You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ARTIFICIAL INTELLIGENCE FOR COMMAND AND CONTROL MAN MACHINE INTERFACE

    SBC: AMERIGENICS, INC.            Topic: N/A

    THE TACTICS AND DOCTRINE OF THE MODERN BATTLEFIELD DICTATE THE NEED FOR INTELLIGENT MACHINES TO ASSIST HUMAN OPERATORS. THE TECHNOLOGY ASSOCIATED WITH ENCAPSULATING THE KNOWLEDGE AND TECHNIQUES USED IN ARTIFICIAL INTELLIGENCE (AI) TO CAPTURE THE REASONING PROCESS THAT HUMAN EXPERTS PERFORM WILL HAVE A SIGNIFICANT IMPACT ON FUTURE COMPUTER SYSTEMS FOR THE MILITARY. EQUALLY AS IMPORTANT AS THE DEVEL ...

    SBIR Phase I 1987 Department of DefenseArmy
  2. ARTIFICIAL INTELLIGENCE FOR COMMAND AND CONTROL

    SBC: AMERIGENICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  3. DATA COMPRESSION FOR NAVAL MESSAGES (ADM/EDM)

    SBC: AMERIGENICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseNavy
  4. SEQUENTIAL DESIGNS FOR MINE WARFARE PLANNING

    SBC: The Associated Corp            Topic: N/A

    THE OBJECTIVE OF THIS PROPOSED RESEARCH IS TO DEVELOP NEW ANALYTIC METHODS FOR CHARACTERIZING MINE WARFARE EFFECTIVENESS. IT WILL USE A COMBINATION OF A PRIOR KNOWLEDGE OF SEQUENTIAL CHOICE OUTCOMES AND UNCERTAINTY IN SEQUENTIAL OUTCOMES. THE APPROACH WILL BE TO DEVELOP A SEQUENTIAL DESIGN ANALYSIS OF PERFORMANCE FOR INDIVIDUAL MINE FIELDS WHICH FULLY CHARACTERIZES SYSTEM PERFORMANCE LINKED TO OBJ ...

    SBIR Phase I 1987 Department of DefenseNavy
  5. GOAL DIRECTED SIMULATION FOR LOGISTICS PLANNING SYSTEM

    SBC: CARNEGIE GROUP, INC.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  6. AN INTELLIGENT INTERFACE FOR COMMAND AND CONTROL DECISION AIDS

    SBC: CHI SYSTEMS INC            Topic: N/A

    THIS PROJECT DEVELOPS AN INTELLIGENT INTERFACE FOR A COMMAND AND CONTROL DECISION-MAKER TRYING TO USE MULTIPLE ARTIFICAL-INTELLIGENCE BASED DECISION AIDS IN A COORDINATED MANNER. IT ADDRESSES THE CRITICAL NEED FOR COMMAND AND CONTROL DECISION-MAKERS TO BE ABLE TO USE ARTIFICIAL INTELLIGENCE AIDS WITHOUT COMPROMISING THEIR INTUITIVE COGNITIVE APPROACH TO THE REAL TIME AND MULTI-TASKING DEMANDS OF C ...

    SBIR Phase I 1987 Department of DefenseArmy
  7. DEVELOPMENT OF A HUMAN OPERATOR MODEL FOR SYSTEM EVALUATION

    SBC: CHI SYSTEMS INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  8. SOFTWARE ENGINEERING ENVIRONMENT FOR PARALLEL AND DISTRIBUTED SYSTEMS

    SBC: COMPUTER COMMAND & CONTROL CO.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseNavy
  9. STATISTICAL MODELS FOR ATTRIBUTED-BASED TRACK CORRELATION/ CLASSIFICATION

    SBC: DANIEL H WAGNER ASSOCIATES INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseNavy
  10. OPTICAL CONTROL OF MICROWAVE/MILLIMETER WAVE DEVICES

    SBC: F&H APPLIED SCIENCE ASSOC., INC.            Topic: N/A

    THE PRINCIPAL AIM OF THE PROJECT IS TO INVESTIGATE OPTICALLY CONTROLLED MICROWAVE AND MILLIMETER WAVE DEVICES, PARTICULARLY PIN DIODES. THE WORK WILL INCLUDE BOTH EXPERIMENTAL INVESTIGATION, DESIGN FABRICATION, AND TESTING OF THESE DEVICES. THE THEORETICAL WORK WILL INCLUDE THE MODELING AND EVALUATION OF THE DEVICES.

    SBIR Phase I 1987 Department of DefenseArmy
US Flag An Official Website of the United States Government