You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Reverse Engineering Technical Data Packages for Development of Alternate Sources of Supply for DLA NSNs

    SBC: ORBIS SIBRO INC            Topic: DLA171002

    ORBIS proposes to Address SBIR DLA171-002 by developing efficient and effective processes to reverse engineer RPPOB Candidate Items. ORBIS has a wealth of experience in supporting DoD systems and components and is well suited to addressing the backlog of unsupported equipment .

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  2. SBIR Phase I: Plant Control- A water engineering simulation and web-accessible water treatment plant for engineering, controls, automation, and data visualization STEM education

    SBC: BROWN ENGINEERS, LLC            Topic: EA

    The broader impact/commercial potential of this Small Business Innovation Research (SBIR) Phase I project includes education of water engineering processes and training for success in the advanced technology economy and workforce. Plant Control will teach students the system that supplies safe drinking water to their schools and homes while applying chemistry and engineering concepts in an engagin ...

    SBIR Phase I 2018 National Science Foundation
  3. SBIR Phase I: An Algorithm that Predicts the Readmission Risk of a Hospital Patient

    SBC: HOME CARE BUSINESS SERVICES INC            Topic: SH

    The broader impact/commercial potential of this Small Business Innovation Research (SBIR) Phase I project will be the availability of a patient readiness formula, an algorithm that will improve outcomes by engaging patients in their own healthcare from hospital admission through discharge. The societal impact includes (1) reducing the cost related to readmissions for Congestive Heart Failure, Acut ...

    SBIR Phase I 2018 National Science Foundation
  4. SBIR Phase II: Modular Tensioning Cartridge

    SBC: THE MONTALVO CORPORATION            Topic: MI

    This Small Business Innovation Research (SBIR) Phase II project will address the design, prototype and testing of a modular tension control device for individual tension regulation in the composite manufacturing sector. Composites are increasingly used in mission critical applications where the material and the product must perform reliably, while at the same time improving productivity, increasin ...

    SBIR Phase II 2018 National Science Foundation
  5. New Approaches to Improved PEM Fuel Cell Catalyst Layer

    SBC: TETRAMER TECHNOLOGIES LLC            Topic: 17a

    Polymer-electrolyte membrane (PEM) fuel-cells are one of the most promising energy conversion technologies for renewable clean energy applications- A major challenge preventing the widespread use and commercialization of PEM fuel cells is achieving high performance with low-loadings of platinum group metal (PGM) catalysts- One of the factors driving performance limitations in the cell is the mass ...

    SBIR Phase I 2018 Department of Energy
  6. Increase Competition through Small Business Source Approval Aircraft Launch and Recovery Equipment (ALRE) Critical Safety/Critical Application Items (CSI/CAI)

    SBC: Form Fit and Function LLC            Topic: DLA172001

    This SBIR Phase I proposal to the Defense Logistics Agency (DLA), requests funding for Form Fit and Function, LLC, a small disadvantaged, HUBZone Certified Business, to perform research in the development of an SAR package for NSN 3020-01-560-8493, Pulley, Groove.F3's proven experience in manufacturing and SAR package development, give F3 an advantage in development and decreases Government risk. ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  7. Innovative Ultra Violet and Ozone Resistant Material for Hydraulic Clamp Cushions

    SBC: TETRAMER TECHNOLOGIES LLC            Topic: N181021

    Tetramer Technologies, a specialty materials research company, aims to develop a more robust elastomer material for cushioned clamps used by the Navy. Cushioned clamps serve an important role in securing hydraulic, fuel, and electrical lines in Navy aircraft. The existing cushions have shown sporadic and unreliable breakdown in use, despite being rated to a rigorous MIL standard. Tetramer proposes ...

    SBIR Phase I 2018 Department of DefenseNavy
  8. Development of a Ruggedized, Drop-in Replaceable QSFP+ Fiber Optic Transceiver Module for Harsh Environment Applications

    SBC: NANOMATRONIX LLC            Topic: N181042

    The primary objective of the proposed work is to develop a ruggedized connector for use with commercially available high-speed switches and network interface cards that is low cost, maintains high data rates, operates in harsh environments, and has high mean time between failures to be utilized by Next Generation Architecture (NGA). The topic description continues to define some of the key attribu ...

    SBIR Phase I 2018 Department of DefenseNavy
  9. Rugged, Long-Life Flow Monitoring for Enhanced Geothermal Systems

    SBC: OZARK INTEGRATED CIRCUITS INC            Topic: 12a

    Access to the earth’s subsurface requires technologies that can operate at extremely high temperatures and pressures. Enhanced geothermal systems (EGS) require drilling deep and hot wells; while making better use of each well through techniques such as fracking and zonal isolation. Establishing a well requires monitoring electronics that can produce temperature, pressure and flow profiles in the ...

    SBIR Phase II 2018 Department of Energy
  10. Rational Design of sub-100 nm Polystyrene Particles with a Low Coefficient of Variation in Size

    SBC: TETRAMER TECHNOLOGIES LLC            Topic: NA

    During this Phase II SBIR development program, Tetramer Technologies will develop highlymonodisperse 100-nm and sub-100-nm diameter nanoparticles for use as latex size standards. Highlymonodisperse nanoparticle latexes are needed for improved calibration of electron microscopes, lightscatteringparticle sizing instruments, atomic force microscopes, and particle counters/contamination monitors used ...

    SBIR Phase II 2018 Department of CommerceNational Institute of Standards and Technology
US Flag An Official Website of the United States Government