You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. PORTABLE LIGHT-WEIGHT FIELD DENTAL CHAIR UTILIZING COMPOSITE MATERIALS

    SBC: Adelsys Inc            Topic: N/A

    DENTAL ILLNESSES AND INJURIES OCCURRING IN THE FIELD ARE DIFFICULT TO TREAT WITHOUT A DENTAL CHAIR. WE HAVE DESIGNED A FIELD EXPEDIENT DENTAL CHAIR MADE OF COMPOSITE (PRIMARILY HONEYCOMB AND CARBONGRAPHITE FIBER) MATERIALS. THE CHAIR ALLOWS BOTH STAND-UP AND SIT DOWN DENTISTRY. THE CHAIR WEIGHS LESS THAN TEN LB., FOLDS TO A SMALL VOLUME, IS EASILY CLEANED AND IS RUGGED. ADDITIONALLY, THE DEVICE AL ...

    SBIR Phase I 1987 Department of DefenseArmy
  2. NEURAL NETWORK APPLICATIONS IN MILITARY PROCUREMENT LOGISTICS OPERATIONS INTELLIGENCE AND TRAINING

    SBC: Ai Ware, Inc.            Topic: N/A

    MANY COMPELLING EIS/ESS APPLICATIONS IN THE MILITARY AND IN INDUSTRY REMAIN INFEASIBLE DUE TO LIMITATIONS IN COMPUTER TECHNOLOGY. MANY INTERESTING PROBLEMS ARE TOO LARGE OR TOO COMPLEX FOR PRACTICAL SOLUTIONS BY TRADITIONAL APPROACHES. THE COMPLEXITY MAY ARISE FROM UNKNOWN, NON-LINEAR, OR TIME-VARYING RELATIONSHIPS BETWEEN VARIABLES. NEURAL NETWORK TECHNOLGY HAS DEMONTRATED SIGNIFICANT CAPABAILITI ...

    SBIR Phase I 1990 Department of DefenseArmy
  3. LFAD VS GUIDED MUNITIONS

    SBC: Applications Resources Inc            Topic: N/A

    THIS PROPOSAL DESCRIBES A NEW DECEPTION COUNTERMEASURE TECHNIQUE TO COUNTER ADVANCED GUIDED WEAPON SYSTEMS. PRIOR EXPERIMENTATION PERFORMED AT ARC DEMONSTRATED THE INTERACTIONS OF THE LFAD ANGULAR DECEPTION TECHNIQUE, SUPERIMPOSED ON TARGET LINE-OF-SIGHT RATE, AND THE IMPACT UPON MICROWAVE WEAPON SYSTEM PERFORMANCE. THESE PROJECTS EXPLORED SEVERAL OPERATIONAL SITUATIONS AND IDENTIFIED POTENTIAL WE ...

    SBIR Phase I 1987 Department of DefenseArmy
  4. LOW COST MULTI-SPECTRAL EXPENDABLE COUNTERMEASURES

    SBC: Applications Resources Inc            Topic: N/A

    THE PROPOSED CONCEPT IS A REFLECTOR-EXPENDABLE DESIGNED TO COUNTER WEAPONS SYSTEMS THAT UTILIZE INTEGRATED RF/EO/IR TARGET ACQUISITION AND TRACKING SYSTEMS THREAT FIRE CONTROL SENSORS OVER THE ENTIRE FREQUENCY. THIS PHASE I EFFORT IS CONCERNED WITH PROVING PRELIMINARY FEASIBILITY OF THE BASIC CONCEPT ANALYTICALLY FOR APPLICATIONS ON SEMA AIRCRAFT, AND TO PERFORM SUFFICIENT PACKAGING ANALYSIS TO ES ...

    SBIR Phase I 1987 Department of DefenseArmy
  5. 30MM COMVAT FEED SYSTEM STUDY

    SBC: ARES, INC.            Topic: N/A

    IN SUPPORT OF THE IDENTIFIED NEED FOR A FULL SCALE FEED SYSTEM FOR COMVAT WHICH WILL BE COMPATIBLE WITH FUTURE AND PRESENT RESUPPLY VEHICLES AND REQUIRE LITTLE EFFORT FROM THE CREW, THIS SIX MONTH TRADE STUDY WILL CREATE, AND ANALYZE A MINIMUM OF THREE FEED SYSTEM CONCEPTS VIA A SYSTEMS APPROACH. SYSTEM REQUIREMENTS WILL BE ESTABLISHED, WEIGHTED AND APPROVED BY THE SPONSORING AGENCY PRIOR TO THE C ...

    SBIR Phase I 1987 Department of DefenseArmy
  6. LOW LOSS MILLIMETER-WAVE SEMICONDUCTOR WAFER PROBES

    SBC: Cascade Microtech, Inc.            Topic: N/A

    MAKING ACCURATE AUTOMATED ON-WAFER MEASUREMENTS OF MILLIMETER-WAVE SEMICONDUCTOR DEVICES AND CIRCUIT ELEMENTS IS A FUNDAMENTAL REQUIREMENT FOR THE ADVANCEMENT OF A MILLIMETER-WAVE TECHNOLOGY. MILLIMETER-WAVE WAFER PROBE DEVELOPMENT IS REQUIRED. PRESENTLY ON-WAFER PROBING IS AVAILABLE ONLY TO 26.5 GHZ. HOWEVER, SIGNIFICANT INNOVATIONS ARE REQUIRED TO EXTEND THIS CAPABILITY OF HIGHER FREQUENCIES. TH ...

    SBIR Phase I 1987 Department of DefenseArmy
  7. A COMPACT ROBOTIC COMMAND CENTER SIMULATOR

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: N/A

    TO CONSTRUCT AN EMULATION CAPABILITY FOR EXISTING OR PLANNED ROBOTIC COMMAND CENTERS (RCCS) WE PROPOSE TO APPLY TECHNOLOGY DEVELOPED FOR SIMULATION AND CONTROL OF TELEOPERATED SERVICING ROBOTIC SYSTEMS TO THE PROBLEM. AS PART OF A COLLABORATION WITH IN THE CENTER FOR AUTONOMOUS AND MAN-CONTROLLED ROBOTIC AND SENSING SYSTEMS, A NASA SPONSORED CENTER FOR COMMERCIAL DEVELOPMENT OF SPACE AUTOMATION AN ...

    SBIR Phase I 1990 Department of DefenseArmy
  8. A TECHNOLOGY CLASSIFICATION AID FOR ARTIFICAL INTELLIGENCE

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: N/A

    ARTIFICIAL INTELLIGENCE RESEARCH HAS PROGRESSED TO THE POINT WHERE IT HAS PRODUCED A WIDE RANGE OF APPLICATIONS, TOOLS AND TECHNIQUES. TO ASSURE THAT THESE SYSTEMS WILL RELIABLY PERFORM WILL REQUIRE THE DEVELOPMENT OF ADVANCED TESTING PROCEDURES. THIS PROPOSAL DETAILS A PLAN FOR ORGANIZING ARTIFICIAL INTELLIGENCE KNOWLEDGE AND BUILDING SOFTWARE TOOLS WHICH USE THIS KNOWLEDGE AS A FIRST STEP TOWARD ...

    SBIR Phase I 1991 Department of DefenseArmy
  9. KNOWLEDGE BASE DEVELOPMENT FOR ROTORCRAFT PILOT-VEHICLE INTERFACE

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: N/A

    A SIGNIFICANT LEVEL OF EFFORT HAS BEEN DEDICATED TO THE DEVELOPMENT OF SOPHISTICATED DECISION AIDS FOR THE ADVANCED COCKPIT OF THE 1990'S AND BEYOND. THE GOAL OF MUCH OF THIS WORK HAS BEEN TO EQUIP THE FUTURE PILOT OF A MULTI-MISSION AIRCRAFT WITH THE LEVEL OF TACTICAL, AVIONICS, AND MISSION SUPPORT NOW ONLY POSSIBLE IN MULTI-MAN COCKPITS. USE OF ADVANCED ARTIFICIAL INTELLIGENCE SYSTEMS, MELDED IN ...

    SBIR Phase I 1991 Department of DefenseArmy
  10. A COMPACT ROBOTIC COMMAND CENTER PHASE II: IMPLEMENTING A HARDENED COMPACT UNIT

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseArmy
US Flag An Official Website of the United States Government