You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. Compliant Brush Shroud Casing Development for Aircraft Engine Compressors

    SBC: ADVANCED COMPONENTS & MATERIALS, INC.            Topic: N/A

    The proposed Phase II program will optimize the design and manufacturing process of a compliant brush shroud casing. Recent tests at Wright Laboratories with staged brush seals have demonstrated significantly increased blade to shroud rub tolerance of acompliant casing. Phase I of the program is expected to demonstrate the feasibility of two innovative brush shroud designs with lower cost and we ...

    SBIR Phase I 2001 Department of DefenseAir Force
  2. Phase-locked Fiber Lasr Array

    SBC: ADVR, Inc            Topic: N/A

    The purpose of this Phase II effort is to build a rugged, compact optical phased array for coherent addition of laser beams, a crucial building block for multi-kilowatt continuous wave laser devices. This effort builds on the success of the Phase I effortwhere it was shown that an array of electro-optic waveguides in Potassium Titanyl Phosphate (KTP) could be used for phase control. The low-voltag ...

    SBIR Phase I 2001 Department of DefenseAir Force
  3. CAD STATION RM ON-LINE SUPPORT SYSTEM

    SBC: Aquidneck Management Associate            Topic: N/A

    THIS PROJECT OUTLINES A RELIABILITY AND MAINTAINABILITY KNOWLEDGE BASE AND THE HYPERTEXT INTERFACE REQUIRED TO TRANSPORT THIS DATA INTO COMPUTER-AIDED DESIGN (CAD) ENVIRONMENTS. THE PRIMARY FOCUS OF THE PROPOSAL IS THE DEVELOPMENT OF THE FOUNDATION FOR AN ENGINEERING RELIABILITY AND MAINTAINABILITY INFORMATION PRESENTATION SYSTEM TO SUPPORT ELECTRONIC CIRCUIT AND SYSTEMS DESIGN ENGINEERS IN A CAD ...

    SBIR Phase I 1991 Department of DefenseAir Force
  4. SIMULTANEOUS ENGINEERING AUTOMATION

    SBC: Aquidneck Management Associate            Topic: N/A

    A NEW GENERATION OF ENGINEERING AND MANUFACTURING AUTOMATION DESIGNTOOLS ARE NOW EMERGING AS A RESULT OF THE PIONEERING WORK THAT HAS BEEN DONE IN OBJECTORIENTED PROGRAMMING TECHNOLOGY. UNLIKE CONVENTIONAL PROCEDURAL LANGUAGE APPROACHES, THE OBJECT-ORIENTED PROGRAMMING APPROACH ALLOWS DATA STRUCTURES AND PROCEDURES TO BE DEFINED FOR GENERIC CLASSES OF OBJECTS. SYSTEM PERFORMANCE, RNA, AND COST DAT ...

    SBIR Phase I 1991 Department of DefenseNavy
  5. SEQUENTIAL DESIGNS FOR MINE WARFARE PLANNING

    SBC: The Associated Corp            Topic: N/A

    THE OBJECTIVE OF THIS PROPOSED RESEARCH IS TO DEVELOP NEW ANALYTIC METHODS FOR CHARACTERIZING MINE WARFARE EFFECTIVENESS. IT WILL USE A COMBINATION OF A PRIOR KNOWLEDGE OF SEQUENTIAL CHOICE OUTCOMES AND UNCERTAINTY IN SEQUENTIAL OUTCOMES. THE APPROACH WILL BE TO DEVELOP A SEQUENTIAL DESIGN ANALYSIS OF PERFORMANCE FOR INDIVIDUAL MINE FIELDS WHICH FULLY CHARACTERIZES SYSTEM PERFORMANCE LINKED TO OBJ ...

    SBIR Phase I 1987 Department of DefenseNavy
  6. SUBMARINE COMBAT SYSTEM OPERATOR TRAINING WORKSTATION CONCEPTS

    SBC: Business And Engineering Tech            Topic: N/A

    THIS TASK WILL IDENTIFY THE ISSUES CONCERNING COMBAT SYSTEM TRAINING REQUIREMENTS. IN ADDITION TO FUNCTIONAL NEEDS, THE ISSUES OF EASE OF SYSTEM UPGRADES AND RAPID PROTOTYPING WILL BE ADDRESSED. INITIAL INPUT DATA WILL BE OBTAINED FROM NAVAL TRAINING PLANS, AND EXISTING TRAINING DEVICE CAPABILITIES. THIS WILL IDENTIFY THE LEVELS OF REQUIRED TRAINING AND THE SKILLS THAT MUST BE TAUGHT. A WORKSTATIO ...

    SBIR Phase I 1991 Department of DefenseNavy
  7. SUBMARINE COMBAT SYSTEM ARCHITECTURE WITH WORKSTATIONS

    SBC: DEEGAN RESEARCH GROUP, INC.            Topic: N/A

    CURRENT SUBMARINE COMBAT SYSTEM ARCHITECTURES REFLECT A WEAK LINKAGE FROM OPERATIONAL REQUIREMENTS TO IMPLEMENTATION. ARCHITECTURES RANGE FROM THOSE WITH LARGE CENTRAL COMPUTERS TO THOSE WITH CLUSTERED DISTRIBUTED PROCESSORS. SINGLE POINTS OF FAILURE, DATA BOTTLENECKS, AND PROCESSOR CONFLICTS RESULT FROM ARCHITECTURES THAT DO NOT HAVE OPERATIONAL REQUIREMENTS AS THEIR BASIS. THE EFFORT PROPOSED US ...

    SBIR Phase I 1991 Department of DefenseNavy
  8. COMBINED MODELS FOR COMBAT SYSTEM ASSESSMENT

    SBC: DEEGAN RESEARCH GROUP, INC.            Topic: N/A

    TACTICAL PERFORMANCE, RELIABILITY, AND COST ARE COMPLIMENTARY FACTORS IN SYSTEM DESIGN BUT THERE IS NO ONE TOOL TO EFFECTIVELY COMPARE ATTRIBUTES IN THESE DISPARATE DISCIPLINES. THERE ARE COMPUTER PROGRAMS TO ESTIMATE SYSTEM PERFORMANCE AGAINST THE THREAT, COMPUTER MODELS TO PREDICT RELIABILITY IN A GIVEN ENVIRONMENT, AND COST MODELS TO ESTIMATE BOTH ACQUISITION AND OPERATIONS OVER TH6 LIFE OF A S ...

    SBIR Phase I 1991 Department of DefenseNavy
  9. HF POWER SUPPLY FOR SUBMARINE COMBAT SYSTEMS

    SBC: DEEGAN RESEARCH GROUP, INC.            Topic: N/A

    RELIABLE AND CONTINUOUS POWER TO SUBMARINE ELECTRONICS IS ESSENTIALFOR MISSION EXECUTION AND FOR THE SAFE OPERATION OF THE SHIP. DIGITAL ELECTRONICS CANNOT CONTINUE OPERATION THROUGH EVEN VERY SHORT POWER OUTAGES CAUSE BY BUS TRANSFER DEVICES, THAT HAVE HISTORICALLY BEEN SUFFICIENT FOR ANALOG COMBAT SYSTEMS. THE RESTART AND RELOAD THAT A DIGITAL SYSTEM MUST EXECUTE AFTER A SHORT POWER INTERRUPTION ...

    SBIR Phase I 1991 Department of DefenseNavy
  10. Electronic Warfare Adaptive Spatial/Spectral Cancellation

    SBC: DEEGAN RESEARCH GROUP, INC.            Topic: N/A

    Proposed for development is an escape trunk cofferdam that is made of a set of rigid (composite sandwich) cylindrical sectors joined by longitudinal sealing joints. The cofferdam is attached to the escape trunk's bubble skirt by an attachment ring whichallows the sections of the cofferdam to be staged below the hatch before it is opened. When the hatch is opened, the sectors are raised through t ...

    SBIR Phase I 2001 Department of DefenseNavy
US Flag An Official Website of the United States Government