You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Reverse Engineering Technical Data Packages for Development of Alternate Sources of Supply for DLA NSNs

    SBC: ORBIS SIBRO INC            Topic: DLA171002

    ORBIS proposes to Address SBIR DLA171-002 by developing efficient and effective processes to reverse engineer RPPOB Candidate Items. ORBIS has a wealth of experience in supporting DoD systems and components and is well suited to addressing the backlog of unsupported equipment .

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  2. Increase Competition through Small Business Source Approval Aircraft Launch and Recovery Equipment (ALRE) Critical Safety/Critical Application Items (CSI/CAI)

    SBC: Form Fit and Function LLC            Topic: DLA172001

    This SBIR Phase I proposal to the Defense Logistics Agency (DLA), requests funding for Form Fit and Function, LLC, a small disadvantaged, HUBZone Certified Business, to perform research in the development of an SAR package for NSN 3020-01-560-8493, Pulley, Groove.F3's proven experience in manufacturing and SAR package development, give F3 an advantage in development and decreases Government risk. ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  3. Additive Manufacturing Process Monitoring and Control Technologies

    SBC: FLIGHTWARE INC            Topic: DLA181002

    The In Process Control for L-PBF (IPCL) program leverages and in process inspection method recently developed and successfully demonstrated for NASA. This Layer Topographic Map or LTM method measures the surface if every melt layer using a commercial laser profilometer. LTM software detects, locates and identifies flawed regions within a layer for every layer in the part. It does so for several co ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  4. Increase Competition through Small Business Source Approval Request (SAR) for NSN: 4720-01-440-7526

    SBC: CEPEDA ASSOCIATES, INC.            Topic: DLA181008

    This project will result in the creation of a Technical Data Package (TDP) based on the Air Duct Hose (NSN 4720-01-440-7526).This TDP will form the basis of a Source Approval Request (SAR) that will qualify CEPEDA Associates as an approved vendor for this item providing the Navy with an additional reliable, competitive supplier.CEPEDA is a qualified Navy vendor for critical components including Le ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  5. SCYTHE- Simulate CYber Threats using Hybrid Entities

    SBC: TIER 1 PERFORMANCE SOLUTIONS LLC            Topic: MDA18001

    Recently, there has been at least one significant cyber security event in the world daily. Cyber threats, hackers, and criminals continue to develop advanced capabilities. A key finding of the 2014 DHS CyberSkills Task Force was a clear need for provide more training for cyber security employees. The US Federal Government needs to put a greater emphasis on ensuring its employees have the cyber und ...

    SBIR Phase I 2018 Department of DefenseMissile Defense Agency
  6. Development of Novel RAD-Hard ASICs and a Modular Design Methodology Using Asynchronous Architectures

    SBC: NANOMATRONIX LLC            Topic: MDA18007

    The NMT/UA team propose to develop a radiation-hardened, low power, and highly robust delay-insensitive asynchronous circuit design methodology in 90nm technology, prototyped by designing a SET/SEL/SEU immune asynchronous microcontroller test chip (PIC 16C57, for example).The proposed Phase 1 SBIR effort will focus on design, simulation, prototyping and demonstration of the key functional blocks o ...

    SBIR Phase I 2018 Department of DefenseMissile Defense Agency
  7. System Communications

    SBC: INFOBEYOND TECHNOLOGY LLC            Topic: MDA15003

    Building a reliable, high-bandwidth, and low-latency network is crucial to a distributed mission defense system in which the sensors are operated from thousand-mile distances. This is more significant for satellite linkswhich connect sensors distributed in a large area. In this project, we propose Reducing Data Latency and Increasing Network Bandwidth and Reliability (RDLINBR) for missile defenses ...

    SBIR Phase I 2016 Department of DefenseMissile Defense Agency
  8. Structural Reactive Polymeric Materials

    SBC: TETRAMER TECHNOLOGIES LLC            Topic: MDA15004

    Missiles produced with reactive materials can add chemical energy to the kinetic energy generated on impact with a target. Thus, reactive materials have potential to serve as structural components resulting in possible increase lethality without a weight impact. In Phase I, Tetramer will demonstrate a new material system with significantly stronger mechanical properties and excellent reactive prop ...

    SBIR Phase I 2016 Department of DefenseMissile Defense Agency
  9. SCORESimulated Challenge for Operational Readiness and Engagement

    SBC: TIER 1 PERFORMANCE SOLUTIONS LLC            Topic: MDA15005

    We propose warfighter training systems that are more effective, engaging, and efficient than todays systems. Practicing in a simulated environment has little value without the ability to accurately assess and remediate performance. Unique actions and decisions of each performer must be quantified and related to mission success or failure in a way that appropriately maps the contributing knowledge, ...

    SBIR Phase I 2016 Department of DefenseMissile Defense Agency
  10. SYSTEM AND PROCESS FOR 3D PRINTING PROSTHETIC COMPONENTS

    SBC: REIFY, LLC            Topic: DLA152002

    Orthotics and Prosthetic (O&P) clinics serve as the primary facilities at which 1.9 million U.S. amputees receive care. The design and fabrication of custom prosthetic devices is an integral part of how these O&P facilities provide patient care. Current prosthetic fabrication methods are costly and labor intensive, relying heavily on traditional manual manufacturing techniques. 3D-scanning and pri ...

    SBIR Phase I 2016 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government