You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Construction of 3-D Terrain Models from BIG Data Sets
SBC: Scalable Algorithmics USA Topic: A13AT005The objective of this proposal is to design, analyze, and implement scalable algorithms for analysis-driven construction of high-resolution 3D terrain models from BIG terrain data sets, and to build a software infrastructure for making analysis-prepared terrain models available to data consumers on multiple platforms. Analysis-driven modeling means that the construction of the model is influence ...
STTR Phase I 2013 Department of DefenseArmy -
Accommodation integrated technology to minimize the impact of disability on students’ assessment performance
SBC: 3-C Institute for Social Development, Inc. Topic: 84133S1There is growing interest in computerized systems to increase accessibility of assessments for students with disabilities. Technology offers an ideal platform for implementing Universal Design (UD) principles for assessment to better accommodate student diversity and support broad student participation. The goal of this SBIR project is to integrate Universal Design principles for assessment into t ...
SBIR Phase I 2013 Department of Education -
Advanced Warhead Design
SBC: CORVID TECHNOLOGIES, LLC Topic: A13054Corvid Technologies is pleased to offer comprehensive computational analysis, experimental testing, and design of an advanced warhead. The objective is to design a warhead capable of overpressure defeat of point detonating fuses in rocket, artillery, and mortar (RAM) targets. A successful Phase I will utilize Corvid's vast experience with high-fidelity computational physics to select an app ...
SBIR Phase I 2013 Department of DefenseArmy -
Development of linear/non-linear radar system
SBC: VADUM INC Topic: A13018In this program Vadum will develop a radar system capable of linear and nonlinear detection schemes for electronics detection (E-Det) and a linear Forward Looking Ground Penetrating Radar (FLGPR). The radar designed in this effort will leverage existing Vadum linear and nonlinear radar sensors for detecting electronics associated with RCIEDs and extend this baseline capability with innovation thro ...
SBIR Phase I 2013 Department of DefenseArmy -
The Most Efficient (TME) Cold Chain Container for Blood
SBC: RESODYN CORPORATION Topic: A123113Resodyn Corporation proposes to develop a novel cold chain system with a Lifetime Warranty for the vacuum container. The container composes a passive energy efficient system for transporting blood and pharmaceuticals in hostile environments for up to three days. Capacity is four 500 ml liter blood transfusion bags. Energy efficiency is possible by the novel shape and super insulating qualities ...
SBIR Phase I 2013 Department of DefenseArmy -
Dynamic Narrative Generation Software To Improve Social And Behavioral School Readiness Skills Needed For The Successful Transition To Grade School
SBC: 3-C Institute for Social Development, Inc. Topic: N/AThe project team is developing a prototype of a web-based intervention for pre-kindergarten and kindergarten students to prepare for the transition to grade school. The product will support students as they create stories using a step-by-step scripted interactive process. The stories will focus on skills that are related to school readiness, such as self-regulation, positive behaviors with peers, ...
SBIR Phase I 2013 Department of Education -
Dynamic E-Learning to Improve Postsecondary Transition Outcomes for Secondary Students with High Functioning Autism
SBC: 3-C Institute for Social Development, Inc. Topic: N/AThis project team will develop a web-based product to engage 11th and 12th grade high school students with HF-ASD in a self-paced online interactive course to learn about the transition to college, learn specific resilience strategies for coping with the transition to college, and to practice applying those strategies via participation in interactive simulated exercises. The exercises will include ...
SBIR Phase I 2013 Department of Education -
Dual-Mode Continuous-Wave Ladar and Optical Communications System
SBC: Bridger Photonics, Inc. Topic: A12089Because the data products generated by modern imaging ladar systems are inherently large in information content, there is currently a severe bottleneck in the communications of these products to end users, particularly when full-waveform recovery is desired. Bridger Photonics Inc. proposes to develop a dual-mode laser system capable of performing laser radar imaging as well as high speed free-spa ...
SBIR Phase I 2013 Department of DefenseArmy -
Instrument for Measuring Millimeter-Wave Polarimetric Bidirectional Reflectance Distribution Function
SBC: Applied Radar, Inc. Topic: A123105The proposal will perform study and design of a gonioreflectometer or equivalent instrument that can measure Polarimetric Bidirectional Reflectance Distribution Function (PBRDF) in the millimeter wave (mmW) spectrum using heterodyne transmit/receive (Tx/Rx) radar technology. The instrument will be used to coherently measure amplitude and phase information and construct a BRDF with user-specified ...
SBIR Phase I 2013 Department of DefenseArmy -
Nondestructive Concrete Characterization System
SBC: FDH Engineering Inc. Topic: A12aT013With the advent of very high strength concrete, such as that manufactured by LaFarge, calculations that have been used historically to determine the explosive content needed to breach concrete structures have been compromised. As a result of this and other mission critical issues, the Army has indentified a need to develop a man-portable device capable of estimating the thickness and strength of ...
STTR Phase I 2013 Department of DefenseArmy