You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. TECHNOLOGY DEVELOPMENT FOR A LARGE-SCALE, SPACE-BASED, COMPLIANT MANIPULATOR

    SBC: Adaptive Machine Technologies            Topic: N/A

    THE PERFORMANCE OF LARGE-SCALE, LIGHTWEIGHT, SPACE-BASED MANIPULATORS IS CURRENTLY LIMITED BY THE AVAILABLE CONTROL SYSTEM TECHNOLOGIES. TO ACHIEVE HIGH PERFORMANCE WITH A SPACE-BASED MANIPULATOR, A CONTROL SYSTEM IS REQUIRED WHICH DOES NOT UNDERGO PERFORMANCE DEGRADATION DUE TO MANIPULATOR LINK FLEXURE. RESEARCH AND DEVELOPMENT IN THE AREA OF COMPLIANT MANIPULATOR CONTROL HAS BEEN HINDERED BY TWO ...

    SBIR Phase I 1987 National Aeronautics and Space Administration
  2. PORTABLE LIGHT-WEIGHT FIELD DENTAL CHAIR UTILIZING COMPOSITE MATERIALS

    SBC: Adelsys Inc            Topic: N/A

    DENTAL ILLNESSES AND INJURIES OCCURRING IN THE FIELD ARE DIFFICULT TO TREAT WITHOUT A DENTAL CHAIR. WE HAVE DESIGNED A FIELD EXPEDIENT DENTAL CHAIR MADE OF COMPOSITE (PRIMARILY HONEYCOMB AND CARBONGRAPHITE FIBER) MATERIALS. THE CHAIR ALLOWS BOTH STAND-UP AND SIT DOWN DENTISTRY. THE CHAIR WEIGHS LESS THAN TEN LB., FOLDS TO A SMALL VOLUME, IS EASILY CLEANED AND IS RUGGED. ADDITIONALLY, THE DEVICE AL ...

    SBIR Phase I 1987 Department of DefenseArmy
  3. AMTEC CONDENSER DESIGN FOR ZERO-G OPERATION

    SBC: ADVANCED MODULAR POWER SYSTEMS            Topic: N/A

    N/A

    SBIR Phase I 1991 National Aeronautics and Space Administration
  4. ENHANCED COMPUTATIONAL STRUCTURAL METHODS FOR AEROSPACE APPLICATIONS

    SBC: Ai Ware, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 National Aeronautics and Space Administration
  5. LFAD VS GUIDED MUNITIONS

    SBC: Applications Resources Inc            Topic: N/A

    THIS PROPOSAL DESCRIBES A NEW DECEPTION COUNTERMEASURE TECHNIQUE TO COUNTER ADVANCED GUIDED WEAPON SYSTEMS. PRIOR EXPERIMENTATION PERFORMED AT ARC DEMONSTRATED THE INTERACTIONS OF THE LFAD ANGULAR DECEPTION TECHNIQUE, SUPERIMPOSED ON TARGET LINE-OF-SIGHT RATE, AND THE IMPACT UPON MICROWAVE WEAPON SYSTEM PERFORMANCE. THESE PROJECTS EXPLORED SEVERAL OPERATIONAL SITUATIONS AND IDENTIFIED POTENTIAL WE ...

    SBIR Phase I 1987 Department of DefenseArmy
  6. LOW COST MULTI-SPECTRAL EXPENDABLE COUNTERMEASURES

    SBC: Applications Resources Inc            Topic: N/A

    THE PROPOSED CONCEPT IS A REFLECTOR-EXPENDABLE DESIGNED TO COUNTER WEAPONS SYSTEMS THAT UTILIZE INTEGRATED RF/EO/IR TARGET ACQUISITION AND TRACKING SYSTEMS THREAT FIRE CONTROL SENSORS OVER THE ENTIRE FREQUENCY. THIS PHASE I EFFORT IS CONCERNED WITH PROVING PRELIMINARY FEASIBILITY OF THE BASIC CONCEPT ANALYTICALLY FOR APPLICATIONS ON SEMA AIRCRAFT, AND TO PERFORM SUFFICIENT PACKAGING ANALYSIS TO ES ...

    SBIR Phase I 1987 Department of DefenseArmy
  7. PRESSURE INFILTRATION OF NET-SHAPE GRAPHITE PERFORMS FOR METAL MATRIX COMPOSITES

    SBC: Applied Sciences Inc.            Topic: N/A

    MUCH OF THE COST OF ADVANCED COMPOSITES IS DUE TO FIBER HANDLING AND CONSOLIDATION. THESE "FIBER PLACEMENT" COSTS RISE AS THE SHAPE OF THE COMPONENT BECOMES MORE COMPLEX AND AS THE NUMBER OF REINFORCED DIRECTIONS INCREASES. THIS PROJECT WILL INVESTIGATE A NEW METHOD FOR PRODUCING THREE-DIMENSIONAL, CARBON-REINFORCED METAL-MATRIX COMPOSITES. ALL FIBER-HANDLING STEPS ARE ELIMINATED THROUGHTHE USE OF ...

    SBIR Phase I 1991 National Aeronautics and Space Administration
  8. 30MM COMVAT FEED SYSTEM STUDY

    SBC: ARES, INC.            Topic: N/A

    IN SUPPORT OF THE IDENTIFIED NEED FOR A FULL SCALE FEED SYSTEM FOR COMVAT WHICH WILL BE COMPATIBLE WITH FUTURE AND PRESENT RESUPPLY VEHICLES AND REQUIRE LITTLE EFFORT FROM THE CREW, THIS SIX MONTH TRADE STUDY WILL CREATE, AND ANALYZE A MINIMUM OF THREE FEED SYSTEM CONCEPTS VIA A SYSTEMS APPROACH. SYSTEM REQUIREMENTS WILL BE ESTABLISHED, WEIGHTED AND APPROVED BY THE SPONSORING AGENCY PRIOR TO THE C ...

    SBIR Phase I 1987 Department of DefenseArmy
  9. CAPACITOR COMPONENTS FOR 2 K DETECTORS

    SBC: CERAMPHYSICS, INC.            Topic: N/A

    THIS PROJECT WILL MEASURE FOR THE FIRST TIME THE DIELECTRIC PROPERTIES OF SEVEN CATEGORIES OF CERAMIC MATERIALS AT 2 K TO DEVELOP CAPACITOR COMPONENTS FOR DETECTORS AND DETECTOR ARRAYS. ALL CERAMIC SAMPLES ARE IN THE FORM OF MULTILAYER CAPACITORS OR CAN BE MADE IN THIS FORM BY CONVENTIONAL CERAMIC PROCESSING. THE CATEGORIES ARE BATIO3-SRTIO3 CERAMICS; PROPRIETARY MANUFACTURERS' COMPOSITIONS; CD-PB ...

    SBIR Phase I 1991 National Aeronautics and Space Administration
  10. IMPROVED REGENERATOR MATERIALS FOR CRYOCOOLERS

    SBC: CERAMPHYSICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1991 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government