You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
VARIATIONAL EVALUATION OF EM COUPLING TO A WIRE INSIDE A CAVITY
SBC: Applied Physics Technologies Topic: N/ACONTRACTOR WILL DEVELOP A LAGRANGIAN FORMULATION FOR THE ELECTROMAGNETIC RESPONSE OF A METALLIC ENCLOSURE WITH THIN, SLIGHTLY DIFFUSIVE WALLS AND A WIRE SPANNING THE ENCLOSURE. CONTRACTOR WILL FIRST DERIVE A LAGRANGIAN OPERATOR ON THE FIELDS WHICH IS STATIONARY WHEN MAXWELL'S EQUATIONS ARE SATISFIED. THE LAGRANGIAN WILL THEN BE USED TO DETERMINE THE ENCLOSURE EIGENMODES (WIRE INCLUDED) AND THE AMP ...
SBIR Phase I 1987 Department of DefenseArmy -
EMP ENVIRONMENT PREDICTION FOR COLLIMATED SOURCES
SBC: Applied Physics Technologies Topic: N/ACODES CURRENTLY EXIST THAT WILL CALCULATE THE ELECTROMAGNETIC ENVIRONMENT (EMP) PRODUCED BY A BEAM OF COLLIMATED GAMMA RAYS. THE COLLIMATION MAY BE EITHER CYLINDRICAL OR CONICAL. THE CURRENT EFFORT WILL BE TO INSTALL THE CODES ON AN ARMY CRAY COMPUTER AND TO SET THEM UP AND RUN THEM FOR PROBLEMS OF INTEREST TO THE ARMY.
SBIR Phase I 1987 Department of DefenseArmy -
DEVELOPMENT OF A HIGH RANGE PARTICLE VELOCITY GAGE
SBC: Applied Research Associates, Inc. Topic: N/ATHERE IS AN ESTABLISHED NEED FOR A SIMPLE ROBUST TRANSDUCER TO MEASURE PARTICLE VELOCITY IN SEVERE BLAST AND SHOCK ENVIRONMENTS SUCH AS NUCLEAR AND HIGH EXPLOSIVE TESTS. A GAGE CONCEPT IS PROPOSED FOR DEVELOPMENT, BASED ON THE PROVEN MEASUREMENT PRINCIPLES USED IN THE HIGHLY SUCCESSFUL DX GAGE, BUT RECONFIGURED MECHANICALLY AND ELECTRICALLY TO WITHSTAND THE HARSH SHOCK ENVIRONMENTS. THE CONCEPT RE ...
SBIR Phase I 1987 Department of DefenseArmy -
LOW COST ANGULAR RATE SENSOR
SBC: A-TECH CORPORATION Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy -
OPTIMAL ISLET MATRIX FOR IMMUNOISOLATED TRANSPLANTS
SBC: Cytotherapeutics, Inc. Topic: N/ATHE LONG TERM OBJECTIVE OF THIS RESEARCH IS THE DEVELOPMENT AND INTRODUCTION INTO CLINICAL PRACTICE OF AN EFFECTIVE, AND BIOCOMPATIBLE IMPLANTABLE-HYBRID- ARTIFICIAL-PANCREAS WHICH IS CAPABLE OF SIGNIFICANT IMPROVEMENT IN THERAPY OF INSULIN DEPENDENT DIABETES. THE SPECIFIC AIM OF THIS PROJECT IS TO INVESTIGATE METHODS OF IMPROVING THE VIABILITY AND FUNCTION OF MACRO-ENCAPSULATED ISLETS. DEVELOPMEN ...
SBIR Phase I 1991 Department of Health and Human Services -
LOW MAINTENANCE DOOR CLOSURE
SBC: Electro Magnetic Topic: N/AWE HOPE TO INVESTIGATE THE POTENTIAL USE OF AN ELECTROMAGNETIC DOOR SEAL AS A COMPONENT IN A LOW MAINTENANCE DOOR CLOSURE. THIS SEAL WILL INSERT A LOSSY FERROMAGNETIC MATERIAL INTO THE PATH BY WHICH ELECTROMAGNETIC ENERGY ENTERS A SHIELDED ENCLOSURE AROUND THE PERIPHERY OF THE DOOR. THE MATERIAL IS EXPECTED TO REFLECT THE INCIDENT FIELD BECAUSE THE FERROMAGNETIC MATERIAL WILL OFFER A HIGH IMPEDANC ...
SBIR Phase I 1991 Department of DefenseArmy -
ELECTROMAGNETIC PULSE (EMP) COUPLING TO CABLES
SBC: Electro Magnetic Topic: N/AA COMBINED ANALYSIS AND EXPERIMENT PROGRAM IS PROPOSED THAT WILL IMPROVE THE ACCURACY OF THE REVISED TRANSMISSION LINE MODEL FOR A CABLE NEAR OR ON THE SURFACE OF A LOSSY EARTH. ANALYSIS WILL BE USED TO DETERMINE THE EFFECTS OF FREQUENCY DEPENDANT EARTH PARAMETERS ON THE MODELED IMPEDANCE. EXPERIMENTS WILL BE CONDUCTED UNDER CONTROLLED CONDITIONS TO VERIFY THE PREDICTIONS OF THE REVISED TRANSMISSI ...
SBIR Phase I 1991 Department of DefenseArmy -
DEVELOPMENT OF APPROXIMATIONS FOR A FAST-METHOD OF MOMENTS TECHNIQUE BASED ON NORMAL MODES
SBC: Electro Magnetic Topic: N/AN/A
SBIR Phase I 1987 Department of DefenseArmy -
DUAL POLARIZATION ULTRA-WIDEBAND ANTENNA
SBC: Electro Magnetic Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy -
DIGITAL INFRA-RED EYE COMMAND TRANSDUCER
SBC: Energy Optics, Inc. Topic: N/AALTHOUGH TECHNOLOGY IS ADVANCING AT AN EVER INCREASING PACE,ITS APPLICATION FOR USE BY HANDICAPPED INDIVIDUALS HAS BEEN SLOW. SEVERELY IMPAIRED INDIVIDUALS OFTEN REQUIRE SOME TYPE OF "HIGH TECHNOLOGY" MEANS TO ENABLE THEM TO HAVE A DEGREE OF MOBILITY. THE SPECIFIC AIM OF THIS PROGRAM IS TO INVESTIGATE THE POTENTIAL OF USING ELECTRO-OPTICS AS A MEANS FOR THE HANDICAPPED TO EFFECT CONTROL OF HIS/HER ...
SBIR Phase I 1987 Department of Education