You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ADVANCED FASTENER SYSTEM FOR COMPOSITE STRUCTURES

    SBC: Fatigue Technology Inc            Topic: N/A

    A RESEARCH PROGRAM WILL BE PERFORMED TO PRODUCE A MORE COMPLETE UNDERSTANDING OF FASTENING SYSTEMS FOR ADVANCED COMPOSITES. THIS WILL INCLUDE EVALUATIONS OF CURRENT PRODUCTION FASTENER SYSTEMS AS WELL AS A CANDIDATE SYSTEM BASED ON THE USE OF A COLD EXPANSION PROCESS TO PERMANENTLY INSTALL THIN WALL PROTECTIVE GROMMETS IN FASTENER HOLES IN COMPOSITIES. THESE FASTENER SYSTEMS WILL BE TESTED FOR INT ...

    SBIR Phase I 1991 Department of DefenseArmy
  2. A LOW-COST MINIATURE VOID SENSOR

    SBC: Silicon Designs, Inc.            Topic: N/A

    MECHANICAL G-SWITCHES ARE PRESENTLY AVAILABLE THAT SENSE WHEN THE ACCELERATION EXCEEDS A SPECIFIED VALUE. CONTACT RESISTANCE IS A PROBLEM EVEN WITH NEWLY FABRICATED MECHANICAL G-SWITCHES. MECHANICAL CONTACTS ARE ALSO SUBJECT TO SWITCH BOUNCE AND DAMAGE DURING THE INITIAL SHOCK OF IMPACT. SILICON DESIGNS HAS DEVELOPED A PROCESS FOR BUILDING MICROMECHANICAL SENSE ELEMENTS ON THE SURFACE OF A SILICON ...

    SBIR Phase I 1987 Department of DefenseArmy
  3. AN INTEGRATED CIRCUIT FOR AIR FLIGHT SENSOR SIGNAL PROCESSING

    SBC: Silicon Designs, Inc.            Topic: N/A

    THE PURPOSE OF AN AIR FLIGHT SENSOR SUBSYSTEM IS TO DETECT THE SIGNATURE OF FLIGHT CONDITIONS AFTER A PROJECTILE HAS BEEN SAFELY FIRED. THIS INFORMATION, WHEN COMBINED WITH OTHER CHARACTERISTICS OF PROJECTILE FIRING, SUCH AS ACCELERATION, PROVIDES POSITIVE INDICATION WHEN IT IS SAFE TO ARM THE WARHEAD. WE PROPOSE TO BUILD THE FLIGHT SENSOR SIGNAL PROCESSING AS A SINGLE, CUSTOM INTEGRATED CIRCUIT. ...

    SBIR Phase I 1987 Department of DefenseArmy
  4. DEVELOPMENT OF A FIBER-OPTIC CHAMBER PRESSURE TRANSDUCER

    SBC: Waterjet Technology Inc            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  5. DEVELOPMENT OF A PANEL METHOD FOR MODELING CONFIGURATIONS WITH UNSTEADY COMPONENT MOTIONS

    SBC: TARGAZYME, INC.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  6. HIGH SPEED NONPOLARIZING NEUTRAL DENSITY FILTER

    SBC: Photon Sciences (old:flow Res)            Topic: N/A

    BY APPLYING ADVANCED CONCEPTS IN LIQUID CRYSTAL TECHNOLOGY A DYNAMIC, IMAGING QUALITY, NONPOLARIZING, NEUTRAL DENSITY FILTER CAN BE CONSTRUCTED WHICH WILL VARY TRANSMITTED LIGHT INTENSITY OVER A FULL RANGE OF NEARLY 0 TO 100%. THIS DEVICE WOULD POSSESS A SWITCHING SPEED ON THE ORDER OF ONE MILLISECOND AND COULD BE FABRICATED AT LOW COST OVER A VERY LARGE RANGE OF SIZES.

    SBIR Phase I 1987 Department of DefenseArmy
  7. IMPACT OF CLIMATE CHANGE ON MILITARY ACTIVITIES

    SBC: Matrix Management Gp            Topic: N/A

    GLOBAL WARMING, CLIMATE CHANGE, OZONE LAYER DEPLETION ARE TOPICS OF SCIENTIFIC AND PUBLIC INTEREST. THE POTENTIAL IMPACTS OF THESE CHANGES INCLUDES SEA LEVEL RISE, CHANGES IN PRECIPITATION PATTERNS, ELIMINATION OF ARABLE LAND, AND ALTERATIONS OF NAVIGABLE WATERWAYS. EACH OF THESE IMPACTS HAS FURTHER IMPACT ON MILITARY ACTIVITIES AND OPERATIONS. PLANNING, POLICY MAKING, STRATEGY DEVELOPMENT, AND BU ...

    SBIR Phase I 1991 Department of DefenseArmy
  8. LIGHT-WEIGHT FIELD PORTABLE REMOTE EXPLOSIVES DEPLOYMENT SYSTEM

    SBC: Flow Research Inc            Topic: N/A

    THE PROPOSED PROJECT ADDRESSES THE NEED FOR A SYSTEM TO DEPLOY EXPLOSIVES UNDERGROUND. THE SYSTEM WOULD BE BASED ON A GUIDED HORIZONTAL BORING TOOL CAPABLE OF MAKING EXCAVATIONS UP TO 400 FEET IN LENGTH AT DEPTHS UP TO 7 FEET. THE TOOL USES PRESSURIZED FLUID JETS TO CUT THROUGH A WIDE VARIETY OF SOIL TYPES. THE BORING TOOL COULD BE USED TO EITHER DROP AN EXPLOSIVE DEVICE AT A DESIRED LOCATION OR T ...

    SBIR Phase I 1987 Department of DefenseArmy
  9. LOW COST HIGH PERFORMANCE CONTINUOUS FIBER CERAMIC COMPOSITES: 3-D BRAIDED PREFORMS AS SIC MATRIX COMPOSITES USING CVI

    SBC: Quadrax Advanced Materials            Topic: N/A

    3-D BRAIDED PREFORMS SHOULD INCREASE MECHANICAL PROPERTIES OF CERAMIC COMPOSITES IN ALL DIRECTIONS; ITS INTERLOCKING FIBER ARCHITECTURE SHOULD BE EFFECTIVE IN ARRESTING CRACKS, AND REMOVING CATASTROPIC FAILURE. THIS PROJECT ADDRESSES THE ISUES OF MERGING AN EFFECTIVE REINFORCEMENT SYSTEM WITH AN INEXPENSIVE CERAMIC MATRIX PROCESSING TECHNOLOGY TO DISCOVER A LOW COST MANUFACTURING ROUTE TO HIGH PER ...

    SBIR Phase I 1991 Department of DefenseArmy
  10. MODEL FOR PORT SCATTER FROM LASERS

    SBC: Toomay Mathis & Associates Inc            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
US Flag An Official Website of the United States Government