You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
CAD STATION RM ON-LINE SUPPORT SYSTEM
SBC: Aquidneck Management Associate Topic: N/ATHIS PROJECT OUTLINES A RELIABILITY AND MAINTAINABILITY KNOWLEDGE BASE AND THE HYPERTEXT INTERFACE REQUIRED TO TRANSPORT THIS DATA INTO COMPUTER-AIDED DESIGN (CAD) ENVIRONMENTS. THE PRIMARY FOCUS OF THE PROPOSAL IS THE DEVELOPMENT OF THE FOUNDATION FOR AN ENGINEERING RELIABILITY AND MAINTAINABILITY INFORMATION PRESENTATION SYSTEM TO SUPPORT ELECTRONIC CIRCUIT AND SYSTEMS DESIGN ENGINEERS IN A CAD ...
SBIR Phase I 1991 Department of DefenseAir Force -
SIMULTANEOUS ENGINEERING AUTOMATION
SBC: Aquidneck Management Associate Topic: N/AA NEW GENERATION OF ENGINEERING AND MANUFACTURING AUTOMATION DESIGNTOOLS ARE NOW EMERGING AS A RESULT OF THE PIONEERING WORK THAT HAS BEEN DONE IN OBJECTORIENTED PROGRAMMING TECHNOLOGY. UNLIKE CONVENTIONAL PROCEDURAL LANGUAGE APPROACHES, THE OBJECT-ORIENTED PROGRAMMING APPROACH ALLOWS DATA STRUCTURES AND PROCEDURES TO BE DEFINED FOR GENERIC CLASSES OF OBJECTS. SYSTEM PERFORMANCE, RNA, AND COST DAT ...
SBIR Phase I 1991 Department of DefenseNavy -
SEQUENTIAL DESIGNS FOR MINE WARFARE PLANNING
SBC: The Associated Corp Topic: N/ATHE OBJECTIVE OF THIS PROPOSED RESEARCH IS TO DEVELOP NEW ANALYTIC METHODS FOR CHARACTERIZING MINE WARFARE EFFECTIVENESS. IT WILL USE A COMBINATION OF A PRIOR KNOWLEDGE OF SEQUENTIAL CHOICE OUTCOMES AND UNCERTAINTY IN SEQUENTIAL OUTCOMES. THE APPROACH WILL BE TO DEVELOP A SEQUENTIAL DESIGN ANALYSIS OF PERFORMANCE FOR INDIVIDUAL MINE FIELDS WHICH FULLY CHARACTERIZES SYSTEM PERFORMANCE LINKED TO OBJ ...
SBIR Phase I 1987 Department of DefenseNavy -
SUBMARINE COMBAT SYSTEM OPERATOR TRAINING WORKSTATION CONCEPTS
SBC: Business And Engineering Tech Topic: N/ATHIS TASK WILL IDENTIFY THE ISSUES CONCERNING COMBAT SYSTEM TRAINING REQUIREMENTS. IN ADDITION TO FUNCTIONAL NEEDS, THE ISSUES OF EASE OF SYSTEM UPGRADES AND RAPID PROTOTYPING WILL BE ADDRESSED. INITIAL INPUT DATA WILL BE OBTAINED FROM NAVAL TRAINING PLANS, AND EXISTING TRAINING DEVICE CAPABILITIES. THIS WILL IDENTIFY THE LEVELS OF REQUIRED TRAINING AND THE SKILLS THAT MUST BE TAUGHT. A WORKSTATIO ...
SBIR Phase I 1991 Department of DefenseNavy -
SUBMARINE COMBAT SYSTEM ARCHITECTURE WITH WORKSTATIONS
SBC: DEEGAN RESEARCH GROUP, INC. Topic: N/ACURRENT SUBMARINE COMBAT SYSTEM ARCHITECTURES REFLECT A WEAK LINKAGE FROM OPERATIONAL REQUIREMENTS TO IMPLEMENTATION. ARCHITECTURES RANGE FROM THOSE WITH LARGE CENTRAL COMPUTERS TO THOSE WITH CLUSTERED DISTRIBUTED PROCESSORS. SINGLE POINTS OF FAILURE, DATA BOTTLENECKS, AND PROCESSOR CONFLICTS RESULT FROM ARCHITECTURES THAT DO NOT HAVE OPERATIONAL REQUIREMENTS AS THEIR BASIS. THE EFFORT PROPOSED US ...
SBIR Phase I 1991 Department of DefenseNavy -
COMBINED MODELS FOR COMBAT SYSTEM ASSESSMENT
SBC: DEEGAN RESEARCH GROUP, INC. Topic: N/ATACTICAL PERFORMANCE, RELIABILITY, AND COST ARE COMPLIMENTARY FACTORS IN SYSTEM DESIGN BUT THERE IS NO ONE TOOL TO EFFECTIVELY COMPARE ATTRIBUTES IN THESE DISPARATE DISCIPLINES. THERE ARE COMPUTER PROGRAMS TO ESTIMATE SYSTEM PERFORMANCE AGAINST THE THREAT, COMPUTER MODELS TO PREDICT RELIABILITY IN A GIVEN ENVIRONMENT, AND COST MODELS TO ESTIMATE BOTH ACQUISITION AND OPERATIONS OVER TH6 LIFE OF A S ...
SBIR Phase I 1991 Department of DefenseNavy -
HF POWER SUPPLY FOR SUBMARINE COMBAT SYSTEMS
SBC: DEEGAN RESEARCH GROUP, INC. Topic: N/ARELIABLE AND CONTINUOUS POWER TO SUBMARINE ELECTRONICS IS ESSENTIALFOR MISSION EXECUTION AND FOR THE SAFE OPERATION OF THE SHIP. DIGITAL ELECTRONICS CANNOT CONTINUE OPERATION THROUGH EVEN VERY SHORT POWER OUTAGES CAUSE BY BUS TRANSFER DEVICES, THAT HAVE HISTORICALLY BEEN SUFFICIENT FOR ANALOG COMBAT SYSTEMS. THE RESTART AND RELOAD THAT A DIGITAL SYSTEM MUST EXECUTE AFTER A SHORT POWER INTERRUPTION ...
SBIR Phase I 1991 Department of DefenseNavy -
LOW COST HIGH PERFORMANCE CONTINUOUS FIBER CERAMIC COMPOSITES: 3-D BRAIDED PREFORMS AS SIC MATRIX COMPOSITES USING CVI
SBC: Quadrax Advanced Materials Topic: N/A3-D BRAIDED PREFORMS SHOULD INCREASE MECHANICAL PROPERTIES OF CERAMIC COMPOSITES IN ALL DIRECTIONS; ITS INTERLOCKING FIBER ARCHITECTURE SHOULD BE EFFECTIVE IN ARRESTING CRACKS, AND REMOVING CATASTROPIC FAILURE. THIS PROJECT ADDRESSES THE ISUES OF MERGING AN EFFECTIVE REINFORCEMENT SYSTEM WITH AN INEXPENSIVE CERAMIC MATRIX PROCESSING TECHNOLOGY TO DISCOVER A LOW COST MANUFACTURING ROUTE TO HIGH PER ...
SBIR Phase I 1991 Department of DefenseArmy -
TIARA- AN ADVANCED TARGETING ALGORITHM USING INTER-ARRAY RANGING
SBC: SEACORP, LLC Topic: N/ATHE NEED EXISTS FOR NEW ALGORITHMS AND METHODOLGIES FOR TRACKING AND/OR TARGETING LONG-RANGE PASSIVE CONTACTS SINCE CURRENT METHODS HAVE INHERENT LIMITATIONS. THE TREND TOWARD QUIETER, MORE ELUSIVE LONG-RANGE PASSIVE CONTACTS ALSO REQUIRES NEW APPROACHES TO LONG RANGE DETECTION AND TMA. THE APPROACH TO BE EXAMINED UNDER THIS PROJECT WOULD BE AN ACOUSTIC TRANSIENT INTER-ARRAY RANGING TECHNIQUE (TIA ...
SBIR Phase I 1991 Department of DefenseNavy -
ASW SEARCH PLANNING
SBC: PROMETHEUS INC. Topic: N/ACURRENT CAPABILITIES TO UTILIZE ASW SYSTEMS AND FORMULATE SEARCH PLANS ARE LIMITED BY THE ABILITY TO PROCESS REAL-TIME TACTICAL DATA. AN AUTOMATED SYSTEM, EXPLORING STATE-OF-THE-ART DEVELOPMENTS IN NEURAL NETWORK AND PARALLEL PROCESSING TECHNOLOGY, WOULD ENHANCE THE ABILITY TO PROCESS INFORMATION IN A TIMELY MANNER, AND WOULD THUS RESULT IN AN ABILITY TO OPTIMIZE SYSTEM LINE-UP. WE PROPOSE TO PROV ...
SBIR Phase I 1991 Department of DefenseNavy