You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
"ZERO Plastic" shipping containers for fabricating new parts from waste plastics
SBC: ZERO PLASTIC LLC Topic: A234P014Redacted.
SBIR Phase I 2023 Department of DefenseArmy -
Sustainable Geopolymer Concrete (GPC) using Indigenous and Waste Materials
SBC: HIFUNDA LLC Topic: A234P014Redacted.
SBIR Phase I 2023 Department of DefenseArmy -
Infini-D Summits: An Online Platform for Immersive Full-Class Literacy Simulations
SBC: INFINID LEARNING INC Topic: 91990023R0011Not available
SBIR Phase I 2023 Department of EducationInstitute of Education Sciences -
Extremely High Frequency Transmitter for Radar Applications
SBC: INNOSYS, INC. Topic: A22007Vacuum electron devices (VEDs) are critical components for DoD systems that require high power, high frequency (wide bandwidth), and high efficiency. There continue to be needs to push the technology to higher frequency to again support high power, wide bandwidth requirements for power devices. Robust short and medium-range air surveillance is an essential capability for the security of critical a ...
SBIR Phase I 2023 Department of DefenseArmy -
Insole based Physiological Gait Monitoring for Injury Prevention and Personalized Training for Increased Performance
SBC: NANO COMPOSITE PRODUCTS, INC Topic: A224025Redacted
SBIR Phase I 2023 Department of DefenseArmy -
Development of high energy density reserve lithium-oxygen batteries with integrated chemical oxygen generation
SBC: WASATCH IONICS LLC Topic: A22BT001The new Bottom Attach munitions for the Close Terrain-Shaping Obstacles (CTSO) program, currently under development by the Army, requires that reserve batteries operate 30 days after activation in a low power sleep mode, while providing multiple high-power pulses. This operational profile requires batteries with energy and power densities beyond the limits of the current liquid reserve batteries. ...
STTR Phase I 2022 Department of DefenseArmy -
Spray Dried Powder Compositions for Dual-use Secondary High Explosive and Rocket Propellants
SBC: DIVISION BY ZERO DEVELOPMENT LABS LLC Topic: A21CT001The U.S. Army has a future need for multiple secondary high explosive compositions that can also be used interchangeably as rocket propellants. In this proposal we will discuss a method of preparing such compositions via advanced spray drying technology and involving the use of a highly insensitive spray dried nitramine or CL-20 composition which have been plasticized with an energetic polymer t ...
STTR Phase I 2022 Department of DefenseArmy -
Attritable Radars for Contested Environments
SBC: IMSAR LLC Topic: A224017Redacted
SBIR Phase I 2022 Department of DefenseArmy -
High Energy Anodeless Battery for Unmanned Ground Vehicles and Beyond
SBC: STORAGENERGY TECHNOLOGIES INC Topic: A224017Redacted
SBIR Phase I 2022 Department of DefenseArmy -
Novel Food Ingredient with very high levels of Essential Amino Acids (EAA)
SBC: Technology Holding, LLC Topic: A22BT025The proposed program will span the design, production, purification, and testing of a novel protein based food ingredient with >80% Essential Amino Acid content. A generally recognized as safe (GRAS) production organism will be used to enhance the safety of production and accelerate the timeline to GRAS approval of the protein feed. The resulting material will be incorporated into combat rations t ...
STTR Phase I 2022 Department of DefenseArmy