You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Miniature Silicon WDM Modulators for Analog Fiber-Optic Links
SBC: Morton Photonics Incorporated Topic: ST081012This STTR Phase II program will create novel devices and system designs, expanding upon the microring resonator based silicon WDM modulator designs and system concepts developed during Phase I. The focus will be on linear transmitters and analog fiberoptic systems, used to transmit and transform analog signals, based on the Linearized - Ring Assisted Mach Zehnder Interferometer (L-RAMZI) modulator ...
STTR Phase II 2015 Department of DefenseDefense Advanced Research Projects Agency -
Ultra-stable, Portable Fabry-Perot Cavities
SBC: Boulder Precision Electro-optics Topic: SB12A001Frequency stabilized lasers are essential subsystems in many applications. Most importantly, they are used as flywheel oscillators in optical atomic clocks, as well as in many sensing and measurement systems, and some examples are down oil well sensing, l
STTR Phase II 2015 Department of DefenseDefense Advanced Research Projects Agency -
Electronic Component Fingerprinting to Determine Manufacturing Origin
SBC: Clearmark Systems, LLC Topic: SB133003ClearMark Systems has developed a sensitive and non-destructive inspection technology for identifying the point of origin of semiconductor chips.We capture the identifying information by analyzing markings on the silicon die or the chip package made by laser marking tools at the fabrication facility.Our Phase I effort has successfully distinguished markings that were made by a target tool versus s ...
SBIR Phase II 2015 Department of DefenseDefense Advanced Research Projects Agency -
Next Generation Hybrid Plasma Simulation Tools (Hy-PlaST)
SBC: Intelligent Automation, Inc. Topic: SB143002In recent decades, the state of the art for simulation of the broad range of plasma phenomena, from low temperature plasmas for lighting and materials processing, to the beams and waves, to high energy density plasmas, has advanced significantly. A key ch
SBIR Phase I 2015 Department of DefenseDefense Advanced Research Projects Agency -
Flexible CPU/GPU Computational Plasma Application with Particles and Fluids
SBC: TECH-X CORPORATION Topic: SB143002The proposed work will lead to the development of a flexible plasma simulation capability that can make use of computational accelerators such as GPUs when present. The eventual computational application will be able to transition from full fluid modelin
SBIR Phase I 2015 Department of DefenseDefense Advanced Research Projects Agency -
Distributed Interference Cacelation (DICE)
SBC: Intelligent Automation, Inc. Topic: SB151005The cancellation of non-cooperative interfering sources is of vital interest to military communications that have experienced, and will continue to experience, disruptions through intentional (electronic warfare) and unintentional interference. In the absence of knowledge about the interfering signals, communication systems treat interference and noise equally, and ignore the fact that these two a ...
SBIR Phase I 2015 Department of DefenseDefense Advanced Research Projects Agency -
Dynamic Pressure Based Prosthetic Socket Fit Diagnostic Tool
SBC: ADA TECHNOLOGIES, INC. Topic: SB151001Due to the difficulties currently involved in fitting prosthetic sockets and the overall subjective nature of the process, DARPA seeks the development of innovative diagnostic tools for quantifying the characteristics of the socket-limb interface during the fitting process. In recent years, prosthetic design has made leaps and bounds implementing robotics to enhance prosthetic performance and ampu ...
SBIR Phase I 2015 Department of DefenseDefense Advanced Research Projects Agency -
Lightweight, Man-Portable, Low-Power Individual Water Purification System
SBC: TDA RESEARCH, INC. Topic: SB151002In todays military, active special operators must be highly mobile and carry all their essential equipment and supplies with them. A major limitation to mobility is the need to carry fresh water. An individual must carry 12 to 24 pounds of water for each day they will be in the field without re-supply. It would be far better to be able to purify locally available water, but no technology exists ...
SBIR Phase I 2015 Department of DefenseDefense Advanced Research Projects Agency -
Warfighter Hydration- Individual Purifier (WHIP) Water Treatment System
SBC: Zeteo Tech, Inc. Topic: SB151002A new and innovative approach to individual water purification is needed that incorporates: a) an RO Membrane technology that allows much higher flow rate for a given size and weight of membrane; b) an improved pumps that allows 10X higher flow rate relative to products on the market today; c) improved pre-filters for found waters with very high suspended solids and d) an improved water polishing ...
SBIR Phase I 2015 Department of DefenseDefense Advanced Research Projects Agency -
Programming New Computers
SBC: Dsplogic Inc Topic: SB151004This project seeks to overcome the barriers to leveraging advanced field programmable gate array (FPGA) devices, and to enable revolutionary new levels of productivity, robustness, and design optimization in FPGA-driven implementation. We focus on the broad domain of digital signal processing (DSP) applications, which encompasses many areas of great importance to the DoD, including Radar, Ladar, a ...
SBIR Phase I 2015 Department of DefenseDefense Advanced Research Projects Agency