You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. CREATION OF AS-BUILT DRAWINGS IN CAD SYSTEMS

    SBC: Antech Inc.            Topic: N/A

    A STUDY WILL BE MADE OF THE FEASIBILITY OF MAKING FIELD MEASUREMENTS OF EXISTING BUILDINGS AND AUTOMATICALLY CREATING AS-BUILT DRAWINGS IN A CAD SYSTEM. VARIOUS TYPES OF SCANNING DEVICES SUCH AS LASERS, SONARS, MECHANICAL, PHOTOGRAMMETRY, ETC. WILL BE STUDIED AND EVALUATIONS MADE REGARDING ACCURACY AND CONVENIENCE VERSUS COST. DATA PROTOCOL COMPATIBILITY BETWEEN THE MEASURING DEVICE AND THE DATA R ...

    SBIR Phase I 1987 Department of DefenseArmy
  2. CREATION OF AS-BUILT DRAWINGS IN CAD SYSTEMS

    SBC: Antech Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  3. INTELLIGENT TASK PLANNING AND EXECUTION FOR ROBOTIC CONTROL

    SBC: Artificial Intelligence            Topic: N/A

    THE OBJECTIVE OF THIS RESEARCH IS THE CONCEPTUAL DESIGN OF CAPABILITIES FOR TASK PLANNING AND PLAN EXECUTION IN A HIERARCHIAL ROBOTIC CONTROL SYSTEM. THE ROBOTIC CONTROL SYSTEM HAS MULTISENSORY CAPABILITIES INCLUDING FORCE/TORQUE, TACTILE AND VISION. LEVERAGE IS GAINED IN PLANNING EFFICIENCY BY STRUCTURING KNOWLEDGE OF 1 PREVIOUSLY USEFUL NAMED PLANS, PLANBOXES AND SCRIPTS TO REDUCE THE EFFORT NEE ...

    SBIR Phase I 1987 Department of DefenseArmy
  4. AUTOMATED WEATHER FACTOR ANALYSIS AND DISPLAY

    SBC: Command Control, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  5. DFAD-PLUS: A DATA FUSION METHODOLOGY FOR UPDATING AND INTENSIFYING DFAD USING IMAGE PROCESSING ARTIFICAL INTELLIGENCE TERRAIN ANALYSIS

    SBC: Erdas Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  6. THERMOPHILIC MICROORGANISMS AS SOURCE OF HEAT STABLE OXIDASE AND PEROXIDASE

    SBC: J.k. Research            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  7. COMPACT NEAR MILLIMETER WAVE SOURCES

    SBC: Millimeter Wave Technology,            Topic: N/A

    THE DEVELOPMENT OF SMALL, SOLID STATE SOURCES AT THE 0.7-2 MM WAVELENGTH (150 TO 430 GHZ) REGION IS REQUIRED TO REPLACE TUBE-TYPE SOURCES WHICH HAVE LARGE, BULKY POWER SUPPLIES. WE PROPOSE TO DEVELOP A LOW COST, BROADBAND AND EFFICIENT TECHNIQUE USING SINGLE AND MULTIPLE DIODES CONFIGURED AS UPCONVERTERS AND MULTIPLIERS. THESE DEVICES WILL BE DRIVEN BY LOWER FREQUENCY OSCILLATORS.

    SBIR Phase I 1987 Department of DefenseArmy
  8. RADAR SIGNATURE REDUCING FABRIC

    SBC: Millimeter Wave Technology,            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  9. TRACK STANDING WAVE ANALYSIS

    SBC: Mpr Assocs Inc            Topic: N/A

    THE PROPOSED FEASIBILITY STUDY IS AN ANALYSIS OF TRACKS OF TRACKED VEHICLES TO EVALUATE ALTERNATIVE MEANS TO DAMPEN STANDING WAVES IN THE TRACKS WHICH OCCUR WHEN THE TRACKED VEHICLES OPERATE AT HIGH SPEEDS. THE STANDING WAVES ABSORB POWER AND REDUCE DRIVETRAIN EFFICIENCY. A RUGGED, INEXPENSIVE MEANS OF DAMPING THE STANDING WAVES IS DESIRED.

    SBIR Phase I 1987 Department of DefenseArmy
  10. RESEARCH AND DEVELOPMENT OF MODELS, GUIDES, AND PLANS FOR HANDICAPPED POPULATIONS

    SBC: Policy Studies Assoc Inc            Topic: N/A

    THIS PROPOSAL DETAILS THE PLANNING PHASE OF A STUDY OF MODEL POSTSECONDARY PROGRAMS AIMED AT IMPROVING THE TRANSITION OF HANDICAPPED STUDENTS FROM SCHOOL TO WORK. THEPLANNING PHASE WILL INVOLVE A LITERATURE REVIEW AND SYNTHESIS, FORMATION OF AND CONSULTATION WITH AN ADVISORY PANEL, SITE SELECTION, CASE STUDY PROTOCOL DEVELOPMENT, PRELIMINARY CASE STUDIES, AND A FINAL REPORT. THE LITERATURE REVIEW ...

    SBIR Phase I 1987 Department of Education
US Flag An Official Website of the United States Government