AN ALGORITHM THAT WILL PERMIT ACCURATE RECORDING OF THE AUDITORY BRAINSTEM RESPONSE (ABR) AT VERY HIGH-REPETITION RATES BY EXTRACTING THE ABR FROM LATER RESPONSES (E.G., THE MIDDLE LATENCY RESPONSE). PHASE I WILL ACCOMPLISH THE GOAL OF PROGRAMMING THE NECESSARY STIMULUS AND ANALYSIS ALGORITHMS, AND WILL TEST THE METHOD UNDER CONDITIONS OF REAL NOI ...
SBIR Phase II 1990 Department of Health and Human Services -
STUDY OF VERY-HIGH-ALTITUDE AIRCRAFT WITH JOINED WINGS.
SBC: Aca Industries, Inc. Topic: N/AJOINED-WING AIRPLANES EMPLOY TWO SETS OF WINGS RIGIDLY CONNECTED TOGETHER TO FORM A TRIANGULATED SELF-BRACING STRUCTURE. STRUCTURAL ANALYSES AND WIND-TUNNEL TESTS HAVE SHOWN THAT, COMPARED TO CANTILEVER WINGS, JOINED WINGS ARE LIGHTER, STIFFER, AND HAVE HIGHER SPAN-EFFICIENCY FACTORS, GIVING LOWER INDUCED DRAG. THE PROPOSED STUDY INVESTIGATES THE APPLICATION OF JOINED WINGS TO VERY HIGH ALTITUDE S ...
SBIR Phase I 1990 National Aeronautics and Space Administration -
REMOTE AERIAL INSPECTION OF BRIDGES
SBC: Aca Industries, Inc. Topic: N/AOF THE OVER 600,000 HIGHWAY BRIDGES AND APPROXIMATELY 100,000 RAILROAD BRIDGES IN THE U.S., MANY ARE DIFFICULT TO INSPECT BECAUSE OF LIMITED ACCESSIBILITY. REMOTE INSPECTIONBY UNMANNED AERIAL VEHICLES MAY PROVIDE A SOLUTION TO THIS PROBLEM, BUT INVOLVES CONSIDERATIONS OF VEHICLE SUITABILITY (HELICOPTER, BLIMP DUCTED FAN VEHICLE), THE BRIDGE LOCAL ATMOSPHERIC ENVIRONMENT, AND THE TYPE OF CONTROL (R ...
SBIR Phase I 1990 Department of Transportation -
A HEAVY ION FUSION DRIVER FINAL FOCUS SYSTEM
SBC: Accsys Technology, Inc. Topic: N/AINERTIAL CONFINEMENT FUSION USING HEAVY ION DRIVERS IS A PROMISING TECHNIQUE TO OBTAIN COMMERCIAL FUSION ENERGY, PRIMARILY BECAUSE OF ITS HIGH EFFICIENCY, HIGH REPETITION RATES, AND THE GOOD RELIABILITY OF PARTICLE ACCELERATORS. THE VERY INTENSE, SHORT DURATION HEAVY ION BEAM PULSES FROM THE DRIVER MUST BE FOCUSED TO A VERY SMALL SPOT TO IGNITE A FUSION PELLET IN A REACTOR. CONSEQUENTLY, IT IS VER ...
SBIR Phase II 1990 Department of Energy -
BROARD-BAND ULTRASONIC INSPECTION SYSTEM FOR CERAMIC PAR
SBC: Accsys Technology, Inc. Topic: N/AN/A
SBIR Phase II 1990 Department of DefenseNavy -
NEURAL NETWORKS FOR AUTONOMOUS MOTOR CONTROL
SBC: ACCURATE AUTOMATION CORPORATION Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseNavy -
EMERGING TECHNOLOGIES RESULTING IN LIGHTER AIRCRAFT WEIGHT INCREASED ENGINE PERFORMANCE (ISP) AND IMPROVED DESIGN TOOLS
SBC: ACCURATE AUTOMATION CORPORATION Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseAir Force -
ADVANCED TELEROBOTICS CONCEPTS USING NEURAL NETWORKS
SBC: ACCURATE AUTOMATION CORPORATION Topic: N/AN/A
SBIR Phase I 1990 National Aeronautics and Space Administration