You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
CREATION OF AS-BUILT DRAWINGS IN CAD SYSTEMS
SBC: Antech Inc. Topic: N/AA STUDY WILL BE MADE OF THE FEASIBILITY OF MAKING FIELD MEASUREMENTS OF EXISTING BUILDINGS AND AUTOMATICALLY CREATING AS-BUILT DRAWINGS IN A CAD SYSTEM. VARIOUS TYPES OF SCANNING DEVICES SUCH AS LASERS, SONARS, MECHANICAL, PHOTOGRAMMETRY, ETC. WILL BE STUDIED AND EVALUATIONS MADE REGARDING ACCURACY AND CONVENIENCE VERSUS COST. DATA PROTOCOL COMPATIBILITY BETWEEN THE MEASURING DEVICE AND THE DATA R ...
SBIR Phase I 1987 Department of DefenseArmy -
CREATION OF AS-BUILT DRAWINGS IN CAD SYSTEMS
SBC: Antech Inc. Topic: N/AN/A
SBIR Phase I 1987 Department of DefenseArmy -
INTELLIGENT TASK PLANNING AND EXECUTION FOR ROBOTIC CONTROL
SBC: Artificial Intelligence Topic: N/ATHE OBJECTIVE OF THIS RESEARCH IS THE CONCEPTUAL DESIGN OF CAPABILITIES FOR TASK PLANNING AND PLAN EXECUTION IN A HIERARCHIAL ROBOTIC CONTROL SYSTEM. THE ROBOTIC CONTROL SYSTEM HAS MULTISENSORY CAPABILITIES INCLUDING FORCE/TORQUE, TACTILE AND VISION. LEVERAGE IS GAINED IN PLANNING EFFICIENCY BY STRUCTURING KNOWLEDGE OF 1 PREVIOUSLY USEFUL NAMED PLANS, PLANBOXES AND SCRIPTS TO REDUCE THE EFFORT NEE ...
SBIR Phase I 1987 Department of DefenseArmy -
DESIGN OF A TACTICAL MULTI-MEDIA INFORMATION COMMUNICATION SYSTEM (MMICS)
SBC: Command Control, Inc. Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy -
AUTOMATED WEATHER FACTOR ANALYSIS AND DISPLAY
SBC: Command Control, Inc. Topic: N/AN/A
SBIR Phase I 1987 Department of DefenseArmy -
MEASUREMENT OF COMBAT PERFORMANCE
SBC: Continental Systems Technology Topic: N/ATHE ULTIMATE GOAL OF THE PROPOSED PROJECT IS TO DETERMINE IF THERE EXISTS WITHIN THE LITERATURE A SUFFICIENT FOUNDATION FOR THE DEVELOPMENT OF PRELIMINARY COMBAT PERFORMANCE MEASURES FOR ARMY ENLISTED SOLDIERS. DETERMINATION WILL BE BASED ON AN ANALYSIS OF A.) IDENTIFIED INDIVIDUAL PERFORMANCE CHARACTERISTICS ASSOCIATED WITH COMBAT, B.) MEASURES CURRENTLY AVAILABLE TO MEASURE THE IDENTIFIED CHARAC ...
SBIR Phase I 1991 Department of DefenseArmy -
DFAD-PLUS: A DATA FUSION METHODOLOGY FOR UPDATING AND INTENSIFYING DFAD USING IMAGE PROCESSING ARTIFICAL INTELLIGENCE TERRAIN ANALYSIS
SBC: Erdas Inc. Topic: N/AN/A
SBIR Phase I 1987 Department of DefenseArmy -
FRACTAL IMAGE COMPRESSION TECHNIQUES
SBC: Iterated Systems, Inc. Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy -
THERMOPHILIC MICROORGANISMS AS SOURCE OF HEAT STABLE OXIDASE AND PEROXIDASE
SBC: J.k. Research Topic: N/AN/A
SBIR Phase I 1987 Department of DefenseArmy -
DEVELOPMENT OF A COMPUTER MONITOR UTILIZING A FULL SCREEN BRAILLE DISPLAY.
SBC: Jacobsen Holz Corporation Topic: N/ATHE DEVELOPMENT OF A PROTOTYPE COMPUTER MONITOR FOR THE BLIND, UTILIZING BRAILLE CHARACTERS AS OPPOSED TO ALPHANUMERIC WILL BE PURSUED DURING PHASE I OF THIS PROJECT.BY COMBINING CURRENT STATE OF THE ART ELECTRONICS AND UTILIZING SOME SPECIAL HYDRAULICS, A SCREEN COULD BE DEVELOPED CONSISTING OF HYDRAULICALLY OPERATED MINIATURE PINS ARRANGED IN A STANDARD BRAILLE PATTERN. THE RAISING AND LOWERING ...
SBIR Phase I 1987 Department of Education