You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Construction of 3-D Terrain Models from BIG Data Sets

    SBC: Scalable Algorithmics USA            Topic: A13AT005

    The objective of this proposal is to design, analyze, and implement scalable algorithms for analysis-driven construction of high-resolution 3D terrain models from BIG terrain data sets, and to build a software infrastructure for making analysis-prepared terrain models available to data consumers on multiple platforms. Analysis-driven modeling means that the construction of the model is influence ...

    STTR Phase I 2013 Department of DefenseArmy
  2. Accommodation integrated technology to minimize the impact of disability on students’ assessment performance

    SBC: 3-C Institute for Social Development, Inc.            Topic: 84133S1

    There is growing interest in computerized systems to increase accessibility of assessments for students with disabilities. Technology offers an ideal platform for implementing Universal Design (UD) principles for assessment to better accommodate student diversity and support broad student participation. The goal of this SBIR project is to integrate Universal Design principles for assessment into t ...

    SBIR Phase I 2013 Department of Education
  3. Advanced Warhead Design

    SBC: CORVID TECHNOLOGIES, LLC            Topic: A13054

    Corvid Technologies is pleased to offer comprehensive computational analysis, experimental testing, and design of an advanced warhead. The objective is to design a warhead capable of overpressure defeat of point detonating fuses in rocket, artillery, and mortar (RAM) targets. A successful Phase I will utilize Corvid's vast experience with high-fidelity computational physics to select an app ...

    SBIR Phase I 2013 Department of DefenseArmy
  4. Common Software Foundation

    SBC: Veloxiti, Inc.            Topic: A13032

    The objective for this effort is to design and develop a common software foundation for the Army to use in a variety of deployment environments including mobile / handheld devices, mounted units and command posts. The work to be done involves both the development of a software architecture and the implementation of common software foundation engineering tools and libraries. During Phase I of thi ...

    SBIR Phase I 2013 Department of DefenseArmy
  5. Orthogonal Space Projection Processing with Optimized Waveform Selection for Discrete Clutter Mitigation

    SBC: PROPAGATION RESEARCH ASSOCIATES, INC            Topic: A13055

    PRA is proposing an innovative Orthogonal Space Projection (OSP) processing technology and a parallel processing architecture to adaptively cancel discrete clutter in real-time. The OSP technique utilizes adaptive waveform diversity with a suite of waveforms with low correlation time-sidelobes. In addition a unique phase differencing technique is used to identify the location of discrete clutter ...

    SBIR Phase I 2013 Department of DefenseArmy
  6. A Standards Based, Open-Architecture, Ruggedized Tactical Microgrid Controller

    SBC: OPEX SYSTEMS, LLC            Topic: OSD12EP4

    The Army is addressing a technical challenge of constrained data interface to vendor supplied equipment, to integrate Energy Storage (ES) and tactical Energy Assets (EA) to improve fuel efficiency and reduce wear. The Phase I effort will investigate the feasibility of developing a ruggedized Intelligent Power Management Controller (IPMC) which will act as (a) an Universal Data Integration Gatew ...

    SBIR Phase I 2013 Department of DefenseArmy
  7. Development of linear/non-linear radar system

    SBC: VADUM INC            Topic: A13018

    In this program Vadum will develop a radar system capable of linear and nonlinear detection schemes for electronics detection (E-Det) and a linear Forward Looking Ground Penetrating Radar (FLGPR). The radar designed in this effort will leverage existing Vadum linear and nonlinear radar sensors for detecting electronics associated with RCIEDs and extend this baseline capability with innovation thro ...

    SBIR Phase I 2013 Department of DefenseArmy
  8. The Most Efficient (TME) Cold Chain Container for Blood

    SBC: RESODYN CORPORATION            Topic: A123113

    Resodyn Corporation proposes to develop a novel cold chain system with a Lifetime Warranty for the vacuum container. The container composes a passive energy efficient system for transporting blood and pharmaceuticals in hostile environments for up to three days. Capacity is four 500 ml liter blood transfusion bags. Energy efficiency is possible by the novel shape and super insulating qualities ...

    SBIR Phase I 2013 Department of DefenseArmy
  9. Fusing Uncertain and Heterogeneous Information Making Sense of the Battlefield

    SBC: Veloxiti, Inc.            Topic: OSD12LD2

    ASI proposes to develop and evaluate a Phase I Demonstration System for the Improved Fusion Algorithm System (IFAS) based on its artificial intelligence technology for building Associate Systems. This Demonstration System will be based on requirements analysis with a written requirements document and will be evaluated by military operator users. Requirements analysis will include performance of ...

    SBIR Phase I 2013 Department of DefenseArmy
  10. Dynamic Narrative Generation Software To Improve Social And Behavioral School Readiness Skills Needed For The Successful Transition To Grade School

    SBC: 3-C Institute for Social Development, Inc.            Topic: N/A

    The project team is developing a prototype of a web-based intervention for pre-kindergarten and kindergarten students to prepare for the transition to grade school. The product will support students as they create stories using a step-by-step scripted interactive process. The stories will focus on skills that are related to school readiness, such as self-regulation, positive behaviors with peers, ...

    SBIR Phase I 2013 Department of Education
US Flag An Official Website of the United States Government