You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
HIGH RESOLUTION DIGITAL RADIOGRAPHIC NDE OF LAMINAR BONDS IN COMPOSITE MATERIALS USING DISCRETE DETECTORS
SBC: BIO-IMAGING RESEARCH, INC. Topic: N/ATHIS PHASE I SBIR PROGRAM PROPOSES TO DETERMINE THE FEASIBILITY OF USING HIGH-RESOLUTION DIGITAL RADIOGRAPHY (DR), LAMINOGRAPHY, AND COMPUTED TOMOGRAPHY (CT) TO EXAMINE LAMINAR BONDS IN COMPOSITE SAMPLES SUPPLIED BY THE ARMY. THE PROJECT WILL UTILIZE DISCRETE, SOLID-STATE X-RAY DETECTORS DESIGNED AND BUILT BY BIO-IMAGING RESEARCH, INC. THE PHASE I PROGRAM WILL ALSO RECOMMEND A PRELIMINARY DESIGN F ...
SBIR Phase I 1987 Department of DefenseArmy -
HETERODYNE SHEARING INTERFEROMETRY FOR SURFACE PROFILE
SBC: BIO-IMAGING RESEARCH, INC. Topic: N/AWE PROPOSE TO DEVELOP AND VERIFY IN THIS PHASE I PROGRAM A TECHNIQUE THAT WILL ACCURATELY AND REPEATABLY MEASURE SURFACE PROFILES AND DISTANCES BETWEEN A TEST OBJECT AND DETECTORS USING THE SHEARING HETERODYNE INTERFEROMETRY TECHNIQUE. THE TECHNIQUE IS BASED ON SHEARING HETERODYNE INTERFEROMETRY WITH A FREQUENCY MODULATED LASER DIODE USING THE FOUR-BUCKET-INTEGRATING TECHNIQUE. IT CAN BE USED TO D ...
SBIR Phase I 1991 Department of DefenseArmy -
ACT PROCESSORS FOR ECM APPLICATIONS
SBC: Electronic Decisions, Inc. Topic: N/AWITH INCREASING WAVEFORM COMPLEXITY AND EMITTER DENSITY IN THE TACTICAL ELECTROMAGNETIC SIGNAL ENVIRONMENT, THE JOB OF INTERCEPTING AND IDENTIFYING POTENTIALLY THREATS HAS OVERWHELMED THE CAPABILITIES OF CONVENTIONAL ESM RECEIVERS. THIS PROPOSAL DESCRIBES A PROGRAM TO STUDY THE APPLICATION OF ACOUSTIC CHARGE TRANSPORT (ACT) TECHNOLOGY TO ADVANCED ESM RECEIVER ARCHITECTURES. ACT IS AN EMERGING TECH ...
SBIR Phase I 1991 Department of DefenseArmy -
LARGE-SCALE SOILS LABORTORY STRESS CELL
SBC: Engineers International Inc Topic: N/ATHE DESIGN AND CONSTRUCTION OF A LARGE SCALE SOIL LABORATORY FACILITY CAPABLE OF IMPOSING AXISYMMETRIC STRESSES UP TO 1,000 PSI ON CYLINDRICAL SOIL SPECIMENS AS LARGE AS THREE METERS IN DIAMETER IS PROPOSED. THE OPTION OF PHASED CONSTRUCTION OF A 1-1/2 METER DIAMETER, FOLLOWED BY CONSTRUCTION OF A THREE METER DIAMETER FACILITY IS OFFERED. THE DESIGN WILL INCLUDE ALL ANCILLARY SPECIAL EQUIPMENT TO ...
SBIR Phase I 1987 Department of DefenseArmy -
SURVIVABLE ADAPTIVE TACTICAL MULTIMEDIA COMMUNICATIONS
SBC: Epsilon Lambda Electronics Corp. Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy -
THERMOPHILIC MICROORGANISMS AS SOURCE OF HEAT STABLE OXIDASE AND PEROXIDASE
SBC: J.k. Research Topic: N/AN/A
SBIR Phase I 1987 Department of DefenseArmy -
DEVELOPMENT OF A COMPUTER MONITOR UTILIZING A FULL SCREEN BRAILLE DISPLAY.
SBC: Jacobsen Holz Corporation Topic: N/ATHE DEVELOPMENT OF A PROTOTYPE COMPUTER MONITOR FOR THE BLIND, UTILIZING BRAILLE CHARACTERS AS OPPOSED TO ALPHANUMERIC WILL BE PURSUED DURING PHASE I OF THIS PROJECT.BY COMBINING CURRENT STATE OF THE ART ELECTRONICS AND UTILIZING SOME SPECIAL HYDRAULICS, A SCREEN COULD BE DEVELOPED CONSISTING OF HYDRAULICALLY OPERATED MINIATURE PINS ARRANGED IN A STANDARD BRAILLE PATTERN. THE RAISING AND LOWERING ...
SBIR Phase I 1987 Department of Education -
ULTRASONIC TANK METEOROLOGICAL SENSOR
SBC: J-tec Assocs Inc Topic: N/AKNOWLEDGE OF THE AIR PRESSURE, TEMPERATURE AND HUMIDITY ARE REQUIRED FOR SOLUTION OF THE TANK FIRE CONTROL ALGORITHMS. THE SEVERE ENVIRONMENT OF THE TANK MAKES THE USE OF CONVENTIONAL SENSING TECHNIQUES VERY DIFFICULT. THE TRANSMISSION EFFICIENCY OF AN ULTRASONIC SIGNAL IS SHOWN TO BE DIRECTLY DEPENDENT UPON THE ABSOLUTE AIR PRESSURE AND INVERSELY PROPORTIONAL TO THE ABSOLUTE TEMPERATURE. THE SPEE ...
SBIR Phase I 1987 Department of DefenseArmy -
IMPROVED REPAIR TECHNIQUES FOR FIBER OPTIC CONNECTORS AND CABLES
SBC: Koford Engineering Topic: N/ACURRENTLY A PRIMARY DRAWBACK OF FIBER OPTIC SYSTEMS FOR MILITARY USE IS THE DIFFICULTY OF REPAIRING AND SERVICING THESE SYSTEMS. THE OBJECTIVE OF THIS PROJECT WILL BE TO DEVELOP TECHNIQUES FOR RAPID, RELIABLE FIELD REPAIR OF FIBER OPTIC CONNECTORS AND CABLES, TO PUT MAINTENANCE OF THESE SYSTEMS ON PAR WITH COPPER WIRE INTERCONNECTIONS.TECHNIQUES FOR RELIABLE HIGH PERFORMANCE TERMINATION OF GLASS F ...
SBIR Phase I 1987 Department of DefenseArmy -
HIGH SPEED AERIAL CABLE TARGET TROLLEY
SBC: Product Planning, Inc. Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy