You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Development and Demonstration of a Non-hydraulic Actuator for Application in Active and/or Semi-active Suspension Systems

    SBC: Engineering Development Corp            Topic: N/A

    A program for the preliminary design, prototype construction, and bench testing of a linear pneumatic suspension strut for application in non-hydraulic combat vehicle suspension systems is presented. The proposed suspension strut system components include an air spring, accumulator, and variable size orifices for the active control of strut dynamic performance. Strut natural frequency, damping rat ...

    SBIR Phase I 1993 Department of DefenseArmy
  2. Heat Stable Alkaline Phosphatase from Thermophiles

    SBC: J.k. Research            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseArmy
  3. THERMOPHILIC MICROORGANISMS AS SOURCE OF HEAT STABLE OXIDASE AND PEROXIDASE

    SBC: J.k. Research            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  4. DEVELOPMENT OF A COMPUTER MONITOR UTILIZING A FULL SCREEN BRAILLE DISPLAY.

    SBC: Jacobsen Holz Corporation            Topic: N/A

    THE DEVELOPMENT OF A PROTOTYPE COMPUTER MONITOR FOR THE BLIND, UTILIZING BRAILLE CHARACTERS AS OPPOSED TO ALPHANUMERIC WILL BE PURSUED DURING PHASE I OF THIS PROJECT.BY COMBINING CURRENT STATE OF THE ART ELECTRONICS AND UTILIZING SOME SPECIAL HYDRAULICS, A SCREEN COULD BE DEVELOPED CONSISTING OF HYDRAULICALLY OPERATED MINIATURE PINS ARRANGED IN A STANDARD BRAILLE PATTERN. THE RAISING AND LOWERING ...

    SBIR Phase I 1987 Department of Education
  5. ULTRASONIC TANK METEOROLOGICAL SENSOR

    SBC: J-tec Assocs Inc            Topic: N/A

    KNOWLEDGE OF THE AIR PRESSURE, TEMPERATURE AND HUMIDITY ARE REQUIRED FOR SOLUTION OF THE TANK FIRE CONTROL ALGORITHMS. THE SEVERE ENVIRONMENT OF THE TANK MAKES THE USE OF CONVENTIONAL SENSING TECHNIQUES VERY DIFFICULT. THE TRANSMISSION EFFICIENCY OF AN ULTRASONIC SIGNAL IS SHOWN TO BE DIRECTLY DEPENDENT UPON THE ABSOLUTE AIR PRESSURE AND INVERSELY PROPORTIONAL TO THE ABSOLUTE TEMPERATURE. THE SPEE ...

    SBIR Phase I 1987 Department of DefenseArmy
  6. LOW COST HIGH PERFORMANCE CONTINUOUS FIBER CERAMIC COMPOSITES: 3-D BRAIDED PREFORMS AS SIC MATRIX COMPOSITES USING CVI

    SBC: Quadrax Advanced Materials            Topic: N/A

    3-D BRAIDED PREFORMS SHOULD INCREASE MECHANICAL PROPERTIES OF CERAMIC COMPOSITES IN ALL DIRECTIONS; ITS INTERLOCKING FIBER ARCHITECTURE SHOULD BE EFFECTIVE IN ARRESTING CRACKS, AND REMOVING CATASTROPIC FAILURE. THIS PROJECT ADDRESSES THE ISUES OF MERGING AN EFFECTIVE REINFORCEMENT SYSTEM WITH AN INEXPENSIVE CERAMIC MATRIX PROCESSING TECHNOLOGY TO DISCOVER A LOW COST MANUFACTURING ROUTE TO HIGH PER ...

    SBIR Phase I 1991 Department of DefenseArmy
  7. Develop Enironmental Monitoring Capability for Intergrating Recent Technological Advancements into a Hybrid Artificial Neural Network System

    SBC: SEACORP, LLC            Topic: N/A

    We propose to develop an Environmental Monitoring System by integrating various technologies to create a hybrid artificial neural network system. By functionally decomposing the requirements of environmental monitoring we can apply emerging technologies to fulfill these modularized requirements. Ten (10) years of experience indicate that the technologies directly applicable to specific requirement ...

    SBIR Phase I 1993 Department of DefenseArmy
  8. MODEL FOR PORT SCATTER FROM LASERS

    SBC: Toomay Mathis & Associates Inc            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
US Flag An Official Website of the United States Government