You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
ADAPTIVE ARRAY TECHNOLOGY FOR TRANSPORTABLE LONG WAVELENGTH GROUND-BASED BISTATIC RADAR SYSTEMS
SBC: Adaptive Sensors Inc. Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy -
STOICHIOMETRIC DIESEL ENGINE
SBC: ADIABATICS INC Topic: N/AN/A
SBIR Phase I 1987 Department of DefenseArmy -
KNOWLEDGE SHARING
SBC: Advanced Decision Systems Topic: N/AADS PROPOSES TO PERFORM REQUIREMENTS ANALYSIS, CONCEPT DEVELOPMENT, AND FEASIBILITY ANALYSIS FOR A PHASE II IMPLEMENTATION OF A SORTER/ PARSER FOR INTERCEPTED MESSAGES IN THE TACTICAL BATTLEFIELD DOMAIN. THE CONCEPT PROPOSED FOR A MESSAGE SORTER PARSER UTILIZES A KEYWORDBASED INFORMATION RETRIEVAL PROGRAM, CALLED RUBRIC, TO SORT THE MESSAGES INTO SENDER AND INTENDED RECEIVER CATEGORIES, TOGETHER W ...
SBIR Phase I 1987 Department of DefenseArmy -
AI FOR COMMAND AND CONTROL: RESEARCH TOWARD A TERRAIN REASONING SYSTEM
SBC: Advanced Decision Systems Topic: N/AN/A
SBIR Phase I 1987 Department of DefenseArmy -
TEAMWORKS- A LABORATORY FOR THE STUDY OF TEAMWORK AMONG HUMANS AND ROBOTS
SBC: Advanced Decision Systems Topic: N/AN/A
SBIR Phase I 1987 Department of DefenseArmy -
ARTIFICIAL INTELLIGENCE FOR VOICE JAMMING
SBC: ADVANCED DIGITAL SYSTEMS, INC. Topic: N/AEVALUATION OF JAMMING EFFECTIVENESS IN DATA SIGNALS IS RATHER STRAIGHTFORWARD AND IS GENERALLY REPEATABLE. THAT IS, A PARTICULAR JAMMING SYSTEM WILL PRODUCE THE SAME BIT ERROR RATE EACH TIME A TEST IS RUN WITH THE SAME TEST PARAMETERS. EVALUATION OF EFFECTIVENESS OF JAMMING OF VOICE SIGNALS HOWEVER, IS VERY SUBJECTIVE AND EVEN WITH THE SAME TEST SUBJECTS, RESULTS WILL FREQUENTLY DIFFER FROM TEST T ...
SBIR Phase I 1987 Department of DefenseArmy -
ARTIFICIAL INTELLIGENCE FOR THREAT WARNING SYSTEMS
SBC: ADVANCED DIGITAL SYSTEMS, INC. Topic: N/ATHE OBJECTIVE OF THIS EFFORT IS TO EXPLORE THE POTENTIAL OF FINITE INDUCTIVE SEQUENCE PROCESSING (FISP) TO PROVIDE FOR SMART THREAT SENSOR SYSTEMS. THE PROPOSAL WILL SINGLE OUT THE RADAR WARNING RECEIVER (RWR) AS A CANDIDATE SYSTEM. FISP, HOWEVER, HAS APPLICATION AND CAPABILITY WELL BEYOND THAT WHICH WILL BE PROPOSED AND COULD BE USED AS AN ONBOARD, CHIP-LEVEL, KNOWLEDGE-BASED SENSOR FUSION SYSTEM ...
SBIR Phase I 1987 Department of DefenseArmy -
THRUST AUGEMENTATION SYSTEM FOR LOW COST EXPENDABLE TURBOJET ENGINE
SBC: Advanced Engineering Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy -
FREQUENCY TRANSLATOR GPS SIGNAL RECEIVER
SBC: 3s Navigation (dba For Topic: N/ATHE USE OF TRANSLATED OR TRANSDIGITIZED GLOBAL POSITIONING SYSTEM (GPS) SIGNALS IS A PROMISING METHOD FOR DETERMINING THE PRECISE FLIGHT PATH OF AN ARTILLERY SPOTTER ROUND. THE PRIMARY ELEMENTS OF THE GPS ARTILLERY SPOTTER ROUND SYSTEM ARE A GPS TRANSLATOR OR TRANSDIGITIZER IN THE PROJECTILE FUSE AND A TRANSLATED/TRANSDIGITIZED GPS RECEIVER LOCATED AT THE FIRING PLATFORM. THIS SYSTEM WILL PROVIDE ...
SBIR Phase I 1991 Department of DefenseArmy -
TRACKING LASER DATA LINK
SBC: Advanced Systems Concepts Topic: N/ATHE PURPOSE OF THIS PROJECT IS TO EXAMINE THE FEASIBLE OF DEVELOPING A TRACKING LASER DATA LINK. THE PROPOSED SYSTEM WILL USE A DUAL TRACKING SYSTEM, ONE ON THE RETROREFLECTIVE MOBILE UNIT, THE OTHER ON THE LASER. TRIANGULATION WILL BE USED TO PROVIDE LASER TRACKING WHEREAS PROJECTED PATH WILL BE USED IN THE MOBILE TRACKING UNIT. ACOUSTO-OPTICAL MODULATION OF THE LASER WILL BE USED FOR THE DATA LI ...
SBIR Phase I 1987 Department of DefenseArmy