You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. INTELLIGENT KNOWLEDGE-BASED CAD FOR PRODUCIBILITY

    SBC: Cim Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  2. PROTOTYPE INTELLIGENT MAINTENANCE TUTORING SYSTEM

    SBC: Computer Thought Corp            Topic: N/A

    THE UTILIZATION OF INTELLIGENT MAINTENANCE TUTORING SYSTEMS ACROSS A WIDE RANGE OF APPLICATIONS CAN BRING A NEW LEVEL OF ABILITY AND LEARNING. TO DEMONSTRATE THE POTENTIAL INHERENT IN THIS CONCEPT, COMPUTER * THROUGHT WILL BUILD AND DELIVER A SOFTWARE SYSTEM THAT IS A WORKING PROTOTYPE FOR A MAINTENANCE TRAINING SYSTEM FOR ASSISTING PERSONNEL IN FAULT DIAGNOSIS AND REPAIR OF DEFECTIVE M16 INFANTRY ...

    SBIR Phase I 1987 Department of DefenseArmy
  3. MODELS FOR MULTI-REGION SAW WAVEGUIDES ON ANISOTROPIC SUBSTRATES

    SBC: Hartmann Research Inc.            Topic: N/A

    THE PROPOSED RESEARCH WILL DEVELOP A MORE ACCURATE METHOD FOR ANALYZING SAW DEVICES BASED ON MODELING A SAW TRANSDUCER AS AN ACOUSTIC WAVEGUIDE. APPROXIMATE ANALYSIS HAS SHOWN THAT IN MOST CASES, THE LOWEST ORDER TRANSDUCER WAVEGUIDE MODES HAVE UNDESIRABLE MODE SHAPES THAT TEND TO CONCENTRATE ENERGY UNDER THE BUS BARS ON EITHER SIDE OF THE STRUCTURE. A MORE COMPLEX TRANSDUCER STRUCTURE IS PROPOSED ...

    SBIR Phase I 1987 Department of DefenseArmy
  4. ADVANCED FACILITIES TO EXPEDITE DESIGN AND EVALUATION OF COMMUNICATIONS SYSTEMS

    SBC: Information Research            Topic: N/A

    THE TECHNICAL OBJECTIVE OF THIS PROJECT IS TO ESTABLISH THE FEASILBILITY OF SATISFYING THE REQUIREMENTS OF THE U.S. ARMY COMMUNICATIONS ELECTRONICS COMMAND (CECOM) FOR RAPID AND EFFECTIVE MODELING OF U.S. ARMY COMMUNICATION SYSTEMS. THE METHOD WE PROPOSE FOR SATISFYING THESE REQUIREMENTS IS TO ADAPT A TOP-DOWN DESIGN SYSTEM FOR ELECTRONIC SYSTEMS BEING DEVELOPED FOR THE U.S. NAVY TO MODEL-ING OF C ...

    SBIR Phase I 1987 Department of DefenseArmy
  5. TECHNIQUE FOR IN-SITU QUANTITATION OF DOPANTS AND MAJOR ELEMENT DURING EPILAYER GROWTH AND PROCESSING

    SBC: Ionwerks, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  6. THERMOPHILIC MICROORGANISMS AS SOURCE OF HEAT STABLE OXIDASE AND PEROXIDASE

    SBC: J.k. Research            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  7. DEVELOPMENT OF VISUAL INSTRUCTION MATERIALS FOR MATH AND SCIENCE CURRICULUM USING THE TOPOLOGICAL PANORAMA CAMERA

    SBC: Janet Gelphman Photography            Topic: N/A

    LEARNING ABILITIES IN MATHEMATICS AND THE SCIENCES ARE NOT MAXIMIZED BECAUSE OF THE LACK OF VISUAL INSTRUCTIONAL MATERIALS. THE IMPROVEMENT OF THESE SKILLS IS IMPORTANT BECAUSE BETTER SCIENCE AND MATH ABILITIES ARE NEEDED IN THE UNITED STATES IN ORDER TO KEEP UP WITH OTHER INDUSTRIALIZED NATIONS. OUR PROPOSED SOLUTION IS TO USE A NEW TECHNOLOGY, THE TOPOLOGICAL PANORAMA CAMERA, TO CREATE COST-EFFE ...

    SBIR Phase I 1987 Department of Education
  8. CERAMIC COMPONENT NONDESTRUCTIVE TESTING TECHNOLOGY

    SBC: KARTA TECHNOLOGIES            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  9. PROLONGED PRESERVATION OF HUMAN PLATELETS FOR COMBAT CASUALTY CARE

    SBC: LIFECELL CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  10. ELECTROCHEMICALLY BASED ADVANCED OZONATION MODULES FOR WATER STERILIZATION AND PURIFICATION

    SBC: Lynntech Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
US Flag An Official Website of the United States Government