  1. CURB CLIMBING WHEELCHAIR DEVELOPMENT

    SBC: Triodyne Inc            Topic: N/A

    SIDEWALK RAMPS, ADOPTED FOR THE SAFETY AND CONVENIENCE OF WHEELCHAIR BOUND CITIZENS, HAVE EXHIBITED A NUMBER OF SHORTCOMINGS. MILLIONS OF DOLLARS HAVE BEEN SPENT, AND WILLCONTINUE TO BE SPENT, FOR THE CONVERSION OF CURBS INTO RAMPSA LESS THAN SATISFACTORY SOLUTION TO THE PROBLEM. A MORE FEASIBLE APPROACH TO ALTERING THE MILLIONS OF CURBS IS THE ADDITION OF CURB CLIMBING CAPABILITIES TO THE FIFTY T ...

    SBIR Phase I 1987 Department of Education
  2. STOICHIOMETRIC DIESEL ENGINE

    SBC: ADIABATICS INCORPORATED            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  3. HIGH RESOLUTION DIGITAL RADIOGRAPHIC NDE OF LAMINAR BONDS IN COMPOSITE MATERIALS USING DISCRETE DETECTORS

    SBC: BIO-IMAGING RESEARCH, INC.            Topic: N/A

    THIS PHASE I SBIR PROGRAM PROPOSES TO DETERMINE THE FEASIBILITY OF USING HIGH-RESOLUTION DIGITAL RADIOGRAPHY (DR), LAMINOGRAPHY, AND COMPUTED TOMOGRAPHY (CT) TO EXAMINE LAMINAR BONDS IN COMPOSITE SAMPLES SUPPLIED BY THE ARMY. THE PROJECT WILL UTILIZE DISCRETE, SOLID-STATE X-RAY DETECTORS DESIGNED AND BUILT BY BIO-IMAGING RESEARCH, INC. THE PHASE I PROGRAM WILL ALSO RECOMMEND A PRELIMINARY DESIGN F ...

    SBIR Phase I 1987 Department of DefenseArmy
  4. HETERODYNE SHEARING INTERFEROMETRY FOR SURFACE PROFILE

    SBC: BIO-IMAGING RESEARCH, INC.            Topic: N/A

    WE PROPOSE TO DEVELOP AND VERIFY IN THIS PHASE I PROGRAM A TECHNIQUE THAT WILL ACCURATELY AND REPEATABLY MEASURE SURFACE PROFILES AND DISTANCES BETWEEN A TEST OBJECT AND DETECTORS USING THE SHEARING HETERODYNE INTERFEROMETRY TECHNIQUE. THE TECHNIQUE IS BASED ON SHEARING HETERODYNE INTERFEROMETRY WITH A FREQUENCY MODULATED LASER DIODE USING THE FOUR-BUCKET-INTEGRATING TECHNIQUE. IT CAN BE USED TO D ...

    SBIR Phase I 1991 Department of DefenseArmy
  5. ACT PROCESSORS FOR ECM APPLICATIONS

    SBC: Electronic Decisions, Inc.            Topic: N/A

    WITH INCREASING WAVEFORM COMPLEXITY AND EMITTER DENSITY IN THE TACTICAL ELECTROMAGNETIC SIGNAL ENVIRONMENT, THE JOB OF INTERCEPTING AND IDENTIFYING POTENTIALLY THREATS HAS OVERWHELMED THE CAPABILITIES OF CONVENTIONAL ESM RECEIVERS. THIS PROPOSAL DESCRIBES A PROGRAM TO STUDY THE APPLICATION OF ACOUSTIC CHARGE TRANSPORT (ACT) TECHNOLOGY TO ADVANCED ESM RECEIVER ARCHITECTURES. ACT IS AN EMERGING TECH ...

    SBIR Phase I 1991 Department of DefenseArmy
  6. LARGE-SCALE SOILS LABORTORY STRESS CELL

    SBC: Engineers International Inc            Topic: N/A

    THE DESIGN AND CONSTRUCTION OF A LARGE SCALE SOIL LABORATORY FACILITY CAPABLE OF IMPOSING AXISYMMETRIC STRESSES UP TO 1,000 PSI ON CYLINDRICAL SOIL SPECIMENS AS LARGE AS THREE METERS IN DIAMETER IS PROPOSED. THE OPTION OF PHASED CONSTRUCTION OF A 1-1/2 METER DIAMETER, FOLLOWED BY CONSTRUCTION OF A THREE METER DIAMETER FACILITY IS OFFERED. THE DESIGN WILL INCLUDE ALL ANCILLARY SPECIAL EQUIPMENT TO ...

    SBIR Phase I 1987 Department of DefenseArmy
  7. SURVIVABLE ADAPTIVE TACTICAL MULTIMEDIA COMMUNICATIONS

    SBC: Epsilon Lambda Electronics Corp.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  8. THERMOPHILIC MICROORGANISMS AS SOURCE OF HEAT STABLE OXIDASE AND PEROXIDASE

    SBC: J.k. Research            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  9. IMPROVED REPAIR TECHNIQUES FOR FIBER OPTIC CONNECTORS AND CABLES

    SBC: Koford Engineering            Topic: N/A

    CURRENTLY A PRIMARY DRAWBACK OF FIBER OPTIC SYSTEMS FOR MILITARY USE IS THE DIFFICULTY OF REPAIRING AND SERVICING THESE SYSTEMS. THE OBJECTIVE OF THIS PROJECT WILL BE TO DEVELOP TECHNIQUES FOR RAPID, RELIABLE FIELD REPAIR OF FIBER OPTIC CONNECTORS AND CABLES, TO PUT MAINTENANCE OF THESE SYSTEMS ON PAR WITH COPPER WIRE INTERCONNECTIONS.TECHNIQUES FOR RELIABLE HIGH PERFORMANCE TERMINATION OF GLASS F ...

    SBIR Phase I 1987 Department of DefenseArmy
  10. HIGH SPEED AERIAL CABLE TARGET TROLLEY

    SBC: Product Planning, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
US Flag An Official Website of the United States Government